Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Select a work element:
Contract Number:
Contract Title:
2002-037-00 CHARACTERIZE DIST. & STATUS OF FRESHWATER MUSSELS
Contract Start Date:
9/30/2002
Contract End Date:
9/30/2005
Title:
B: 156 - Develop methods to age freshwater mussel shells (CTUIR)
Description:
B. The scope of this work is to develop techniques to accurately age freshwater mussel shells in the mid-Columbia Basin.
WE Agreement Type:
Contracted
Deliverable Specification:
Literature review and testing of freshwater mussel shell aging techniques.
WSE Effective Budget:
$10,000
% of Total WSE Effective Budget:
4.84%
WSE Start:
10/01/2004
WSE End:
03/01/2005
WSE Completion:
09/23/2005
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $10,000 $10,000

3 Milestones
Sort Type Title Start End Status Modified By Modified Date
A Conduct literature review 10/1/2004 2/1/2005 Concluded
Description: Conduct literature review to evaluate methods previously used to successfully age freshwater mussel shells.
B Test aging techniques 2/2/2005 3/1/2005 Concluded
Description: Test aging techniques discovered in the literature by developing methods in the laboratory.
C DELIV Deliverable complete Concluded
Description: Literature review and testing of freshwater mussel shell aging techniques.

Implementation Metrics
None

This work element does not require Focal Species
Study Plan Name Study Plan Owner Protocol State Sample Design Name
BPA Fish and Wildlife Program Monitoring v1.0 Russell Scranton Draft

N/A

N/A