Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
BPA Fish and Wildlife Program Monitoring v1.0 | Russell Scranton | Draft |
N/A
N/A
This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 46273 REL 8 (05/01/2010 - 06/30/2011) | $50,284 | $40,284 | ||
Work Element Budget (Current Performance Period) | $40,284 | $40,284 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | PIT tag antenna design | 5/1/2010 | 4/30/2011 | Concluded | David Byrnes (Inactive) | 5/24/2010 2:48:17 PM | |
Description: Design specific PIT tag antenna and power configurations for ISEMP tasks in the John Day, Wenatchee/Entiat and Salmon River basins | |||||||
B | Install PIT tag antennas | 7/1/2010 | 6/30/2011 | Concluded | Chris Jordan | 3/3/2011 5:06:45 PM | |
Description: Install PIT tag antennas during low-flow work windows as part of ISEMP monitoring and experimental designs consistent with EC and ISEMP work plan in John Day, Wenatchee/Entiat and Salmon River basins. Additional work added with CCR-20674 (3/3/2011) -- repair SF John Day PIT tag antenna sites damaged during high flow event of 1/2011. | |||||||
C | DELIV | PIT tag antenna design | 4/30/2011 | Concluded | Chris Jordan | 3/3/2011 4:53:58 PM | |
Description: Design, build, install and maintain in-stream PIT tag antenna infrastructure for ISEMP projects in the John Day, Wenatchee/Entiat and Salmon River basins. |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
BPA Fish and Wildlife Program Monitoring v1.0 | Russell Scranton | Draft |