SOW Report
Contract 74313 REL 70: 1994-042-00 EXP TROUT CREEK OPERATION AND MAINTENANCE
Project Number:
Title:
Trout Creek Summer Steelhead Habitat Restoration, Conservation and Population Monitoring
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Deschutes 100.00%
Contract Number:
74313 REL 70
Contract Title:
1994-042-00 EXP TROUT CREEK OPERATION AND MAINTENANCE
Contract Continuation:
Previous: Next:
74313 REL 48: 1994-042-00 EXP TROUT CREEK OPERATION AND MAINTENANCE
  • 74313 REL 92: 1994-042-00 EXP TROUT CREEK OPERATION AND MAINTENANCE
Contract Status:
Closed
Contract Description:
The Oregon Department of Fish and Wildlife (ODFW) Trout Creek Habitat Restoration project is an ongoing project.  The biological goal of the project to increase the out-migrant population of Endangered Species Act (ESA) listed Distinct Population Segment (DPS) Mid-Columbia River Summer Steelhead to an average of 100,000 smolts per year as estimated at the ODFW operated and Bonneville Power Administration (BPA) funded out-migrant trap located on Trout Creek at river mile 3.2.  To accomplish this goal this project has undertaken several ambitious projects in the past several years.  Additional projects are constantly being implemented and funding from outside sources has already been obtained for several  projects such as: 1) The Little Trout Creek Project 2020, 2)The Trout and Opal Creek Fish passage project 2021, and 3) The Foley Creek road removal and stream realignment project 2022.  Additional project develop continues and additional restoration projects within the Trout Creek Watershed such as the Beaver Creek Watershed restoration project are targeted to be implemented over the next few years.  

Based on 37 years of combined experience and observation in the Trout Creek Watershed, the ODFW and JCSWCD Project Managers have gained the necessary knowledge and relationships with the landowners that own property in the watershed. This information along with numerous planning documents and assessments has allowed us to prioritize stream reaches and upland habitats that provide the best restoration opportunities in the basin.   In 2002, the Trout Creek Watershed Assessment (Runyon et. al. 2002) was developed and became a formal framework for strategic planning for restoration actions in the watershed.  More recently, the Middle Deschutes Watershed Council revised this document, creating the Watershed Restoration Action Plan, April 2015 (Runyon et. al. 2015).  The tasks below give an idea of the issues addressed in and indicate the scope of the project actions undertaken to reach the projects ambitious goal.

1) Enhance Riparian Habitat - Goal 2 Strategy 2-B thru 2-F

Results to date: The Trout Creek Restoration project has 54 stream miles protected from livestock grazing and 4554 acres of riparian exclosure that are maintained by ODFW.  Additionally, the working partnership with Jefferson County Soil and Water District (JCSWCD) and Natural Resource Conservation District (NRCS) and Farm Service Agency (FSA) has resulted in an additional 14 stream miles protected from livestock grazing and an additional 468 acres of riparian grazing exclosures.  Restoration projects to date have planted over 120,000 trees and shrubs.  Recently 1.2 miles of a total channel relocation and floodplain restoration project was constructed with funds from outside sources.  Over the past 15 years this project has leveraged BPA funds to secure outside funds to design, implement, and monitor 11 miles of stream relocation and floodplain work in the basin.  

Summary:  In the 700 square mile Trout Creek watershed there are approximately 120 miles of fish bearing streams.  Of these fish bearing streams 52% are within riparian exclosures and 11% are within inaccessible canyons.  

Work to complete: Continue to maintain, monitor, and document habitat changes within existing ODFW exclosures and within channel realignment projects.  Continue work with private landowners to develop projects that will enhance riparian habitat.  Continue to develop partnerships with other agencies to facilitate funding sources and programs that will result in improved riparian habitat.  Utilize monitoring and evaluation results to refine projects and to provide information on fishery response to actions.  Additionally, use monitoring and evaluation data to assist in the negotiation for additional restoration projects with private landowners.

