This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $0 | $0 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | 1-HIP | HIP Risk Determination (F&W HABITAT ACTIONS ONLY) : Contact BPA EC Lead for risk determination | 1/1/2019 | 5/1/2019 | Concluded | Anne Creason | 8/17/2018 1:52:57 PM |
Description: FOR HABITAT ACTIONS ONLY: The EC Lead will determine if work under this work element may be able to have full ESA-coverage (NMFS & USFWS) under the Habitat Improvement Program Biological Opinion (HIP). The HIP has expanded coverage for projects that may pose a moderate to high risk of impacting an ESA-listed species or critical habitat that would normally require a Biological Assessment. For work that qualifies, projects will undergo a review by the EC Lead and Engineering Technical Services (ETS) team. Before conceptual design commences, contact the EC lead for HIP consideration, instruction, and information needs and requirements for coverage eligibility. The HIP activity categories and risk criteria are located in the current HIP Handbook located here: https://www.bpa.gov/efw/Analysis/NEPADocuments/Pages/ESA-Process.aspx | |||||||
B | DELIV | Confirm BPA EC Lead has necessary permits | 5/1/2019 | Concluded | Anne Creason | 8/17/2018 1:54:24 PM | |
Description: Confirm with BPA EC Lead that Brian Burke has provided all necessary ESA and MMPA coverage. Permits for this contract are covered by master contract (NOAA) under Plume Project. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1479. Are herbicides used as part of work performed under this contract? | No | No | |||
1722. Will water craft, heavy equipment, waders, boots, or other equipment be used from outside the local watershed as part of work performed under this contract? | No | No |