Title | Link |
---|---|
NONE - No data repository or not electronically available | N/A |
This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 31784 (03/01/2007 - 05/31/2008) | $1,000 | $900 | mileage and lab costs for WQ data | |
Work Element Budget (Current Performance Period) | $1,000 | $900 | mileage and lab costs for WQ data |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 3/1/2007 | 3/31/2007 | Concluded | Sarah Branum (Inactive) | 12/20/2007 4:29:01 PM |
Description: Prior to implementation, consult with BPA to ensure actions are covered. | |||||||
B | Collect water samples | 3/1/2007 | 5/31/2008 | Concluded | Sarah Branum (Inactive) | 12/20/2007 4:32:25 PM | |
Description: Approximately every 24 days. | |||||||
C | DELIV | Data made available to WDOE, BPA, and other interested parties. | 5/31/2008 | Concluded | Sarah Branum (Inactive) | 12/20/2007 4:32:25 PM | |
Description: Collect water samples approximately every 24 days and run through district lab for analysis of total suspended solids (TSS). Temperature, pH, and dissolved oxygen data is collected at time of sample collection and included in spreadsheet maintained by Pomeroy CD. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributaries | Tributary Habitat | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Project Implementation/Compliance Monitoring | Project Implementation/Compliance Monitoring | |||
1478. Secondary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Project Implementation/Compliance Monitoring | Project Implementation/Compliance Monitoring |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
2659 | 46.355226 | -117.573966 | Washington | Garfield | Columbia Plateau | Tucannon |
Title | Link |
---|---|
NONE - No data repository or not electronically available | N/A |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
Water quality monitoring in the Hangman Creek Watershed to track changes in water quality over time v1.0 | Stephanie Hallock | Draft | Collect water quality data and analyze in local lab - Pomeroy Conservation District v1.0 |
Title | Category | Subcategory | Subcategory focus 1 | Subcategory focus 2 |
---|---|---|---|---|
Average daily water conducitivity in a stream reach | Water Quality | Conductivity (ID: 154) | NA | NA |
Average pH in a stream reach | Water Quality | pH (ID: 158) | NA | NA |
Average daily temperature in a stream reach | Water Quality | Water Temperature (ID: 162) | NA | NA |
Average daily turbidity in a stream reach | Water Quality | Turbidity (ID: 161) | NA | NA |
Water Quality Index of a stream reach | Water Quality | Water Quality Index (ID: 350) | NA | NA |