2) Enhance Instream and Floodplain Habitat - Goal 2 Strategy 2-B thru 2-F

Results to date:  Planned, acquired funding, designed, and constructed instream and riparian habitat restoration projects on 12.5 stream miles.  Along the 12.5 miles of restoration there has been over one mile of stream length added, an average flood prone width increases of over 175%, over 4,900 pounds of native grass and forb seed and over 85,000 trees and shrubs planted, 9.5 surface acres of wetland created, and over 270 acres enrolled into the CREP program.  This projects' monitoring and evaluation program and the resulting data stream has served to initiate a two-mile stream restoration project on the Mainstem of Trout Creek in an area where poor habitat conditions limited the success of steelhead spawning and rearing.  Within the forested areas of the basin several hundred habitat boulders and LWD pieces have been placed instream.  

Summary:  In the Trout Creek Watershed there are approximately 120 miles of fish bearing streams.  Of these fish bearing streams approximately 29 miles of stream were altered by channel straightening.  To date 44% of altered streams have been restored.  

Work to complete:  Continue to work with private landowners to develop restoration plans that will enhance instream and floodplain habitat on the remaining 17 miles of altered habitat.  Continue monitoring and evaluation of physical habitat and biological components to assess success of project work and document physical and biological response to actions.  Utilize monitoring and evaluation results to refine projects and to provide information on fishery response to actions.  Continue to gather and use biological and physical habitat data to assist in shaping future restoration projects.  

3) Enhance Irrigation Efficiency to Promote Additional Stream Flow – Goal 2 Strategy 2-A

Results to date:  This project has replaced three gravel push up dams with removable stop log structures complete with fish passage devices.  Additionally, this project has assisted the JCSWCD to implement several water efficiency projects.  These projects have removed eight gravel push up dams and replaced 1.81 miles of open ditch with pipe and a conversion of flood irrigation to sprinklers.  In addition, all points of diversion in the basin have fish screening devices.

Summary:  With the effort from several agencies all points of water diversion have been screened. Through the multiple agency efforts, a total of 16 gravel push up dams have been eliminated and 7.83 miles of open ditch have been eliminated and/or placed in pipe.  

Work to complete:  Continue work with private landowners to remove the last two gravel push up dams.  Continue to develop partnerships with other agencies to facilitate funding sources and programs that will result in improved irrigation efficiencies.

4) Protect high quality high production stream reaches and the surrounding habitat. Goal 1 Strategy 1-A and Goal 4 Strategy 4-A  
Through years of on the ground monitoring project staff has identified high quality stream reaches and has and will continue to will work with owners of these important stream reaches to help assure that these rare stream, riparian, and upland habitats are protected and maintain their high production values.  

Summary:  Project staff is actively working with agencies and groups to maintain high quality habitats.

5) Improve Upland ecosystems and hydrologic processes to support health fish and wildlife populations and enhance watershed health.  Goal 5 Strategy 5-A and 5-B

Project staff has and will continue to coordinate with JCSWCD on projects that promote healthy upland processes that will lead to increases in water quality and quantity to aquatic habitats.

Results:  BPA funding for the Trout Creek Project staff time is being leveraged by JCSWCD in the applications for grants on several upland projects.  This assistance provides the necessary cost share match funds that allow for and increase the ability to secure outside grants to address upland habitats.  

6) Track and examine watershed conditions and monitor fish populations to assess if restoration actions are achieving the goal of the project. Goal 8 Strategy 8-A

Project has a long-term status and trend monitoring program for estimating the summer steelhead outmigrants from the basin.  This consists of the operation of a 5’ screw trap and the operation of 2 PIT tag arrays and a Video weir along with annual redd survey to asses adult run size and migration timing and locations.  Due to funding limitations the seasonal technician that assisted in redd surveys and trap operation will not be hired in this contract.  This will require project staff to delay the start of smolt trapping until April.  This will result in the potential loss of early outmigrant estimation and a reduced confidence in summer steelhead smolt escapement estimation.  

