Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 71672: 1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT
Project Number:
Title:
Walla Walla River Basin Fish Habitat Enhancement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
71672
Contract Title:
1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT
Contract Continuation:
Previous: Next:
68523: 1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT
  • 73982 REL 12: 1996-046-01 EXP WALLA WALLA BASIN: ENHANCE & RESTORE FISH HABITAT
Contract Status:
Closed
Contract Description:
The CTUIR Walla Walla River Basin Fish Habitat Enhancement Project, initiated in 1996, is an ongoing effort to monitor, protect, enhance, and restore the natural form and function of rivers, floodplains, and native fish habitat.

Major tasks to be completed by the project in this funding cycle include:  

2016 Project Focus and Deliverable Summary;

1 SF Touchet R RM 7 Construction Based on estimate provided by engineered design, will go to bid
2 SF Touchet R Rainwater Reach Design CTUIR professionals shall conduct surveys and initiate design to 60% level, design completion shall go out to bid
3 SF WWR Harris Park Reach Design CTUIR professionals shall conduct surveys and initiate design to 60% level, design completion shall go out to bid
4 WWR Waggoner Reach Design CTUIR paying for design advancement beyond existing preliminary draft design for lower river rearing habitat to assist WWCD sponsorship of construction in  2017
5 Lower Mill Creek Assessment and Strategic Plan Continuation from FY15 Remaining balance: bid amount minus FY 15 expenditures and cost share partner contribution
6 SF Touchet R RM 7 Observation Based upon quote submitted by SF Touchet RM 7 restoration design engineer
Account Type(s):
Expense
Contract Start Date:
02/01/2016
Contract End Date:
01/31/2017
Current Contract Value:
$795,799
Expenditures:
$795,799

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Julie Burke Umatilla Confederated Tribes (CTUIR) Yes Administrative Contact julieburke@ctuir.org (541) 429-7292
Alexandra Fitzgerald Umatilla Confederated Tribes (CTUIR) Yes Technical Contact alexandrafitzgerald@ctuir.org (541) 429-7549
Jonathan Goodman Bonneville Power Administration Yes Env. Compliance Lead jdgoodman@bpa.gov (503) 230-4764
Katey Grange Bonneville Power Administration No Interested Party kcgrange@bpa.gov (503) 230-4047
Ethan Green Umatilla Confederated Tribes (CTUIR) No Interested Party ethangreen@ctuir.org (541) 429-7555
Stephanie Green Bonneville Power Administration Yes Contracting Officer sagreen@bpa.gov (360) 418-2710
Eric Hoverson Umatilla Confederated Tribes (CTUIR) Yes Contract Manager erichoverson@ctuir.org (541) 429-7555
Gary James Umatilla Confederated Tribes (CTUIR) No Interested Party garyjames@ctuir.org (541) 429-7285
Michael Lambert Umatilla Confederated Tribes (CTUIR) Yes Supervisor mikelambert@ctuir.org (541) 429-7240
Andre L'Heureux Bonneville Power Administration No Interested Party allheureux@bpa.gov (503) 230-4482
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Gerald Middel Umatilla Confederated Tribes (CTUIR) No Technical Contact geraldmiddel@ctuir.org (541) 969-9925
Michelle Thompson Umatilla Confederated Tribes (CTUIR) No Administrative Contact michellethompson@ctuir.org (541) 429-7227
Tracey Yerxa Bonneville Power Administration Yes COR tyerxa@bpa.gov (503) 230-4738


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Salmonid habitat improved at RM 7 of the South Fork Touchet River A: 29. Habitat restoration of the South Fork Touchet River, RM 7.5 10/31/2016 09/15/2016
Improve riparian vegetative components and physical habitat metrics B: 47. Enhance riparian vegetative components at select project sites 11/30/2016 11/30/2016
Construction Management Complete C: 100. Engineered construction oversight, SF Touchet River 09/30/2016 09/15/2016
Projects identified and prioritize; short and long term D: 114. Identify and select habitat projects that benefit salmonids 01/31/2017 09/30/2016
Upload complete Assessment and Action Plan E: 115. Completion of the Lower Mill Creek Assessment 12/31/2016 12/30/2016
Upload results and recommendations derived from inventory F: 115. South Fork Touchet River, RM 10 Inventory 10/31/2016 09/22/2016
Upload results and recommendations derived from inventory G: 115. South Fork Walla Walla River Inventory 01/31/2017 10/12/2016
Upload results and recommendations derived from inventory H: 115. Walla Walla River, Nursery Bridge Inventory 01/31/2017 01/31/2017
Project administration activities managed effectively I: 119. Conduct all project management activities 01/31/2017 01/31/2017
Provide technical support through interagency coordination and public forum J: 122. Provide technical support 01/31/2017 01/31/2017
Completed Annual Report K: 132. Annual Progress Report (2-1-16) to (1-31-17) 01/31/2017 01/31/2017
Environmental compliance L: 165. Produce environmental compliance for on the ground work 07/31/2016 05/18/2016
Upload designs, basis of design report, and construction sequence plan M: 175. South Fork Touchet River, RM 10 Design 01/31/2017 09/22/2016
Upload designs, basis of design report, and construction sequence plan N: 175. South Fork Walla Walla River Design 01/31/2017 01/31/2017
Produce final design O: 175. Walla Walla River, Waggoner Reach Design 01/31/2017 06/22/2016
Upload designs, basis of design report, and construction sequence plan P: 175. Walla Walla River, Nursery Bridge Design 01/31/2017 01/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 29 Habitat restoration of the South Fork Touchet River, RM 7.5 04/30/2016
B 47 Enhance riparian vegetative components at select project sites 04/25/2016
C 100 Engineered construction oversight, SF Touchet River 02/01/2016
D 114 Identify and select habitat projects that benefit salmonids 02/01/2016
E 115 Completion of the Lower Mill Creek Assessment 04/25/2016
F 115 South Fork Touchet River, RM 10 Inventory 04/25/2016
G 115 South Fork Walla Walla River Inventory 04/25/2016
H 115 Walla Walla River, Nursery Bridge Inventory 04/25/2016
I 119 Conduct all project management activities 02/01/2016
J 122 Provide technical support 02/01/2016
K 132 Annual Progress Report (2-1-16) to (1-31-17) 02/01/2016
L 165 Produce environmental compliance for on the ground work 02/01/2016
M 175 South Fork Touchet River, RM 10 Design
N 175 South Fork Walla Walla River Design
O 175 Walla Walla River, Waggoner Reach Design
P 175 Walla Walla River, Nursery Bridge Design
Q 185 Periodic Status Reports for BPA 02/01/2016