Province | Subbasin | % |
---|---|---|
Columbia Plateau | John Day | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Effective implementation management and timely contract administration | A: 119. Manage Administer Projects | 01/31/2020 | 01/31/2020 | |
Completed Environmental Compliance Documentation | B: 165. Produce Environmental Compliance Documentation | 01/31/2020 | 01/31/2020 | |
Complete Cultural Resource Surveys | C: 165. Contract Cultural Resource Inventories | 01/31/2020 | 01/31/2020 | |
Outreach and Education | D: 99. John Day Basin Office Education and Outreach | 01/31/2020 | 01/31/2020 | |
John Day Basin Partnership Participation | E: 191. John Day Basin Partnership | 01/31/2020 | 01/31/2020 | |
5 Project Concepts Developed | F: 114. Program Support | 01/31/2020 | 01/31/2020 | |
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces | G: 114. Structured Implementation and Monitoring | 01/31/2020 | 01/31/2020 | |
Approved Designs Implemented | H: 29. Fox Creek Reach 18 Habitat Restoration - Instream Habitat | 12/31/2019 | 12/31/2019 | |
Bridge Delivered and installed | I: 85. Fox Creek Reach 18 Habitat Restoration - Remove Passage Barrier | 12/31/2019 | 12/31/2019 | |
Completed channel construction | J: 30. Fox Creek Reach 18 Habitat Restoration - Side channel Creation | 12/31/2019 | 12/31/2019 | |
Install Riparian Fence | K: 40. Fox Creek Reach 18 Habitat Restoration - Install Riparian Fence | 12/31/2019 | 12/31/2019 | |
Remove Juniper Trees | L: 199. Fox Creek Reach 18 Habitat Restoration - Juniper Removal | 05/30/2019 | 06/30/2019 | |
Complete planting at Reach 18 on Fox Creek | M: 47. Fox Creek Reach 18 Habitat Restoration - Riparian Planting | 01/31/2020 | 12/31/2019 | |
Complete Fox Creek Reach 18 Habitat Design for Irrigation System | N: 175. Fox Creek Reach 18 Habitat Restoration - Irrigation System Design | 01/31/2020 | ||
Fox Creek Upper Reach 10 Design | Q: 175. Fox Creek Upper Reach 10 Passage and Habitat Design | 01/31/2020 | ||
Complete Project Monitoring and Maintenance | V: 186. Fox Creek Mid Reach 10 - Monitoring and Adaptive Management | 01/31/2020 | 01/31/2020 | |
Complete off channel water | W: 34. Fox Creek Mid Reach 10 - Develop Water Source | 09/30/2019 | 09/30/2019 | |
Produce Design and Specifications | Y: 175. Upper John Day Habitat Phase 1 | 01/31/2020 | 01/31/2020 | |
Produce Design | Z: 175. Reynolds Creek Irrigation Project - Design | 01/31/2020 | ||
Produce 30% Design for Austin Ranch Habitat | AC: 175. Austin Ranch Habitat Design | 01/31/2020 | ||
Complete Camp Creek Restoration Project | AE: 29. Camp Creek Habitat Restoration - Increase Complexity | 01/31/2020 | 12/31/2019 | |
Reconnect Side Channels | AG: 30. Camp Creek Habitat Restoration - Reconnect Side Channels | 11/30/2019 | 11/30/2019 | |
Complete Camp Creek Habitat Restoration Planting | AH: 47. Camp Creek Habitat Restoration - Plant Vegetation | 01/31/2020 | 01/31/2020 | |
Complete 60% design for Thirtymile | AI: 175. Thirtymile Restoration Design | 01/31/2020 | 01/31/2020 | |
Complete Bear Creek Juniper Treatment | AJ: 199. Bear Creek Juniper Treatment | 01/31/2020 | 01/31/2020 | |
Propagate Riparian Plants for the Middle Fork John Day River | AL: 47. Middle Fork John Day Plant Propagation | 01/31/2020 | 01/31/2020 | |
Complete vegetation maintenance | AM: 198. Riparian Plant Maintenance | 01/31/2020 | 01/31/2020 | |
Habitat and Passage Structures Monitored | AN: 186. Implementation Effectiveness Monitoring | 01/31/2020 | 01/31/2020 | |
Produce accessible, error-checked datasets | AO: 157. John Day Basin USGS Gauging Station Operations and Maintenance | 01/31/2020 | 01/31/2020 | |
Collect Temperature Data | AP: 157. John Day Temperature Monitoring | 01/31/2020 | 01/31/2020 | |
Produce accessible, error-checked datasets | AQ: 157. Fox Creek Reach 10 Effectiveness Monitoring | 01/31/2020 | 01/31/2020 | |
Produce accessible, error-checked datasets | AR: 157. Fox Creek Reach 18 Effectiveness Monitoring | 01/31/2020 | 01/31/2020 | |
Produce accessible, error-checked datasets | AS: 157. Upper John Day Habitat Enhancement Effectiveness Monitoring | 01/31/2020 | 01/31/2020 | |
Tag up to 900 steelhead | AT: 158. Mark-Recapture Studies - Fox Creek Steelhead | 01/31/2020 | 01/31/2020 | |
