Province | Subbasin | % |
---|---|---|
Columbia Gorge | Hood | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Dec-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Effective implementation management and timely contract administration | B: 119. Manage BPA Project | 03/31/2024 | 03/31/2024 | |
All work complies with environmental regulations | C: 165. Work with BPA on Environmental Compliance requirements. | 03/31/2024 | 03/31/2024 | |
Hood River WG & SWCD support and coordination | D: 191. Coordinate activities with the Hood River Soil and Water Conservation District / Hood River Watershed Group and partners. | 03/31/2024 | 03/31/2024 | |
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces | E: 114. Identify and develop instream fish habitat improvement projects in the Hood River Watershed. | 03/31/2024 | 03/31/2024 | |
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish | F: 114. Identify and develop water conservation and riparian projects in the Hood River Watershed. | 03/31/2024 | 03/31/2024 | |
Produce accessible, error-checked datasets | G: 157. Measure Summer Base Flow in the EFID By-Pass Reach | 03/31/2024 | 03/31/2024 | |
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces | H: 114. Identify Water Conservation Projects | 03/31/2024 | 03/31/2024 | |
Inspections of previous Habitat Projects complete | I: 186. Inspect large wood placement projects | 12/31/2023 | 12/31/2023 | |
Native plant community established at Neal Creek Phase 2 site. | J: 47. Neal Creek Phase 2: Plant Vegetation | 12/31/2023 | 08/31/2023 | |
Final design produced for Tony Creek | K: 175. Tony Creek Diversion Design - Remove Passage Barrier | 06/30/2023 | 06/30/2023 | |
Completed project as per design | L: 85. Tony Creek Diversion Implementation - Remove Passage Barrier | 09/30/2023 | 09/22/2023 | |
Road side berm removed or modified as per design | N: 180. Tony Creek Diversion Implementation - Remove or Modify Roadside Berm | 09/30/2023 | 09/22/2023 | |
Powerdale corridor feasibility & concept design complete | O: 175. Powerdale Corridor Feasibility & Concept Design | 03/31/2024 | ||
Final design for Neel Creek phase 3 | P: 175. Neal Creek: Phase 3 Habitat Improvement Design - carried forward from prior contract | 03/31/2024 | ||
East Fork Hood River design completed | Q: 175. East Fork Hood River Phase 2 design | 03/31/2024 | ||
Oanna-Yasui pipeline project complete | R: 203. East Fork Irrigation District Oanna/Yasui Implementation | 03/31/2024 | ||
SCADA installed | S: 203. East Fork Irrigation District Scada Implementation | 03/31/2024 | ||
Completed Annual Report | T: 132. Prepare and submit annual progress report for FY 22 work | 07/31/2023 | 05/12/2023 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (Oncorhynchus tshawytscha) - All Populations |
|
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 119 | Manage BPA Project | |||||||
C | 165 | Work with BPA on Environmental Compliance requirements. | |||||||
D | 191 | Coordinate activities with the Hood River Soil and Water Conservation District / Hood River Watershed Group and partners. | |||||||
E | 114 | Identify and develop instream fish habitat improvement projects in the Hood River Watershed. | |||||||
F | 114 | Identify and develop water conservation and riparian projects in the Hood River Watershed. | |||||||
G | 157 | Measure Summer Base Flow in the EFID By-Pass Reach | 01/01/2023 | ||||||
H | 114 | Identify Water Conservation Projects | |||||||
I | 186 | Inspect large wood placement projects | 03/31/2023 | ||||||
J | 47 | Neal Creek Phase 2: Plant Vegetation | 08/31/2023 | ||||||
K | 175 | Tony Creek Diversion Design - Remove Passage Barrier | 01/01/2023 | ||||||
L | 85 | Tony Creek Diversion Implementation - Remove Passage Barrier | 08/01/2023 | ||||||
M | 29 | Tony Creek Diversion Implementation - Large Wood Placement | 08/01/2023 | ||||||
N | 180 | Tony Creek Diversion Implementation - Remove or Modify Roadside Berm | 08/01/2023 | ||||||
O | 175 | Powerdale Corridor Feasibility & Concept Design | 01/01/2023 | ||||||
P | 175 | Neal Creek: Phase 3 Habitat Improvement Design - carried forward from prior contract | 01/01/2023 | ||||||
Q | 175 | East Fork Hood River Phase 2 design | 01/01/2023 | ||||||
R | 203 | East Fork Irrigation District Oanna/Yasui Implementation | 01/01/2023 | ||||||
S | 203 | East Fork Irrigation District Scada Implementation | 01/01/2023 | ||||||
T | 132 | Prepare and submit annual progress report for FY 22 work |