Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73548 REL 65: 2007-224-00 EXP CCT METHOW RESTORATION
Project Number:
Title:
Okanogan Subbasin Habitat Implementation Program (OSHIP)
Stage:
Complete
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
73548 REL 65
Contract Title:
2007-224-00 EXP CCT METHOW RESTORATION
Contract Continuation:
Previous: Next:
73548 REL 34: 2007-224-00 EXP CCT METHOW RESTORATION
Contract Status:
Closed
Contract Description:
CCR-43399:

Through this contract action the following changes are proposed:

-Silver Reach Instream Enhancement Design element has been completely descoped
-Beaver Relocation Project has been descoped
-Upper Twisp River LWD supplementation design element has been added
-Little Bridge Creek LWD and BDA design element has been added
-Lower Beaver Creek enhancement design element has been added
-WE budgets were adjusted accordingly
-Line Item Budget associated with this Release, has been modified to reflect changes in work

This contract is to conduct aquatic habitat protection/restoration projects in the Methow Subbasin.  Projects to be implemented will primarily emphasize benefits to ESA listed spring chinook, summer steelhead, and bull trout and secondarily to other salmonids and Pacific lamprey. Work will include regular attendance of coordination meetings with project sponsors and oversight groups to ensure that work is conducted consistent with established needs and in coordination with other existing restoration efforts.

Work under this contract cycle will include: side channel connection to increase rearing habitat and habitat complexity; instream enhancements to increase aquatic complexity; irrigation system improvements to increase efficiency and reduce instream surface withdrawal and improve fish passage; beaver relocation to promote an increase in salmonid rearing habitat as well as to increase base flows and reduce water temperatures during the summer months; culvert removal and replacement to improve fish passage, public outreach to educate local school students and the public at large as to the value of salmon recovery and habitat restoration in the Methow Valley, and habitat restoration planning and strategy development.

Projects prioritization and selection is based primarily upon results of the newly completed EDT model for the Methow Subbasin with consideration also given to the Regional Technical Team Biological Strategy and local expert opinion.    

For projects: Silver Reach Instream Enhancements; Devany Side Channel Reconnection; and Ben Canyon Culvert Replacement; project design will be subcontracted to local sponsors; The Methow Salmon Recovery Foundation and Trout Unlimited Washington Water Project.  Delays resulting from: loss of key engineering personnel, longer than anticipated design completion, and completion of the Section 106 process, have resulted in the need to reschedule several projects from contract 73548 Release 34 to this contract period.  

CTCR staff funding allocated under this contract are for: Paul Wagner (CTCR Methow Contract Manager - contract management), Keith Kistler (OSHIP Contract Manager - contract coordination); Chris Fisher (Anadromous Habitat Subdivision Supervisor - program supervision); and an Engineer (TBD, design review).  Field staff are not permanently assigned to this contract but are borrowed on an as needed basis as available from other CTCR programs to assist in field activities.  Field biologists (Biologist II positions) anticipated to be available to assist in Methow field work under this contract cycle are Matt Young, John Rohrback, and Rhonda Dasher.  Field Technician staff are used as available.to assist in field work. Field work to be conducted during this contract period include Beaver Dam Analog (BDA) pre-site assessments to determine suitable future BDA sites as well as participation in other data gathering activities in conjunction with planning and strategy development.  
      
Cultural resource surveys as required under Section 106 of the NHPA, unless previously completed prior to this contract period, will be completed by the Colville Confederated Tribes Cultural Resource staff.

The contractor (CTCR), its designated agents, sub-consultants and project stakeholders will be available, responsive and will collaboratively address contract related issues during the term of the contract. Contract issues include but are not limited to technical, policy, regulatory, project management and associated elements related to the project. Successful execution of this contract is contingent on alignment of the preceding contract issues with the BPI and BPA contracting processes, project management plans, design review protocols (including but not limited to BPA RRT design review, and integration of input and comments from BPA).

CTCR Contract Manager, CTCR's sponsor, and CTCR's design consultants will all cooperate, coordinate, collaborate, and maintain effective communication with BPA PM/COR, EC Lead, RRT Lead, and Hydraulic Engineer during the entire length of this contract with regards to project design.  CTCR and its subcontractors will address BPA comments and concerns, and the two entities will arrive at a mutual beneficial consensus. CTCR contract manager will upload all the subcontracts being executed under this contract.





Account Type(s):
Expense
Contract Start Date:
07/01/2019
Contract End Date:
06/30/2020
Current Contract Value:
$304,848
Expenditures:
$304,848

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Documentation B: 165. Produce Compliance Documentation 06/30/2020 06/30/2020
Methow Restoration Project Management C: 119. Project Management 06/30/2020 06/30/2020
Watershed coordination D: 191. Methow Subbasin Coordination 06/30/2020 06/30/2020
Prioritized Project List E: 114. Project Identification and Selection Process 02/10/2020 02/10/2020
Devany Side Channel/Aquatic Complexity Project Final Design F: 175. Devany Side Channel/Aquatic Complexity Project Design 06/30/2020
Methow Valley Outreach and Education Annual Report I: 99. Methow Valley Public Outreach 06/30/2020 06/30/2020
Ben Canyon Creek Road Culvert Replacement Project Design J: 175. Ben Canyon Creek Road Culvert Replacement Project Design 06/30/2020 06/30/2020
Maltais Irrigation Well K: 82. Maltais Irrigation Well 06/30/2020
Elimination of Maltais Surface Diversion L: 84. Maltais Surface Diversion 06/30/2020
Cultural Resource Surveys for Habitat Improvement Projects M: 165. Cultural Resource Surveys 06/30/2020 06/30/2020
Final Draft Texas Creek Restoration Strategy Plan N: 174. Texas Creek Restoration Strategy 06/30/2020 06/30/2020
Final Smith Canyon Creek Fish Passage Plan O: 174. Smith Canyon Creek Fish Passage Plan 06/30/2020
Upper Twisp LWD Supplementation Q: 175. Upper Twisp LWD supplementation: 30% Design Development 06/30/2020
Little Bridge Creek LWD and BDA Design R: 175. Little Bridge Creek LWD and BDA: 30% Design Devlopment 06/30/2020 06/30/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 114 Identify and Select Projects
  • 5 instances of WE 175 Produce Design
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 174 Produce Plan
  • 6 instances of WE 175 Produce Design
  • 1 instance of WE 82 Install Well
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 07/01/2019
B 165 Produce Compliance Documentation 07/01/2019
C 119 Project Management 07/01/2019
D 191 Methow Subbasin Coordination 07/01/2019
E 114 Project Identification and Selection Process 07/01/2019
F 175 Devany Side Channel/Aquatic Complexity Project Design
G 175 Silver Reach Instream Enhancements Design
H 190 Beaver Relocation Project
I 99 Methow Valley Public Outreach 07/01/2019
J 175 Ben Canyon Creek Road Culvert Replacement Project Design
K 82 Maltais Irrigation Well 04/15/2020
L 84 Maltais Surface Diversion
M 165 Cultural Resource Surveys
N 174 Texas Creek Restoration Strategy
O 174 Smith Canyon Creek Fish Passage Plan
P 132 No report is required per COR
Q 175 Upper Twisp LWD supplementation: 30% Design Development
R 175 Little Bridge Creek LWD and BDA: 30% Design Devlopment
S 175 Lower Beaver Creek Enhancement: 30% Design Development