This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 31579 (03/01/2007 - 03/31/2008) | $69,328 | $69,328 | ammended to reflect the purchase of two snowmobiles and a trailer. Icrease of $800. | |
2. Amendment 001 (03/01/2007 - 01/31/2008) | $69,328 | $69,328 | ammended to reflect the purchase of two snowmobiles and a trailer. Icrease of $800. | |
Work Element Budget (Current Performance Period) | $73,328 | $69,328 | ammended to reflect the purchase of two snowmobiles and a trailer. Icrease of $800. |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | Environmental Compliance Requirements Complete | 3/1/2007 | 3/1/2007 | Concluded | David Byrnes (Inactive) | 1/22/2008 8:23:58 AM | |
Description: Ensure existing NEPA/ESA compliance documents are current and cover all work associated with this work element prior to commencing work. | |||||||
B | Redd data collection 1 | 3/3/2007 | 5/5/2007 | Concluded | David Byrnes (Inactive) | 1/22/2008 8:23:58 AM | |
Description: Conduct first steelhead redd survey at each of 25 random sites | |||||||
C | Redd data collection 2 | 3/3/2007 | 6/2/2007 | Concluded | David Byrnes (Inactive) | 1/22/2008 8:23:58 AM | |
Description: Conduct 2nd steelhead redd survey at each of 25 random sites | |||||||
D | Redd data collection 3 | 4/1/2007 | 6/16/2007 | Concluded | David Byrnes (Inactive) | 1/22/2008 8:23:58 AM | |
Description: Conduct 3rd steelhead redd survey at each of 25 random sites | |||||||
E | Redd data collection 4 | 4/1/2007 | 6/30/2007 | Concluded | David Byrnes (Inactive) | 1/22/2008 8:23:58 AM | |
Description: When possible, we may conduct a 4th steelhead redd survey at each of 25 random sites | |||||||
F | EC | Environmental compliance requirements complete | 3/1/2007 | 1/31/2008 | Concluded | David Byrnes (Inactive) | 1/22/2008 8:23:59 AM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA). | |||||||
G | DELIV | Steelhead redd surveys | 7/30/2007 | Concluded | David Byrnes (Inactive) | 1/22/2008 8:23:59 AM | |
Description: Steelhead redd surveys will be conducted at 25 sites approximately every 2 weeks, from approximately March 15 through June 15 depending on environmental conditions. Therefore, each site will be surveyed 3 or 4 times within the spawning periods. Each site will include 1.0 miles of stream habitat. All redds within each site will be individually flagged, georeferenced by GPS, and numbered sequentially. Numbers of adult steelhead will be extrapolated from counts of steelhead redds conducted at 25 randomly-located sites per year throughout the Wenatchee Subbasin. Quality controlled raw data and quality controlled, georeferenced, summarized data of steelhead redd counts, including GPS locations, will be entered and stored in Microsoft Access databases known as Automated Template Modules (ATMs) that will be provided by NOAA Fisheries by May 30, 2007. Data will be uploaded by July 30, 2007 to NOAA Fisheries using the ATM and notice will be provided to BPA and Terraqua, Inc. when the data has been uploaded. The contractor will be responsible for all quality assurance/quality control steps necessary to ensure that data is properly collected and entered into the ATM. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributaries | Tributaries | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Status and Trend Monitoring | Status and Trend Monitoring |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
9874 | 47.887899665 | -120.875805814 | Washington | Chelan | Columbia Cascade | Wenatchee |
11440 | 47.660055352 | -120.609559053 | Washington | Chelan | Columbia Cascade | Wenatchee |
11441 | 47.762629143 | -120.799466238 | Washington | Chelan | Columbia Cascade | Wenatchee |
11442 | 47.448218222 | -120.785286795 | Washington | Chelan | Columbia Cascade | Wenatchee |
11443 | 47.399517202 | -120.621070556 | Washington | Chelan | Columbia Cascade | Wenatchee |
11444 | 47.455535098 | -120.737444311 | Washington | Chelan | Columbia Cascade | Wenatchee |
11445 | 47.674945703 | -120.651473978 | Washington | Chelan | Columbia Cascade | Wenatchee |
11446 | 47.844568342 | -120.827059608 | Washington | Chelan | Columbia Cascade | Wenatchee |
11447 | 47.438975187 | -120.523661984 | Washington | Chelan | Columbia Cascade | Wenatchee |
11448 | 47.733420418 | -120.747317954 | Washington | Chelan | Columbia Cascade | Wenatchee |
11449 | 47.442777592 | -120.494967353 | Washington | Chelan | Columbia Cascade | Wenatchee |
11450 | 47.591867827 | -120.575539308 | Washington | Chelan | Columbia Cascade | Wenatchee |
11451 | 47.464432142 | -120.489452834 | Washington | Chelan | Columbia Cascade | Wenatchee |
11452 | 47.676000895 | -120.652435309 | Washington | Chelan | Columbia Cascade | Wenatchee |
11453 | 48.069663718 | -120.851647014 | Washington | Chelan | Columbia Cascade | Wenatchee |
11454 | 47.879199385 | -120.769535772 | Washington | Chelan | Columbia Cascade | Wenatchee |
11455 | 47.379542963 | -120.489102216 | Washington | Chelan | Columbia Cascade | Wenatchee |
11456 | 47.557887 | -120.55819 | Washington | Chelan | Columbia Cascade | Wenatchee |
11457 | 47.390022414 | -120.699346422 | Washington | Chelan | Columbia Cascade | Wenatchee |
11458 | 48.024437986 | -120.829188382 | Washington | Chelan | Columbia Cascade | Wenatchee |
11459 | 47.432990742 | -120.545957946 | Washington | Chelan | Columbia Cascade | Wenatchee |
11460 | 47.709730189 | -120.741125873 | Washington | Chelan | Columbia Cascade | Wenatchee |
11461 | 47.574771729 | -120.551351901 | Washington | Chelan | Columbia Cascade | Wenatchee |
11462 | 47.91160702 | -120.702927254 | Washington | Chelan | Columbia Cascade | Wenatchee |
11463 | 47.385389027 | -120.601215588 | Washington | Chelan | Columbia Cascade | Wenatchee |
11464 | 47.532461 | -120.643713 | Washington | Chelan | Columbia Cascade | Wenatchee |
11465 | 47.34891071 | -120.598592657 | Washington | Chelan | Columbia Cascade | Wenatchee |
11466 | 47.481420534 | -120.486762624 | Washington | Chelan | Columbia Cascade | Wenatchee |
11467 | 47.77173525 | -120.757287054 | Washington | Chelan | Columbia Cascade | Wenatchee |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
BPA Fish and Wildlife Program Monitoring v1.0 | Russell Scranton | Draft | Steelhead redd surveys - US Forest Service (USFS): ISEMP Pre-2012 v1.0 |