Province | Subbasin | % |
---|---|---|
Columbia Gorge | Hood | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Dec-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Project administration requirements completed | B: 119. Manage BPA Project | 12/31/2022 | 12/30/2022 | |
All work complies with environmental regulations | C: 165. Work with BPA on Environmental Compliance requirements. | 12/31/2022 | 12/30/2022 | |
Hood River SWCD support and coordination. | D: 191. Coordinate activities with the Hood River Soil and Water Conservation District / Hood River Watershed Group and partners. | 12/31/2022 | 12/30/2022 | |
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces | E: 114. Identify and develop instream fish habitat improvement projects in the Hood River Watershed. | 12/31/2022 | 12/30/2022 | |
Produce accessible, error-checked datasets | F: 157. Measure Summer Base Flow in the EFID By-Pass Reach | 12/31/2022 | 12/30/2022 | |
Develop or update (out-year) prioritized list water conservation project list: upload to Pisces | G: 114. Identify Water Conservation Projects | 12/31/2022 | 12/30/2022 | |
Deliverable | H: 186. Inspect large wood placement projects | 12/31/2022 | 09/30/2022 | |
Final design completed for Tony Creek Diversion | I: 175. Tony Creek Diversion Upgrade | 12/31/2022 | ||
Design Completed | K: 175. Neal Creek Phase 2: Habitat Project Design (carried forward from prior contract) | 06/15/2022 | 06/30/2022 | |
Improved fish habitat in 0.6 miles of Neal Creek. | L: 29. Neal Creek Phase 2: Habitat Improvement Implementation | 09/30/2022 | 09/29/2022 | |
Completed channel construction | M: 30. Neal Creek Phase 2: Side Channel Connection | 08/31/2022 | 08/31/2022 | |
Thompson Road bridge determined to pass juveniles or jump height barrier resolved through implementation | N: 85. Neal Creek Phase 2: Address potential juvenile fish passage barrier | 10/31/2022 | 03/31/2022 | |
Plant trees and grass seed | O: 47. Neal Creek Phase 2: Plant Vegetation | 12/31/2022 | ||
Processing & Deliverables | Q: 115. LiDAR Evaluation & Preliminary Habitat Improvement Design Assessment | 12/31/2022 | 12/30/2022 | |
Completed pipeline design and cultural resource surveys | R: 175. East Fork Irrigation District Oanna/Yasui Pipeline Design and Cultural Survey | 12/31/2022 | 12/30/2022 | |
FY 2021 Annual Progress Report complete | S: 132. Prepare and submit annual progress report for FY 21 work | 10/31/2022 | 12/30/2022 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (Oncorhynchus tshawytscha) - All Populations |
|
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 119 | Manage BPA Project | |||||||
C | 165 | Work with BPA on Environmental Compliance requirements. | |||||||
D | 191 | Coordinate activities with the Hood River Soil and Water Conservation District / Hood River Watershed Group and partners. | |||||||
E | 114 | Identify and develop instream fish habitat improvement projects in the Hood River Watershed. | |||||||
F | 157 | Measure Summer Base Flow in the EFID By-Pass Reach | 06/01/2022 | ||||||
G | 114 | Identify Water Conservation Projects | |||||||
H | 186 | Inspect large wood placement projects | 03/31/2022 | ||||||
I | 175 | Tony Creek Diversion Upgrade | |||||||
J | 34 | Baldwin Creek Water Quality Improvement Project (carried forward from prior contracts) | |||||||
K | 175 | Neal Creek Phase 2: Habitat Project Design (carried forward from prior contract) | 07/25/2022 | ||||||
L | 29 | Neal Creek Phase 2: Habitat Improvement Implementation | 07/25/2022 | ||||||
M | 30 | Neal Creek Phase 2: Side Channel Connection | 07/25/2022 | ||||||
N | 85 | Neal Creek Phase 2: Address potential juvenile fish passage barrier | 07/25/2022 | ||||||
O | 47 | Neal Creek Phase 2: Plant Vegetation | 07/25/2022 | ||||||
P | 175 | Neal Creek: Phase 3 Habitat Improvement Design | |||||||
Q | 115 | LiDAR Evaluation & Preliminary Habitat Improvement Design Assessment | 03/20/2022 | ||||||
R | 175 | East Fork Irrigation District Oanna/Yasui Pipeline Design and Cultural Survey | 11/02/2022 | ||||||
S | 132 | Prepare and submit annual progress report for FY 21 work |