This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $2,500 | $2,500 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 2/1/2020 | 1/29/2021 | Concluded | Jamie Cleveland (Inactive) | 10/9/2019 11:22:31 AM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff. | |||||||
B | Suggested | Provide projected construction start date to BPA COR and EC | 2/1/2020 | 7/15/2020 | Concluded | Jamie Cleveland (Inactive) | 11/18/2019 9:55:09 AM |
Description: Provide month and year of projected construction start date to assist in project planning, environmental compliance, planning and design review timelines. Expected construction start date, pending permit approvals and clearances: Aug-Oct 2020. | |||||||
C | Design3 | Develop and submit project concepts (typically 15% design) for review | 2/1/2020 | 6/15/2020 | Concluded | Jamie Cleveland (Inactive) | 1/6/2020 9:10:41 AM |
Description: Develop conceptual strategy, restoration approach, and/or preliminary design. Submit conceptual design and expected construction start date to the COR and EC Lead for review. When submitting conceptual designs please include a statement of the site getting treatment, what the project goals address, the limiting factors and what is the habitat benefit. Reviews shall include COR, EC, and ETS. EC Lead to determine other reviews as needed. Allow one month for review. At 15%, coordinate with BPA to schedule a site visit to review project concepts, goals, and objectives if deemed necessary. Additional data that may be presented and reviewed (e.g., high resolution aerial photography, topographic maps, soil maps, or GIS/CAD data layers). | |||||||
D | Design8 | Cultural resource clearance obtained | 2/1/2020 | 7/15/2020 | Concluded | Jamie Cleveland (Inactive) | 11/18/2019 9:55:09 AM |
Description: If planning or design work requires ground disturbance including but not limited to geotechnical surveys, ground water monitoring, or well exploration, obtain appropriate cultural resources consultation prior to any ground disturbance. Notify EC Lead well in advance of ground disturbing work. On-the-ground work associated with this work element may not proceed until this milestone is complete. Milestone is complete when BPA environmental compliance staff provides final documentation. | |||||||
E | Design4 | Develop and submit preferred alternative (typically 30%) for review | 3/1/2020 | 7/31/2020 | Concluded | Jamie Cleveland (Inactive) | 1/2/2020 11:39:10 AM |
Description: Develop preferred alternative design and cost estimate. For 30% designs, planned view image, typically drawing on how they will be constructed, (specs) how far in the bed will poles go, what material will you be using to construct BDA. Submit plans, draft Basis of Design Report (BDR), and other supporting documentation (profiles, details, cross sections, quantities, technical analyses/appendixes, etc.) to the COR and EC Lead. Schedule time for review (typically one month for BPA review). The 30% design should incorporate technical comments and recommendations from previous review and shall address design requirements provided by BPA in the BDR template. | |||||||
F | Design11 | Upload final design set and obtain BPA engineer approval of design. | 6/1/2020 | 8/21/2020 | Concluded | Jamie Cleveland (Inactive) | 12/12/2019 4:34:16 PM |
Description: Upload final approved design plan set and basis of design to the contract documents and notify COR and EC Lead when complete. | |||||||
G | DELIV | Design specifications, engineered drawings or construction site plan | 1/31/2021 | Concluded | Jamie Cleveland (Inactive) | 12/12/2019 4:34:16 PM | |
Description: Prepare a technical drawing, basic design, or site plan for installing constructed BDA and/or PALS stream channel project in Lost-Loony Creek. The purpose is to provide and refine a rudimentary design or site plan to a level adequate to coordinate permitting, inform environmental compliance, obtain environmental clearances and permits, and organize material staging and construction access for implementation of the project as early as the late Summer/early Fall of 2020. |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
97518 | 48.463702 | -119.036179 | Washington | Okanogan | Intermountain | Sanpoil |