View and print project details including project summary, purpose, associations to Biological Opinions, and area. To learn more about any of the project properties, hold your mouse cursor over the field label.
Province | Subbasin | % |
---|---|---|
Columbia Gorge | Klickitat | 100.00% |
Description: Page: 6 Figure 1: Klickitat River, WA project location map. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 870 x 1276 Description: Page: 7 Figure 2: Klickitat River Subbasin, WA overview map. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 586 x 680 Description: Page: 18 Figure 5: Fishway Sluice Gate, Castile Falls Fishway #10/11 Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 479 x 640 Description: Page: 19 Figure 6: Concrete Pour, Castile Falls Fishway #10/11 Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 640 x 480 Description: Page: Photo 1: View upstream at pool above Falls 5 and rapids. June 4th, 2003. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 863 x 650 Description: Page: Photo 2: View upstream at site of proposed flume entrance / fishway exit on right bank. June 4th. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 863 x 650 Description: Page: Photo 3: View downstream of existing fish ladder. Note 30” diameter siphon on top of structure. Fish ladder exit and entrance flume is to the right. Gravel bar in foreground is restricting flow into ladder during low flows. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 1024 x 768 Description: Page: Photo 4: View looking downstream, from site of proposed flume entrance / fishway exit, of upstream pool with existing fish ladder in background. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 1024 x 768 Description: Page: Photo 5: View across Klickitat River, from upstream end of ladder, of rapids above Falls 5. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 1024 x 768 Description: Page: Photo 6: View upstream of Klickitat River left bank from upstream end of ladder. The upstream pool is just above the rapids. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 1024 x 768 Description: Page: Photo 7: Upstream end of existing fish ladder and siphon. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 1024 x 768 Description: Page: Photo 8: Flume and intake structure. Note the stop log sluice gate at mid structure. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 1024 x 768 Description: Page: Photo 9: View of trash rack and siphon intake from the entrance flume. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 1024 x 768 Description: Page: Photo 10: Looking downstream with fish ladder structure in the background. Gravel bar to left is also showing in Photo 3. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 1024 x 768 Description: Page: Photo 11: Existing fish ladder entrance structure with three-foot vertical slots with stoplog guides front and back. The right vertical slot had stoplogs in back, and the left slot stoplogs can be seen in the front. The middle vertical slot was without stops. The siphon on the top of the structure terminates foreground and left. Also see photos 14, 15, and 16. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 768 x 1024 Description: Page: Photo 12: View of rapids above Falls 5 from the fish ladder. The left bank is also shown in Photo 6. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 1024 x 768 Description: Page: Photo 13: Fish ladder exit as viewed from the upstream end of existing fish ladder. Flume entrance weir has water 0.8 feet deep flowing over. Also see Photos 3, 4, 8, and 9. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 768 x 1024 Description: Page: Photo 14: Catching fish from wood platforms. White water from Falls 5 is in background and green water at fish ladder entrance is in the foreground. Project(s): 1995-068-00 Document: 00006166-1 Dimensions: 1024 x 768 |
To view all expenditures for all fiscal years, click "Project Exp. by FY"
To see more detailed project budget information, please visit the "Project Budget" page
Number | Contractor Name | Title | Status | Total Contracted Amount | Dates |
---|---|---|---|---|---|
6166 SOW | Yakama Confederated Tribes | 1995-068-00 PRELIMINARY DESIGN FOR PASSAGE & HABITAT IMPROVEMENT | History | $241,046 | 4/1/2001 - 3/31/2003 |
Annual Progress Reports | |
---|---|
Expected (since FY2004): | 0 |
Completed: | 0 |
On time: | 0 |
Status Reports | |
---|---|
Completed: | 0 |
On time: | 0 |
Avg Days Late: | None |
Name | Role | Organization |
---|---|---|
David Byrnes (Inactive) | Project Manager | Bonneville Power Administration |