Title:
H: 156 - Improve flexibility and end-user support for the Dam Branch Occupancy Model (DABOM).
Description:
DABOM was developed as a proof-of-concept model to generate age and sex structured escapement above Lower Granite Dam and Priest Rapids Dam using PIT tag interrogation data. In recent years the use of DABOM has become commonplace, and requests to extend DABOM and support end-users (i.e., co-managers) has become commonplace. This work element will support recoding of DABOM to enable end-users to more easily add/remove interrogation sites, new watersheds, and new tag groups (e.g., hatchery-origin adults). When approriate work on the PITCleanR and STADEM tools where interoperable should be conducted .
WE Agreement Type:
Contracted
Deliverable Specification:
This Work Element will be considered complete when a new protocol and method have been created in monitoringresources.org. Outcomes will be summarized for the contract annual report (Work Element I).
WSE Effective Budget:
$139,899
% of Total WSE Effective Budget:
51.89%
WSE Start:
06/01/2020
WSE End:
05/28/2021
WSE Completion:
WSE Progress:
Other
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $139,899 $139,899
$139,899 $139,899

4 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 6/1/2020 6/30/2020 Canceled Jody Lando 5/12/2020 8:52:11 AM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
B Recode DABOM. 6/1/2020 3/31/2021 Active Jody Lando 5/15/2020 10:25:45 AM
Description: Specific modifications to DABOM include: • Development of a function to take generic node order from PITCleanR and automatically generate the appropriate DaBOM model in JAGS. • Incorporate ability to include hatchery and natural origin fish, as currently implemented at Priest Rapids Dam. • Development of a standard naming convention for detection and transition probabilities based on PTAGIS site codes. • A generic function to appropriately name multinomial transition probabilities based on site codes. • A generic function to combine transition probabilities appropriately (currently hard-wired for 3 starting points with specific parameter names). • A generic function to generate initial values for JAGS. • Improve the ability to combine outputs of StaDEM (or other estimate of total escapement) with transition probabilities to estimate escapement. • Development of functions to summarize escapement to larger spatial scales (e.g. MPG, ESU / DPS): o Include MPG / ESU boundaries as shapefiles in package and utilize a function to group estimates appropriately to estimate escapement at these scales. o Generic function that utilizes polygons, with the ability to use MPG, ESU, or user-defined polygons. • Development of a function to support user-defined priors on detection probabilities for particular sites (e.g., when additional information supports improved efficiency estimation). • Develop a detailed user-manual.
C PUBPROTOCOL Review, revise, and publish Study Design and Methods in monitoringmethods.org 1/1/2021 5/28/2021 Active Jody Lando 5/12/2020 8:52:11 AM
Description: The Study Design (including temporal and spatial design) and Methods for this work element are stored at monitoringresources.org and need to be finalized (i.e., "Published" through monitoringresources.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously published Study Design/Methods to ensure that they are consistent with how work will be done in any subsequent contract.
D DELIV New method and protocol. 5/28/2021 Active Jody Lando 5/12/2020 8:52:11 AM
Description: This Work Element will be considered complete when a new protocol and method have been created in monitoringresources.org. Outcomes will be summarized for the contract annual report (Work Element I).

Implementation Metrics
None

This work element does not require Focal Species
Study Plan Name Study Plan Owner Protocol State Sample Design Name
Operation Monitor Salmon ISEMP Snake River Adult Salmon Steelhead Tributary Escapement Estimation Protocol v1.0 v1.0 Carol Volk Draft

ID Name Type Optional Customized Based On Status
303 Carcass tissue sampling - fin tissue for genetic analysis v1.0 Data Collection No N/A Finalized

Title Category Subcategory Subcategory focus 1 Subcategory focus 2
Abundance by Age of Adult Returning Salmonids at PIT Arrays Fish Abundance of Fish (ID: 46) Fish Life Stage: Adult - Returner Fish Origin: Both
Adult Salmonid PIT tag abundance detected at PIT Array Fish Abundance of Fish (ID: 46) Fish Life Stage: Adult - Returner Fish Origin: Both
Age of Adult Salmonids Detected at PIT Array Fish Age Structure: Fish (ID: 49) Fish Life Stage: Adult - Returner NA
Tributary Adult to Juvenile Tributary Productivity Fish Progeny-per-Parent Ratio (P:P) (Productivity) (ID: 86) Fish Life Stage: RANGE: Juvenile to Adult NA