Contract 91590: 2010-001-00 EXP UPPER WENATCHEE FLOODPLAIN 60% TO FINAL DESIGN
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
91590
Contract Title:
2010-001-00 EXP UPPER WENATCHEE FLOODPLAIN 60% TO FINAL DESIGN
Contract Continuation:
Previous: Next:
89494: 2010-001-00 EXP UPPER WENATCHEE FLOODPLAIN 60% TO FINAL DESIGN
  • 93968: 2010-001-00 CAP UPPER WENATCHEE FLOODPLAIN IMPLEMENTATION
Contract Status:
Issued
Contract Description:
This contract is for Phase 4 of the Upper Wenatchee Floodplain Reconnection Project.

During Phase 4, the design package will be advanced to construction-ready, construction bid documents will be prepared and disseminated to prospective construction contractors, and a pre-bid meeting will be held. In addition, CCNRD will continue working with USFS staff to complete necessary regulatory consultations (including ESA, NEPA, tribal consultations, etc.), and work needed to secure necessary permits will be continued. It is expected that construction contract(s) will be executed and construction will occur during the subsequent phase.

Completed Work To Date via BPA Funding:

Phase 1 (contract #: 82854), which was vetted by the Regional Technical Team (RTT), completed pre-conceptual work and development of 15% conceptual designs.

Phase 2 (contract # 86732), included development of a 30% design package; coordination among project proponents and key stakeholders (Chelan County Natural Resources Department (CCNRD), BPA, the U.S. Forest Service (USFS), Washington Department of Fish & Wildlife (WDFW), the Upper Columbia Salmon Recovery Board (UCSRB), and others); an assessment of access feasibility; bedrock profiling using seismic refraction to aid in the determination of siting and structural stability requirements needed for design work; and preparation of a draft recreation safety plan.

Phase 3, (contract # 89494) included development of a permit-ready (60%) design package; wetland delineation field work and reporting; cultural resources survey and reporting; preparation of JARPA and HPA permit applications; coordination with Washington DNR to achieve Aquatic Use Authorization (AUA - including preparation of Public Safety Checklist for Large Woody Debris Projects, a required component of the DNR AUA process). In addition, USFS initiated ESA and NEPA consultations, and we met with USFWS, NOAA Fisheries and WDFW staff to discuss potential for in-water work window extension.

Project Background:

The Upper Wenatchee River is a major spawning area for spring Chinook and steelhead. The project area is also likely to provide spawning habitat for summer Chinook and rearing and migration habitat for bull trout. As a result, the RTT identified the Upper Wenatchee Assessment Unit as the #2 priority sub-watershed for restoration actions in the Wenatchee basin prior to initiation of the Phase 1 contract for this project. In its updated prioritization, RTT has ranked the Upper Wenatchee as Tier 1 priority for both spring Chinook and steelhead and as Tier 2 priority for bull trout. Accordingly, focal species for this project are steelhead and spring Chinook.

A variety of actions are expected to be completed between approximately river miles 37.0 and 37.9 as a result of this project. These include installation of engineered log jams (ELJ) and pilot channel excavation to direct mainstem flows onto river left floodplain, and construction of  ELJs and placement of boulder clusters in the main channel and installation of large wood along an existing river left side channel to add in-stream structure.

This contract will contain subcontracts.
Account Type(s):
Expense
Contract Start Date:
01/04/2023
Contract End Date:
01/03/2024
Current Contract Value:
$163,857
Expenditures:
$152,810

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Scott Bailey Chelan County Yes Contract Manager scott.bailey@co.chelan.wa.us (509) 679-2131
Tracy Bowerman Upper Columbia Salmon Recovery Board No Interested Party tracy.bowerman@ucsrb.org (541) 915-3910
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Mike Kane Chelan County Yes Technical Contact kanenaturalresources@gmail.com (509) 885-2126
Mike Kaputa Chelan County Yes Supervisor mike.kaputa@co.chelan.wa.us (509) 667-6584
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Erin McKay Chelan County Yes Administrative Contact erin.mckay@co.chelan.wa.us (509) 667-6640
Michelle O'Malley Bonneville Power Administration Yes COR mmomalley@bpa.gov (503) 230-5138
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Sarah Walker Upper Columbia Salmon Recovery Board No Interested Party sarah.walker@ucsrb.org (509) 630-8226
Amanda Ward Upper Columbia Salmon Recovery Board No amanda.ward@ucsrb.org (773) 308-4310


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
EC Deliverables A: 165. Environmental Compliance 01/03/2024 01/03/2024
Effective implementation management and timely contract administration B: 119. Project Management and Administration 01/03/2024 01/03/2024
Stakeholder Coordination Summary Memo C: 191. CCNRD will coordinate with USFS, UCSRB, WDFW, RTT, USACE, USFWS, NOAA and BPA 01/03/2024 01/02/2024
Deliverable: Construction-Ready Designs & Bid Documents D: 175. Collaborative Design Development - 60% to construction-ready designs 01/03/2024 12/08/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance
B 119 Project Management and Administration
C 191 CCNRD will coordinate with USFS, UCSRB, WDFW, RTT, USACE, USFWS, NOAA and BPA
D 175 Collaborative Design Development - 60% to construction-ready designs 08/30/2023
E 185 Periodic Status Reports for BPA
F 132 No Report Required Per COR