Specific items to be addressed during this contract are:

1)    Little Trout Restoration Project.  
a.    Project staff assisted JCSWCD in the development of a final plan set approved under HIP.  Project staff will work with JCSWCD and property owners to attain final landowner approval of project design elements.
b.    Project staff will work with JCSWCD to attain permits for construction phase of project.
c.    Project staff will coordinate the installation and construction of design elements on project site.  
d.    Project staff will begin revegetation efforts which are expected to continue under future contracts..  

2)    Collect data and develop design for Foley Creek project.
a.    Collect total station data for 3D modeling of Foley Creek Project area.
b.    Work with JCSWCD staff to begin conceptual project design.  
c.    Work with landowner to coordinate design elements that match ranch goals and objectives for the area.

3)  Monitor and maintain over 100 miles of riparian exclusion fencing.  
a   Repair wooden fencing structures where wood post have failed.
b   Repair fence where stream channel movement has reduced effectiveness
c   Work with new landowners in the basin to continue exclusion fencing effectiveness and cooperation

4)  Monitor Summer Steelhead population in the basin.
a   Conduct mark and recapture smolt outmigrant estimation by utilization of 5' screw trap near the mouth of Trout Creek
b  Conduct video weir operation to monitor adult migration of several fish species into basin.
c  Conduct redd surveys to assess spawning timing and location into the basin.  
d  Maintain PIT arrays to determine timing of PIT tagged fish into the basin and determine escapement.

5) Develop Design Data for Trout and Opal Creek fish passage project.
a  Continue to work with Jefferson County Public Works to develop a suitable solution for the replacement of 2 stream crossings
b  Work to find a cost effective replacement for failing CMP culverts that meet county requirements.

6) Maintain offsite water developments for livestock
a  Continue to maintain offsite water developments to increase the effectiveness of riparian exclusion fencing.
Account Type(s):
Expense
Contract Start Date:
02/01/2020
Contract End Date:
01/31/2021
Current Contract Value:
$492,785
Expenditures:
$492,785

