Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73888: 1992-026-01 EXP GRMW SUBBASIN GAUGING STATION OPERATION 2017
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
73888
Contract Title:
1992-026-01 EXP GRMW SUBBASIN GAUGING STATION OPERATION 2017
Contract Continuation:
Previous: Next:
70452: 1992-026-01 EXP GRMW SUBBASIN GAUGING STATION OPERATION 2016
  • 77023: 1992-026-01 EXP GRMW SUBBASIN GAUGING STATION OPERATION 2018
  • 79905 REL 2: 1992-026-01 EXP GRMW SUBBASIN GAUGING STATION OPERATION 2019
Contract Status:
Closed
Contract Description:
Objective

The project objective is to continue stream flow gauging at twelve locations in the Grande Ronde Basin.  The project will maintain annual flow records at these stations.  The data from these  stations, as well as the other stations, will provide flow information essential to water management, water quality control, and evaluation of restoration projects in the Grande Ronde Basin.

The Grande Ronde Model Watershed Program Operations - Action Plan identifies both water quantity and quality as major issues/concerns in the  Grande Ronde Basin.  Stream flow gauging stations provide essential data for water management decisions and evaluating success of water conservation restoration projects.  Long-term continuous stream flow monitoring is necessary.  

Currently there are seven gauging stations in the Upper and Middle Grande Ronde (Union County) and five in the Lower Grande Ronde (Wallowa County) funded in this SOW.  All the stations have flow records dating back at least 20 years.  The Grande Ronde River near Perry river reach has continuously recorded flows since 1904 and provides hourly flow information via satellite telemetry and internet support provided by the National Weather Service.   The Upper Catherine Creek station has continuously recorded flows since 1912.  Five stations are cooperatively supported by the Forest Service (USFS funds) and operated out of the local Water Master office.  Two sites; Catherine Creek at Union, and Grande Ronde River near Perry are cooperative stations operated out of the local Watermaster Office.  Five gauges exist in Wallowa County including two each on the Lostine and Wallowa Rivers and one on Bear Creek.  The upper Lostine and Bear Creek sites have been in operation since the early 1900's with both Wallowa sites and the Lower Lostine having been established in 1995.

Perry
Catherine Creek at Union
Lostine River (2)
Wallowa River (2)
Bear Creek
USFS Sites (5)          

Union County provides administrative support and a Watermaster Assistant position using funding from the cooperative program to run and maintain the cooperative stations under the supervision of the local Watermaster.   This contract addresses the operation of twelve gauges in the Grande Ronde Basin; seven in Union County and five in Wallowa County.

The operation of gauging sites in the Grande Ronde Basin has depended on support from BPA and OWEB for the last 20-years.  In the past USGS and the BOR have either operated gauging stations or helped fund their operation.  The USGS discontinued operation of the upper Catherine Creek site and a station near Perry on Grande Ronde River several years ago.  OWRD has taken over the Catherine Creek station. The BOR is no longer able to partially support any of the stations in the Grande Ronde Basin.  

Clarification:  As this contract covers two water years and has several time overlapping work elements several points of clarification need to be made:

1.  A water year starts on October 1 and ends on September 30 of the following year.
2.  Provisional (non final) flow record is compiled immediately following the conclusion of the water year and this work is typically done between October 1 and December 31.
3.  Final flow record is completed following provisional record completion and this work is typically done between January 1 and April 1.  
4.  All provisional and final record production is completed after data is collected for one complete water year.
5.  Final flow record is not typically delivered until 7 months post water year completion.
6.  As flow data is collected for one water year provisional and final record is compiled for the previous water year.
Account Type(s):
Expense
Contract Start Date:
10/01/2016
Contract End Date:
09/30/2017
Current Contract Value:
$55,010
Expenditures:
$55,010

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete environmental compliance process A: 165. Environmental compliance documentation 09/30/2017 09/30/2017
Complete data collection B: 157. Collect stream flow measurements on twelve Grande Ronde Basin gauging stations 09/30/2017 09/30/2017
Complete provisional and final flow records C: 162. Generate provisional and final flow records 09/30/2017 09/30/2017
Complete station maintenance as needed D: 148. Repair/maintain/replace stream flow gauging station 09/30/2017 09/30/2017
All administrative tasks fulfilled with timely quality products E: 119. Project administration 09/30/2017 09/30/2017
2017 Water Year RME Report F: 132. 2017 Water Year Report - 10/1/16 - 9/30/17 09/29/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance documentation 10/01/2016
B 157 Collect stream flow measurements on twelve Grande Ronde Basin gauging stations 07/20/2016
C 162 Generate provisional and final flow records 10/01/2016
D 148 Repair/maintain/replace stream flow gauging station 07/20/2016
E 119 Project administration 10/01/2016
F 132 2017 Water Year Report - 10/1/16 - 9/30/17 10/01/2016
G 185 Quarterly Status Reports 10/01/2016