Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Select a work element:
Contract Number:
Contract Title:
2003-017-00 EXP ISEMP - NOAA FISH. COORDINATION & PROJ. DESIGN
Contract Start Date:
5/1/2010
Contract End Date:
6/30/2011
Title:
A: 29 - Install Beaver Dam Support structures
Description:
Fieldwork. Install beaver dam support (BDS) structures in Bridge Ck as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design.

This WE is integrated with, but does not duplicate any work specified by, contract 45470 WE O (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP restoration actions in Bridge Ck.
WE Agreement Type:
Contracted
Deliverable Specification:
Install FY10 component of Beaver Dam Support structures, repair FY09 component of Beaver Dam Support structures as described in the BCRMP Biological Opinion
WSE Effective Budget:
$41,100
% of Total WSE Effective Budget:
7.27%
WSE Start:
05/01/2010
WSE End:
04/30/2011
WSE Completion:
04/30/2011
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
1. 46273 REL 8 (05/01/2010 - 06/30/2011) $41,100 $41,100
Work Element Budget (Current Performance Period) $41,100 $41,100

5 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 5/1/2010 5/15/2010 Concluded David Byrnes (Inactive) 5/24/2010 2:48:16 PM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).
B Suggested Site Plan to include maps, structure types and locations. 5/1/2010 7/1/2010 Concluded David Byrnes (Inactive) 5/24/2010 2:48:16 PM
Description: Plan all in-water work for FY10 field season.
C Suggested Materials for structures purchased and staged at implementation sites 6/1/2010 8/1/2010 Concluded David Byrnes (Inactive) 5/24/2010 2:48:16 PM
Description: Purchase wood and stage on-site.
D Suggested Completion of all structure implementation for the specific system 8/1/2010 11/1/2010 Concluded David Byrnes (Inactive) 5/24/2010 2:48:16 PM
Description: Install beaver dam support structures in accordance to EC, annual site plan and ISEMP Bridge Ck IMW experimental design.
E DELIV In-water work -- Beaver Dam Support 4/30/2011 Concluded David Byrnes (Inactive) 5/24/2010 2:48:16 PM
Description: Install FY10 component of Beaver Dam Support structures, repair FY09 component of Beaver Dam Support structures as described in the BCRMP Biological Opinion

Work Site ID Latitude Longitude State County Province Subbasin
21528 44.663368 -120.260985 Oregon Wheeler Columbia Plateau John Day

Primary Focal Species:
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
Secondary Focal Species:
None

This work element does not require RM&E metadata