This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $5,000 | $5,000 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | Analyze results of biodepostion experiment | 9/1/2005 | 9/15/2005 | Active | |||
Description: From the data collected from the "isolation experiment" differences in mean values between mussel, sediment and control will be statistically assessed using one-way analysis of variance. A posteriori comparisons between treatments will be made with Tukey's test. The statistical significance of differences in means of macroinvertebrate biomass and abundance between treatments will be evaluated using the Monte Carlo bootstrap resampling method (Manly 1997). | |||||||
B | DELIV | Deliverable complete | Active | Deborah Docherty (Inactive) | 11/8/2005 10:31:52 AM | ||
Description: Statistically analyze FBOM contribution from mussels into the benthic environment (AOV, Tukey's test, Monte Carlo bootstrap resampling method - Manly 1997). |