This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $159,383 | $151,874 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 10/1/2006 | 10/2/2006 | Concluded | Tracy Hauser | 8/8/2006 3:56:09 PM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA). | |||||||
B | approximately 900 fish genotyped | 10/1/2006 | 12/31/2006 | Concluded | Michael Blouin | 8/7/2006 5:13:10 PM | |
Description: document genotyping of fish in quarterly report | |||||||
C | approximately 900 fish genotyped | 1/1/2007 | 3/31/2007 | Concluded | Michael Blouin | 8/7/2006 5:13:10 PM | |
Description: document genotyping of fish in quarterly report | |||||||
D | approximately 900 fish genotyped | 4/1/2007 | 6/30/2007 | Concluded | Michael Blouin | 8/7/2006 5:13:11 PM | |
Description: document genotyping of fish in quarterly report | |||||||
E | approximately 900 fish genotyped | 7/1/2007 | 9/30/2007 | Active | Michael Blouin | 8/7/2006 5:13:11 PM | |
Description: document genotyping of fish in final report | |||||||
F | DELIV | Successfully genotype approximately 3600 fish | 9/30/2007 | Active | Michael Blouin | 8/24/2006 5:50:58 PM | |
Description: Genotype 3600 new fish. Includes the most recent year's samples plus fish from the backlog of samples from the 1990's. In particular, we will concentrate on finishing the last of the Hold summer run fish from the early 1990’s. A fish has been successfully genotyped following initial PCR of 8 microsatellite loci, running of products on an ABI 3100 capillary electrophoresis system, initial scoring of electrophoretic output, re-running and scoring for any failed reactions or ambiguous peaks, input of data into the master database, and error checking of the database. More details on loci and methods are explained in Araki et al., (2006; Conservation Biology, in press; http://oregonstate.edu/~blouinm/pdf_files/Araki%20et%20al%20In%20press%20Cons%20Biol.pdf ). |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Multiple Strategies | ||||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Uncertainty Research |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
7400 | 45.602053 | -121.635814 | Oregon | Hood River | Columbia Gorge | Hood |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
BPA Fish and Wildlife Program Monitoring v1.0 | Russell Scranton | Draft | Genotyping - Oregon State University: Hood River v1.0 |