Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program

Notes

Viewing 11 of 11 Notes
Owner
Date
Note
Class
Type
Updated By
Update Date
Summer Goodwin03/28/2025 12:00 AMWithin-year increase for 2003-011-00, 93190 to evaluate preliminary <br/>design feasibility of greater connection of Mirror Lake to the <br/>mainstem Columbia River. Construction of I-84 severed the <br/>Columbia River's upstream connection. Partners to evaluate the <br/>feasibility of re-establishing this connection, including the need to <br/>modify the existing I-84 culvert at the downstream end of the site. If <br/>implemented, the project would reduce the distance juvenile <br/>salmonids must travel to enter the site.Ad HocUser
Christine Read10/25/2011 10:45 AMThe BPA Project Manager changed from 'Tracey Yerxa' to 'Anne Creason'LogSystem
Nilay Thakkar (Inactive)04/26/2010 9:18 PMCreated a 'FCRPS 2008' Biological Opinion association between this project and RPA 36LogSystem
Nilay Thakkar (Inactive)04/26/2010 9:18 PMCreated a 'FCRPS 2008' Biological Opinion association between this project and RPA 60.2LogSystem
Nilay Thakkar (Inactive)04/26/2010 9:18 PMCreated a 'FCRPS 2008' Biological Opinion association between this project and RPA 38.2LogSystem
Nilay Thakkar (Inactive)04/26/2010 9:18 PMRemoved the 'FCRPS 2008' Biological Opinion association between this project and RPA 36LogSystem
Nilay Thakkar (Inactive)04/26/2010 9:18 PMRemoved the 'FCRPS 2008' Biological Opinion association between this project and RPA 72.1LogSystem
Nilay Thakkar (Inactive)04/26/2010 9:18 PMRemoved the 'FCRPS 2008' Biological Opinion association between this project and RPA 60.2LogSystem
Nilay Thakkar (Inactive)04/26/2010 9:18 PMRemoved the 'FCRPS 2008' Biological Opinion association between this project and RPA 60.1LogSystem
Nilay Thakkar (Inactive)04/26/2010 9:18 PMRemoved the 'FCRPS 2008' Biological Opinion association between this project and RPA 38.2LogSystem
Nilay Thakkar (Inactive)04/26/2010 9:18 PMRemoved the 'FCRPS 2008' Biological Opinion association between this project and RPA 38.1LogSystem