Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Select a work element:
Contract Number:
Contract Title:
2003-017-00 EXP ISEMP - NOAA FISH. COORDINATION & PROJ. DESIGN
Contract Start Date:
5/1/2010
Contract End Date:
6/30/2011
Title:
F: 156 - PIT tag antenna design and installation
Description:
The ISEMP project proposes to use PIT tags implanted in juvenile and adult spring/summer Chinook salmon and steelhead, in conjunction with extended length PIT tag arrays to estimate juvenile and adult movement patterns, survival, and abundance via mark-recapture. The extended length PIT tag arrays consist of two sets of antennas, separated by a distance of approximately 5 m that span the entire width of the stream. As PIT tagged juveniles or adults pass the arrays the PIT tags are triggered to report an individual specific tag code. Due to the upstream and downstream antennas, the resulting information can be used to determine the direction of fish movement and the efficiency of the array. Arrays will be deployed at the mouth of the major tributaries and in the mainstem Bridge Ck, SF John Day, Wenatchee, Entiat, SF Salmon and Lemhi Rivers. Juveniles will be collected and tagged throughout the summer in multiple tributaries.

This WE is integrated with, but does not duplicate and work specified by, contract 45428 WE J & K (Quantitative Consultants Inc) and contract 39498 WE C-H (Biomark).

CCR-20674 (3/3/2011) change to WE F. Additional work period will allow repair of SF John Day PIT antenna sites damaged in January 2011 high flow events. No in water work is necessary, but electronics must be replaced and power sources reconfigured.
WE Agreement Type:
Contracted
Deliverable Specification:
Design, build, install and maintain in-stream PIT tag antenna infrastructure for ISEMP projects in the John Day, Wenatchee/Entiat and Salmon River basins.
WSE Effective Budget:
$40,284
% of Total WSE Effective Budget:
7.13%
WSE Start:
05/01/2010
WSE End:
06/30/2011
WSE Completion:
04/30/2011
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
1. 46273 REL 8 (05/01/2010 - 06/30/2011) $50,284 $40,284
Work Element Budget (Current Performance Period) $40,284 $40,284

3 Milestones
Sort Type Title Start End Status Modified By Modified Date
A PIT tag antenna design 5/1/2010 4/30/2011 Concluded David Byrnes (Inactive) 5/24/2010 2:48:17 PM
Description: Design specific PIT tag antenna and power configurations for ISEMP tasks in the John Day, Wenatchee/Entiat and Salmon River basins
B Install PIT tag antennas 7/1/2010 6/30/2011 Concluded Chris Jordan 3/3/2011 5:06:45 PM
Description: Install PIT tag antennas during low-flow work windows as part of ISEMP monitoring and experimental designs consistent with EC and ISEMP work plan in John Day, Wenatchee/Entiat and Salmon River basins. Additional work added with CCR-20674 (3/3/2011) -- repair SF John Day PIT tag antenna sites damaged during high flow event of 1/2011.
C DELIV PIT tag antenna design 4/30/2011 Concluded Chris Jordan 3/3/2011 4:53:58 PM
Description: Design, build, install and maintain in-stream PIT tag antenna infrastructure for ISEMP projects in the John Day, Wenatchee/Entiat and Salmon River basins.

Implementation Metrics
None

This work element does not require Focal Species
Study Plan Name Study Plan Owner Protocol State Sample Design Name
BPA Fish and Wildlife Program Monitoring v1.0 Russell Scranton Draft

N/A

N/A