Tag up to 1,700 juvenile Chinook | AU: 158. Mark-Recapture Studies - Upper John Day Habitat Enhancement Chinook | 09/30/2019 | 09/30/2019 | |
Produce Annual Data Summaries and Reports | AV: 162. Analysis and Interpretation of Field Data Collected From Fisheries and Non-Fisheries Surveys | 01/31/2020 | 01/31/2020 | |
Completed Annual Report | AW: 132. Submit Progress Report for the period (February 2018) to (January 2019) | 11/30/2019 | 11/30/2019 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Manage Administer Projects | 02/01/2019 | ||||||
B | 165 | Produce Environmental Compliance Documentation | 02/01/2019 | ||||||
C | 165 | Contract Cultural Resource Inventories | 02/01/2019 | ||||||
D | 99 | John Day Basin Office Education and Outreach | 02/01/2019 | ||||||
E | 191 | John Day Basin Partnership | 02/01/2019 | ||||||
F | 114 | Program Support | 02/01/2019 | ||||||
G | 114 | Structured Implementation and Monitoring | 02/01/2019 | ||||||
H | 29 | Fox Creek Reach 18 Habitat Restoration - Instream Habitat | 03/29/2019 | ||||||
I | 85 | Fox Creek Reach 18 Habitat Restoration - Remove Passage Barrier | 03/29/2019 | ||||||
J | 30 | Fox Creek Reach 18 Habitat Restoration - Side channel Creation | 03/29/2019 | ||||||
K | 40 | Fox Creek Reach 18 Habitat Restoration - Install Riparian Fence | 03/29/2019 | ||||||
L | 199 | Fox Creek Reach 18 Habitat Restoration - Juniper Removal | 03/29/2019 | ||||||
M | 47 | Fox Creek Reach 18 Habitat Restoration - Riparian Planting | 03/29/2019 | ||||||
N | 175 | Fox Creek Reach 18 Habitat Restoration - Irrigation System Design | 05/30/2019 | ||||||
O | 84 | Fox Creek Reach 18 Habitat Restoration - Pump Station | |||||||
P | 203 | Fox Creek Reach 18 Habitat Restoration - Install Pipeline | |||||||
Q | 175 | Fox Creek Upper Reach 10 Passage and Habitat Design | |||||||
R | 29 | Fox Creek Upper Reach 10 - Instream Habitat | |||||||
S | 84 | Fox Creek Upper Reach 10 - Remove Fish Passage Barrier | |||||||
T | 30 | Fox Creek Upper Reach 10 - Realign Channel | |||||||
U | 47 | Fox Creek Upper Reach 10 - Plant Vegetation | |||||||
V | 186 | Fox Creek Mid Reach 10 - Monitoring and Adaptive Management | 02/01/2019 | ||||||
W | 34 | Fox Creek Mid Reach 10 - Develop Water Source | 02/01/2019 | ||||||
X | 175 | Fox Creek Reach 9 and Lower Reach 10 Habitat Project Design | |||||||
Y | 175 | Upper John Day Habitat Phase 1 | 02/01/2019 | ||||||
Z | 175 | Reynolds Creek Irrigation Project - Design | |||||||
AA | 84 | Reynolds Creek Irrigation Project - Replace Diversion | |||||||
AB | 203 | Reynolds Creek Irrigation Project - Pipe Ditch | |||||||
AC | 175 | Austin Ranch Habitat Design | 02/01/2019 | ||||||
AD | 175 | Phipps Meadow Restoration Design | |||||||
AE | 29 | Camp Creek Habitat Restoration - Increase Complexity | 07/11/2019 | ||||||
AF | 180 | Camp Creek Habitat Restoration - Connect Floodplain | |||||||
AG | 30 | Camp Creek Habitat Restoration - Reconnect Side Channels | 07/11/2019 | ||||||
AH | 47 | Camp Creek Habitat Restoration - Plant Vegetation | 07/11/2019 | ||||||
AI | 175 | Thirtymile Restoration Design | 02/01/2019 | ||||||
AJ | 199 | Bear Creek Juniper Treatment | 06/20/2019 | ||||||
AK | 180 | Dunstan Preserve Floodplain Enhancement Phase 2 | |||||||
AL | 47 | Middle Fork John Day Plant Propagation | 02/01/2019 | ||||||
AM | 198 | Riparian Plant Maintenance | 02/01/2019 | ||||||
AN | 186 | Implementation Effectiveness Monitoring | 02/01/2019 | ||||||
AO | 157 | John Day Basin USGS Gauging Station Operations and Maintenance | 02/01/2019 | ||||||
AP | 157 | John Day Temperature Monitoring | 02/01/2019 | ||||||
AQ | 157 | Fox Creek Reach 10 Effectiveness Monitoring | 02/01/2019 | ||||||
AR | 157 | Fox Creek Reach 18 Effectiveness Monitoring | 02/01/2019 | ||||||
AS | 157 | Upper John Day Habitat Enhancement Effectiveness Monitoring | 02/01/2019 | ||||||
AT | 158 | Mark-Recapture Studies - Fox Creek Steelhead | 02/01/2019 | ||||||
AU | 158 | Mark-Recapture Studies - Upper John Day Habitat Enhancement Chinook | 02/01/2019 | ||||||
AV | 162 | Analysis and Interpretation of Field Data Collected From Fisheries and Non-Fisheries Surveys | 02/01/2019 | ||||||
AW | 132 | Submit Progress Report for the period (February 2018) to (January 2019) | 02/01/2019 | ||||||
AX | 185 | Periodic Status Reports for BPA | 02/01/2019 |