Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 96658: 1995-027-00 EXP LAKE ROOS STURGEON RECOVERY UPPER COL R SPOK TR
Project Number:
Title:
Lake Roosevelt Sturgeon Recovery
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Columbia Upper 100.00%
Contract Number:
96658
Contract Title:
1995-027-00 EXP LAKE ROOS STURGEON RECOVERY UPPER COL R SPOK TR
Contract Continuation:
Previous: Next:
94282: 1995-027-00 EXP LAKE ROOSEVELT STURGEON RECOVERY
Contract Status:
Issued
Contract Description:
FY21 White Sturgeon Recovery Project -- Spokane Tribe of Indians
Account Type(s):
Expense
Contract Start Date:
04/01/2025
Contract End Date:
03/31/2026
Current Contract Value:
$940,763
Expenditures:

* Expenditures data includes accruals and are based on data through 28-Feb-2025.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Daniel Affonso Bonneville Power Administration Yes Contracting Officer dxaffonso@bpa.gov (503) 230-5918
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Carlos Matthew Bonneville Power Administration Yes COR cjmatthew@bpa.gov (503) 230-3418
Andy Miller Spokane Tribe Yes Contract Manager amiller@spokanetribe.com (509) 244-7031
Brent Nichols Spokane Tribe Yes Supervisor bnichols@spokanetribe.com (509) 244-7031x200
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete Environmental Compliance A: 165. Complete BPA Environmental Compliance 03/31/2026
Release BY 2024 PIT Tagged and Scute Marked Juvenile Hatchery White Sturgeon B: 158. PIT Tag and Scute Mark Hatchery White Sturgeon 02/28/2026
Release Hatchery White Sturgeon (BY 24) C: 176. Rear & Release BY 2025 Hatchery Origin White Sturgeon into Lake Roosevelt/Upper Columbia River 03/31/2026
Distribute Data and Results amongst Project Participants and the UCWSRI D: 161. Provide Summary Data to Project Participants and the Upper Columbia White Sturgeon Initiative 03/31/2026
Produce accessible, error-checked datasets E: 157. Conduct Juvenile White Sturgeon Monitoring 03/31/2026
Juvenile Sampling Data Analysis F: 162. Analysis of Juvenile Monitoring Data 03/31/2026
Stock Assessment Data Analysis G: 162. Analysis of Lake Roosevelt White Sturgeon Recovery Project Adult Sturgeon Data 03/31/2026
Acoustic Telemetry Monitoring H: 157. Monitor and Maintain the Lake Roosevelt Acoustic Array 03/31/2026
Acoustic Telemetry Analysis I: 162. Analysis of Lake Roosevelt White Sturgeon Recovery Project Telemetry Data 03/31/2026
Produce accessible, error-checked datasets J: 157. Collect BY25 White Sturgeon Larvae for the Conservation Aquaculture Program 03/31/2026
Deliverable: An accessible, error-checked data set with metadata K: 162. Analysis of 2024 Larval Collection Data 03/31/2026
Produce accessible, error-checked datasets L: 157. Determine Ploidy Rates (8N, 10N, and 12N) of Wild Caught Larvae Produced for the Conservation Aquaculture Program 03/31/2026
Deliverable: An accessible, error-checked data set with metadata M: 162. Analysis of Blood Sample Data to Determine Ploidy Rates 03/31/2026
Produce accessible, error-checked datasets N: 157. Conduct Stock Assessment Survey in the Lower Reservoir (Gifford to Spokane River Mouth) 03/31/2026
Deliverable: An accessible, error-checked data set with metadata O: 162. Analysis of Stock Assessment Data 03/31/2026
Produce accessible, error-checked datasets P: 157. Conduct Diet Analysis on Walleye in the Transboundary Reach 03/31/2026
Deliverable: An accessible, error-checked data set with metadata Q: 162. Analysis of Stomach Contents 03/31/2026
Develop, Organize and Participate in Public Outreach Activities R: 99. Lake Roosevelt White Sturgeon Recovery Project Public Outreach 03/31/2026
Upload Plan to CBfish S: 174. Produce Annual Production Plan 03/31/2026
Effective implementation management and timely contract administration T: 119. Manage and Administer Lake Roosevelt White Sturgeon Recovery Project Contracts 03/31/2026
Completed Progress (Annual) Report U: 132. Submit Progress Report for the Period April 2023 to March 2024 06/28/2025
Completed Progress (Annual) Report V: 132. Submit 2024 (Annual) Progress Report for the Period (April 2024) to (March 2025) 03/31/2026

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 174 Produce Plan
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 7 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete BPA Environmental Compliance
B 158 PIT Tag and Scute Mark Hatchery White Sturgeon 01/21/2025
C 176 Rear & Release BY 2025 Hatchery Origin White Sturgeon into Lake Roosevelt/Upper Columbia River 01/21/2025
D 161 Provide Summary Data to Project Participants and the Upper Columbia White Sturgeon Initiative
E 157 Conduct Juvenile White Sturgeon Monitoring 01/21/2025
F 162 Analysis of Juvenile Monitoring Data
G 162 Analysis of Lake Roosevelt White Sturgeon Recovery Project Adult Sturgeon Data
H 157 Monitor and Maintain the Lake Roosevelt Acoustic Array 01/21/2025
I 162 Analysis of Lake Roosevelt White Sturgeon Recovery Project Telemetry Data
J 157 Collect BY25 White Sturgeon Larvae for the Conservation Aquaculture Program 01/21/2025
K 162 Analysis of 2024 Larval Collection Data
L 157 Determine Ploidy Rates (8N, 10N, and 12N) of Wild Caught Larvae Produced for the Conservation Aquaculture Program 01/21/2025
M 162 Analysis of Blood Sample Data to Determine Ploidy Rates
N 157 Conduct Stock Assessment Survey in the Lower Reservoir (Gifford to Spokane River Mouth) 01/21/2025
O 162 Analysis of Stock Assessment Data
P 157 Conduct Diet Analysis on Walleye in the Transboundary Reach 01/21/2025
Q 162 Analysis of Stomach Contents
R 99 Lake Roosevelt White Sturgeon Recovery Project Public Outreach
S 174 Produce Annual Production Plan 01/21/2025
T 119 Manage and Administer Lake Roosevelt White Sturgeon Recovery Project Contracts
U 132 Submit Progress Report for the Period April 2023 to March 2024
V 132 Submit 2024 (Annual) Progress Report for the Period (April 2024) to (March 2025)
W 185 Periodic Status Reports for BPA