This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $54,251 | $54,996 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 3/1/2023 | 2/29/2024 | Concluded | Tracy Hauser | 10/25/2022 8:52:43 AM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff. | |||||||
B | Suggested | Provide projected construction start date to BPA COR and EC | 3/1/2023 | 2/28/2024 | Concluded | Tracy Hauser | 10/25/2022 8:50:44 AM |
Description: Provide month and year of projected construction start date to assist in project planning, environmental compliance, planning and design review timelines. Provide during conceptual design stage and no later than 15% design. Include in WE description if possible. | |||||||
C | Design8 | Cultural resource clearance obtained | 3/1/2023 | 2/28/2024 | Concluded | Tracy Hauser | 10/25/2022 8:50:44 AM |
Description: If planning or design work requires ground disturbance including but not limited to geotechnical surveys, ground water monitoring, or well exploration, obtain appropriate cultural resources consultation prior to any ground disturbance. Notify EC Lead well in advance of ground disturbing work. On-the-ground work associated with this work element may not proceed until this milestone is complete. Milestone is complete when BPA environmental compliance staff provides final documentation. | |||||||
D | Design10 | NEPA clearance obtained | 3/1/2023 | 2/28/2024 | Concluded | Tracy Hauser | 10/25/2022 8:50:44 AM |
Description: Project shall not proceed without NEPA sign-off from BPA EC Lead. | |||||||
E | Design11 | Upload final design set | 3/1/2023 | 2/28/2024 | Concluded | Tracy Hauser | 10/25/2022 8:50:44 AM |
Description: Upload final approved design plan set and basis of design to the contract documents and notify COR and EC lead when complete. | |||||||
F | Design12 | Provide construction schedule and in-water work window | 3/1/2023 | 2/28/2024 | Concluded | Tracy Hauser | 10/25/2022 8:50:44 AM |
Description: Provide schedule to BPA outlining construction schedule and in-water work windows. Should unforeseen circumstance arise, notify BPA immediately of resulting changes in schedule and cost. | |||||||
G | Design9 | HIP coverage obtained | 3/1/2023 | 2/28/2024 | Concluded | Tracy Hauser | 10/25/2022 8:50:44 AM |
Description: Complete HIP Project Notification Form and document ESA coverage in coordination with EC Lead. | |||||||
H | Provide Final Catherine Creek - Hall Ranch Highway 203 Relocation Design to the EC Lead, BPA Engineer and COTR | 3/1/2023 | 2/29/2024 | Active | Tracy Hauser | 10/25/2022 8:50:44 AM | |
Description: Design review by EC and BPA Engineer will occur and will include HIP RRT review. Milestone completion dependent upon CR consultation completion. This project review juncture is proposed as standard project quality assurance junctures for high risk projects and may be used for medium risk projects based on the scope and complexity of the project. The number of review junctures depends on the adequacy of information provided, incorporation of comments recommendations, and may be modified to align with identified project junctures. Review of 80% and Final Plans and BDR: ODFW will coordinate with the GRMW and BPA on review of drawings, specifications, a Basis of Design Report, and other supporting documentation (profiles, details, cross sections, quantities, technical analyses/appendixes, etc.) for the project will be submitted for review. The Final design will demonstrate incorporation of technical comments and recommendations from the previous review and shall address the design requirements outlined in the BDR template (BPA to provide). In addition to BPA technical and functional reviews. The GRMW will collate comments from reviewers and interagency partners, and submit to partner. | |||||||
I | DELIV | Project Design Oversight for GRFH projects | 2/28/2024 | Concluded | Tracy Hauser | 10/25/2022 8:50:44 AM | |
Description: Catherine Creek Hall Ranch Habitat Improvement and Highway 203 Relocation Designs (uploaded under a separate contract). Detailed engineered designs developed that address limiting factors for salmon and steelhead by increasing quantity, quality, and complexity of salmonid habitat on the Hall Ranch and reconnecting Catherine Creek with 26 acres of floodplain cutoff by construction of Highway 203 from erosion. Engineered designs will be implementation ready. Construction likely 2024-2025. Project design teams organized and designs meet project goals and objectives. Project designs reviewed by RRT. Frequent landowner communication and support for developed projects. |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
34354 | 45.132809 | -117.712015 | Oregon | Union | Blue Mountain | Grande Ronde |