200751300 EXP EELGRASS ENHANCEMENT AND RESTO
Contract Start Date:
2/1/2008
Contract End Date:
8/31/2009
Title:
C: 157 - Identify areas with suitable salinity levels and current conditions for eelgrass growth
Description:
Acquire salinity and water predictions based on an existing 3-D hydrodynamic model developed by the Oregon Graduate Institute of Science and Technology (OGI). These predictions will be summarized based on eelgrass growing season and imported into a format compatible with ESRI's ArcGIS.

To help assess suitable salinity, water levels and current conditions in the lower Columbia River estuary, we will analyze results from a multi-year 3D simulation database generated as part of OGI’s CORIE project. We will subcontract to OGI to conduct the analysis using the best quality-controlled database available at the time the work begins; currently they have a 7-year database from 1999 to 2005. Results of their analysis will be presented as spatial data, suitable for import into a GIS. The analysis will present an assessment of model uncertainty
WE Agreement Type:
Contracted
Deliverable Specification:
GIS datasets based on computational grid containing information on water elevation, currents and bottom salinity, with documentation.
WSE Effective Budget:
$35,685
% of Total WSE Effective Budget:
14.12%
WSE Start:
02/01/2008
WSE End:
02/28/2008
WSE Completion:
05/15/2008
WSE Progress:
Concluded
WSE ID Continued From:
n/a
WSE ID Continued To:
n/a
Finite or Recurring:
Recurring

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $35,685 $35,685

3 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 2/1/2008 2/1/2008 Concluded Anne Creason 12/27/2007 2:43:22 PM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).
B Acquire data from OGI 2/1/2008 2/28/2008 Concluded Anne Creason 12/27/2007 2:17:21 PM
Description: Acquire salinity and water predictions based on OGI work, including: 1. Map depicting the spatial resolution of our computational grid; 2. Climatologic statistics of water elevation and bottom salinity for: a. high and low tides b. spring and neap tides c. each month d. each season e. each year f. high- and low-flow periods 3. Time histories at selected locations; 4. Correlation plots relating water elevation and bottom salinity to river discharge. 5. Document processing and analysis steps.
C DELIV GIS datasets for water elevation, currents and bottom salinity 2/28/2008 Concluded Anne Creason 12/27/2007 2:17:21 PM
Description: GIS datasets based on computational grid containing information on water elevation, currents and bottom salinity, with documentation.

Work Site ID Latitude Longitude State County Province Subbasin
64806 46.248327 -124.001478 Oregon Clatsop Columbia River Estuary Columbia Estuary

Primary Focal Species:
Wildlife - All Anadromous Salmonids
Secondary Focal Species:
Wildlife - Dungeness Crab

""
Study Plan Name Study Plan Owner Protocol State Sample Design Name
BPA Fish and Wildlife Program Monitoring v1.0 Russell Scranton Draft Identify areas with suitable salinity levels and current conditions for eelgrass growth - Pacific Northwest National Laboratory v1.0

N/A