Deliverable: An accessible, error-checked data set with metadata |
A: 162. Wakish Small Contract |
|
03/31/2026 |
|
Effective implementation management and timely contract administration |
B: 119. Manage Restoration Projects |
|
03/31/2026 |
|
Complete Environmental Compliance Documentation |
C: 165. Environmental Compliance |
|
03/31/2026 |
|
Out reach performed |
D: 99. Conduct Field Education - Restoration - Salmonid Life Histories |
|
03/31/2026 |
|
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish |
E: 114. Select habitat improvement actions and identify possible projects for next fiscal year |
|
03/31/2026 |
|
database updated |
F: 160. Update Project Database |
|
03/31/2026 |
|
Informal summaries created |
G: 161. Create informal summary reports and maps |
|
03/31/2026 |
|
Participation in Tribal water policy process |
H: 122. Input to various Tribal planning and policy efforts |
|
03/31/2026 |
|
Use data from screwtrap to produce accessible, error-checked datasets |
I: 157. Operate rotary screw traps for steelhead |
|
03/31/2026 |
|
Complete 3 pass surveys in Ahtanum and Satus Creeks |
J: 157. Conduct steelhead and bull trout spawner surveys |
|
03/31/2026 |
|
Water temperature record |
K: 157. Collect water temperature data |
|
03/31/2026 |
|
Discharge measurements |
L: 157. Collect discharge measurements |
|
03/31/2026 |
|
Redd distribution and adult abundance index |
M: 162. Analyze redd count data |
|
03/31/2026 |
|
Steelhead outmigration metrics |
N: 162. Analyze Steelhead Outmigrant Data |
|
03/31/2026 |
|
Diversions regulated and screens maintained |
O: 186. Assist with the operation of diversions and screens on Ahtanum Creek |
|
03/31/2026 |
|
Assisst with operations of diversions and screens on Toppenish Creek |
P: 186. Assist with operation of diversions and screens on Toppenish Creek |
|
03/31/2026 |
|
fences and maintained |
Q: 186. Maintain stock tanks/livestock fences/improved springs |
|
03/31/2026 |
|
Vegetation maintained |
R: 198. Maintain vegetation |
|
03/31/2026 |
|
Designs complete |
S: 175. 3-Way Phase II Levee Removal - Design Continuation |
|
08/01/2025 |
|
Completed Three Way Phase II habitat restoration project |
T: 180. 3way phase II Levee Removal |
|
03/31/2026 |
|
Floodplain Enhancement Complete |
U: 29. 3way phase II Levee Removal |
|
03/31/2026 |
|
Revegetation completed |
V: 47. 3way phase II Levee Removal |
|
03/31/2026 |
|
Completed channel construction |
W: 30. 3way phase II Levee Removal |
|
03/31/2026 |
|
Construction Management Complete |
X: 100. Pom Pom RM 40 Bridge and Channel Construction - Construction Management |
|
03/31/2026 |
|
Completed phase 1 of channel construction |
Y: 30. Pom Pom RM 40 Bridge Construction and Channel Alignment |
|
03/31/2026 |
|
Bridge Installation Complete |
Z: 85. Pom Pom RM 40 Bridge Construction and Channel Alignment |
|
03/31/2026 |
|
Phase one of revegetation completed |
AA: 47. Pom Pom Revegetation |
|
03/31/2026 |
|
Upload Plan to CBfish |
AB: 174. On Call Services - Engineering Support |
|
03/31/2026 |
|
Upload Plan to CBfish |
AC: 174. Satus Reach Assessment |
|
01/31/2026 |
|
Designs completed |
AD: 175. Toppenish Wood Loading RM 45 - 51- Produce Designs |
|
03/31/2026 |
|
Complete final billing and YN internal closeouts. |
AE: 208. Lawrence Ditch Fish Screening |
|
03/31/2026 |
|
Completed Design Set for Satus RM 23 LWD |
AF: 175. Satus RM 23 LWD |
|
03/31/2026 |
|
Completed Progress (Annual) Report |
AH: 132. Produce Project Annual Report for FY23 Mar23-Feb24 |
|
03/16/2026 |
|