Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 85980: 2010-001-00 EXP LOWER CLEAR CREEK RESTORATION DESIGN
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
85980
Contract Title:
2010-001-00 EXP LOWER CLEAR CREEK RESTORATION DESIGN
Contract Continuation:
Previous: Next:
n/a
  • 88638: 2010-001-00 EXP LOWER CLEAR CREEK 30% DESIGN
Contract Status:
Issued
Contract Description:
Under this contract Chelan County Natural Resource Department (CCNRD) will develop a 15% design for Clear Creek, as proposed in the 2020 Targeted Solicitation Final Proposal.  The project will occur on Clear Creek from Chiwawa Loop Road crossing downstream to Clear Creek confluence with Chiwawa, including historic Clear Creek channel, current Clear Creek bypass channel Thousand Trails ponds, and Wenatchee-Chiwawa Irrigation District infrastructure.

Clear Creek is an important spawning and rearing stream for steelhead. The Chiwawa River is an MaSA for spring Chinook and steelhead and spawning and rearing habitat for spring Chinook salmon, steelhead and bull trout. This project aims to improve stream complexity and fish access and use of 1.0 mile of the lowermost reaches of Clear Creek and to reduce the potential mortality associated with the current flow management methods. The Upper Columbia RTT Biological Strategy identifies Clear Creek as an important tributary to the Chiwawa River, and multiple project sponsors have worked in this stream to improve conditions for fish.In a collaborative effort with the Wenatchee-Chiwawa Irrigation District, CCNRD has identified practices and stream conditions that may inhibit this previous work and is therefore proposing to develop a restoration design to improve these conditions. CCNRD previously replaced three upstream fish barriers on USFS lands using SRFB funding, Chelan County Public Works replaced a culvert at the Chiwawa Loop Road, and Trout Unlimited recently replaced an upstream fish barrier at the Thousand Trails domestic water system diversion.

Potential restoration methods are two-fold. The irrigation district diversion on Clear Creek can likely be reduced or eliminated through irrigation district efficiency projects, such as piping and/or lining canals; transferring all or part of the Clear Creek diversion to the Chiwawa River diversion; and/or a water acquisition. Clear Creek channel restoration will include addressing the currently incised/ditched portion of the creek and ponds on Thousand Trails property and downstream options below the ponds. Floodplain reconnection, improved structure and riparian cover will be priorities for a restored Clear Creek channel. Fish use of the Thousand Trails ponds will be evaluated and addressed, possibly through screening to prevent fish movement through the ponds.

This project was approved for funding through Bonneville Power Administration (BPA)/Upper Columbia Salmon Recovery Board (UCSRB) FY2020 Targeted Solicitation Notice and was reviewed and ranked by the Regional Technical Team (RTT).  The RTT is a team of technical experts familiar with the priority areas and limiting factors, and identify projects that will best contribute to the recovery of salmonids and other species of concern in the Upper Columbia.

The Upper Columbia Salmon Recovery Board (UCSRB) is co-sponsor to this Upper Columbia Programmatic Habitat Project selected through the BPA Targeted Solicitation in 2020.  As such, UCSRB is a key partner to BPA and within the UC region, and a local first point of contact for general Programmatic inquiries and coordination.  UCSRB may seek general project information and updates from CCNRD to pre-form and fulfill their necessary role and obligations under the Northwest Power and Conservation Council approved Programmatic with BPA.  CCNRD will coordinate with UCSRB and accommodate any such requests.  

CCNRD's Contract Manager and any design consultant (a mutually agreed to and selected subcontractor) will cooperate, coordinate, collaborate, and maintain effective communication with the BPA PM/COR, EC Lead, HIP Review Lead, and Hydraulic Engineer(s) during the entire length of this contract with regards to project design.  CCNRD will address BPA comments and concerns, and the entities will arrive at a mutually beneficial consensus.  
Account Type(s):
Expense
Contract Start Date:
09/15/2020
Contract End Date:
09/14/2021
Current Contract Value:
$50,776
Expenditures:
$38,066

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Victoria Bohlen Bonneville Power Administration Yes COR vlbohlen@bpa.gov (503) 230-3506
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Jamie Cleveland Bonneville Power Administration Yes Administrative Contact jacleveland@bpa.gov (503) 230-3160
Joseph Connor Bonneville Power Administration Yes F&W Approver jwconnor@bpa.gov (503) 230-3172
Lisa Dowling Chelan County Yes Contract Manager Lisa.Dowling@co.chelan.wa.us (509) 679-8532
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Mike Kaputa Chelan County No Supervisor mike.kaputa@co.chelan.wa.us (509) 667-6584
Sarah Walker Upper Columbia Salmon Recovery Board No Interested Party sarah.walker@ucsrb.org (509) 630-8226


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Provide all necessary information to EC lead A: 165. Obtain Required Permits, Authorizations, and Documentation for the Lower Clear Creek Restoration Design Project 09/14/2021 09/14/2021
Effective task management and timely contract administration D: 119. Manage BPA Contracting Requirements 09/14/2021 09/14/2021
Lower Clear Creek Data Collection & Report E: 115. Existing Conditions Assessment 06/30/2021 06/30/2021
Conceptual (15%) Design F: 175. Develop 15% Concept Plans 09/14/2021 09/14/2021
Stakeholder Coordination Summary Memorandum G: 191. CCNRD will coordinate with stakeholders and BPA 09/14/2021 09/14/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Required Permits, Authorizations, and Documentation for the Lower Clear Creek Restoration Design Project
B 185 Periodic Status Reports for BPA
C 132 No Report Required Per COR
D 119 Manage BPA Contracting Requirements
E 115 Existing Conditions Assessment
F 175 Develop 15% Concept Plans
G 191 CCNRD will coordinate with stakeholders and BPA