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Manage & Administer Project A: 119. Manage & Administer Project 01/31/2021 01/31/2021
Environmental Compliance Complete and Best Management Practices Implemented B: 165. Obtain Environmental Compliance 01/31/2021 01/31/2021
Viable restoration projects identified and selected for further development C: 114. Habitat Restoration Project Development 01/31/2021 01/31/2021
Technical Assistance Provided D: 122. Provide Technical Assistance & Input 01/31/2021 01/31/2021
Foley Creek Project Design data collected E: 175. Foley Creek Channel Realignment and Culvert Removal Project 01/31/2021 01/31/2021
Complete Final Design F: 175. Trout and Opal Creek Confluence - Final Design 01/31/2021 01/31/2021
Floodplain and instream habitat complexity structures Installed G: 29. Little Trout Creek Habitat Improvement - LWD Structures 11/30/2020 11/30/2020
Approved stream crossing installed and fish passage issues eliminated H: 184. Little Trout Creek Habitat Improvement - Improve Stream Crossing 10/31/2020 09/29/2020
Completed channel construction I: 30. Little Trout Creek Habitat Improvement - Channel Construction 11/30/2020 11/30/2020
Floodplain and active stream channel reconnected J: 180. Little Trout Creek Habitat Improvement - Enhance Floodplain 11/30/2020 11/30/2020
Unwanted vegetation within project area removed K: 199. Little Trout Creek Habitat Improvement - Vegetation Removal 10/31/2020 10/31/2020
Disturbed area replanted and reseeded with native species. L: 47. Little Trout Creek Habitat Improvement - Plant Riparian Vegetation 01/31/2021 01/31/2021
Disturbed upland areas will be replanted with native plants and seed. M: 47. Little Trout Creek Habitat Improvement - Plant Upland Vegetation 01/31/2021 01/31/2021
Reduced abundance of Noxious Weeds while promoting native vegetation in and along project areas within Trout Creek N: 198. Establish and maintain a self sustaining native mix of tress shrubs grasses and forbs within project areas. 01/31/2021 01/31/2021
Junipers removed from riparian areas O: 199. Remove encroaching juniper trees from riparian exclosures to promote native tree and shrub density 01/31/2021 01/31/2021
Trout Creek Basin Riparian Exclosures Monitored P: 26. Monitor Exclosures 01/31/2021 01/31/2021
Fences & Water Gaps Maintained Q: 186. Maintain Riparian Corridor Fence 01/31/2021 01/31/2021
Repaired/Maintained Off Channel Water Development Sites R: 186. Repair/Maintain Off Channel Water Development Sites 01/31/2021 01/31/2021
Maintained Instream and Floodplain Structures S: 186. Maintain Instream and Floodplain Structures 01/31/2021 01/31/2021
Past channel realignment instream design work and floodplain shaping actions monitored T: 157. Monitor past channel realignment and floodplain restoration work to refine future habitat design 01/31/2021 01/31/2021
Stream Water Temperature and Ground Water Levels Monitored U: 157. Monitor Stream Water In The Trout Creek Basin 01/31/2021 01/31/2021
Basin Wide Redd Counts V: 157. Adult Steelhead Redd Counts 01/31/2021 01/31/2021
Data Captured In Two Data Bases (One For Adults & One For Juveniles) W: 157. Monitor Smolt Production & Adult Escapement 01/31/2021 01/31/2021
PIT Tag Data Submitted To PTAGIS X: 159. Submit & Acquire PIT Tag Data To/From PTAGIS 01/31/2021 01/31/2021
ESA Listed Mid Columbia Summer Steelhead Monitored Y: 162. Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-Migrant Estimates 01/31/2021 01/31/2021
Final annual report for calendar year 2019 AA: 132. Produce Annual report for 1/1/2019 to 12/31/2019 12/18/2020 12/18/2020
Summer Steelhead Smolts PIT Tagged AB: 158. CCR-45221 PIT Tag Out-Migrant Summer Steelhead Smolts 09/30/2020 09/30/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 2 instances of WE 199 Remove Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 175 Produce Design
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data
Wildlife
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 47 Plant Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage & Administer Project
B 165 Obtain Environmental Compliance
C 114 Habitat Restoration Project Development
D 122 Provide Technical Assistance & Input
E 175 Foley Creek Channel Realignment and Culvert Removal Project 09/08/2020
F 175 Trout and Opal Creek Confluence - Final Design 09/08/2020
G 29 Little Trout Creek Habitat Improvement - LWD Structures 06/16/2020
H 184 Little Trout Creek Habitat Improvement - Improve Stream Crossing 06/16/2020
I 30 Little Trout Creek Habitat Improvement - Channel Construction 06/16/2020
J 180 Little Trout Creek Habitat Improvement - Enhance Floodplain 06/16/2020
K 199 Little Trout Creek Habitat Improvement - Vegetation Removal 06/16/2020
L 47 Little Trout Creek Habitat Improvement - Plant Riparian Vegetation 06/16/2020
M 47 Little Trout Creek Habitat Improvement - Plant Upland Vegetation 06/16/2020
N 198 Establish and maintain a self sustaining native mix of tress shrubs grasses and forbs within project areas. 07/01/2020
O 199 Remove encroaching juniper trees from riparian exclosures to promote native tree and shrub density 07/01/2020
P 26 Monitor Exclosures
Q 186 Maintain Riparian Corridor Fence 07/01/2020
R 186 Repair/Maintain Off Channel Water Development Sites 07/01/2020
S 186 Maintain Instream and Floodplain Structures 07/01/2020
T 157 Monitor past channel realignment and floodplain restoration work to refine future habitat design 07/01/2020
U 157 Monitor Stream Water In The Trout Creek Basin 07/01/2020
V 157 Adult Steelhead Redd Counts 07/01/2020
W 157 Monitor Smolt Production & Adult Escapement 07/01/2020
X 159 Submit & Acquire PIT Tag Data To/From PTAGIS
Y 162 Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-Migrant Estimates
Z 185 Periodic Status Reports for BPA
AA 132 Produce Annual report for 1/1/2019 to 12/31/2019
AB 158 CCR-45221 PIT Tag Out-Migrant Summer Steelhead Smolts