A |
EC |
Environmental Compliance Requirements Complete |
3/1/2014 |
2/28/2015 |
Concluded |
Jamie Cleveland (Inactive) |
10/23/2014 3:13:04 PM |
|
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA). |
B |
|
Badger Creek: Determine Upper Distribution of Steelhead Redds |
3/17/2014 |
7/11/2014 |
Concluded |
Jamie Cleveland (Inactive) |
10/23/2014 3:13:04 PM |
|
Description: Conduct end of distribution surveys in Badger Creek. |
C |
|
Beaver Creek: Determine Upper Distribution of Steelhead Redds |
3/17/2014 |
7/11/2014 |
Concluded |
Jamie Cleveland (Inactive) |
10/23/2014 3:13:04 PM |
|
Description: Conduct end of distribution surveys in Beaver Creek. |
D |
|
Boulder Creek: Determine Upper Distribution of Steelhead Redds |
3/17/2014 |
7/11/2014 |
Concluded |
Jamie Cleveland (Inactive) |
10/23/2014 3:13:04 PM |
|
Description: Conduct end of distribution surveys in Boulder Creek. |
E |
|
Mill Creek: Determine Upper Distribution of Steelhead Redds |
3/17/2014 |
7/11/2014 |
Concluded |
Jamie Cleveland (Inactive) |
10/23/2014 3:13:04 PM |
|
Description: Conduct end of distribution surveys in Mill Creek. |
F |
|
SC: Determine Upper Distribution of Steelhead Redds |
3/17/2014 |
7/11/2014 |
Concluded |
Jamie Cleveland (Inactive) |
10/23/2014 3:13:04 PM |
|
Description: Conduct end of distribution surveys in SC. |
G |
|
WSR: Determine Upper Distribution of Steelhead Redds |
3/17/2014 |
7/11/2014 |
Concluded |
Jamie Cleveland (Inactive) |
10/23/2014 3:13:04 PM |
|
Description: Conduct end of distribution surveys in WSR. |
H |
|
Badger Creek: Determine Upper Distribution of Steelhead Redds |
3/9/2015 |
6/30/2015 |
Concluded |
Jen Graham |
1/28/2015 2:01:08 PM |
|
Description: Conduct end of distribution surveys in Badger Creek. |
I |
|
Beaver Creek: Determine Upper Distribution of Steelhead Redds |
3/9/2015 |
6/30/2015 |
Concluded |
Jen Graham |
1/28/2015 2:01:09 PM |
|
Description: Conduct end of distribution surveys in Beaver Creek. |
J |
|
Boulder Creek: Determine Upper Distribution of Steelhead Redds |
3/9/2015 |
6/30/2015 |
Concluded |
Jen Graham |
1/28/2015 2:01:09 PM |
|
Description: Conduct end of distribution surveys in Boulder Creek. |
K |
|
Mill Creek: Determine Upper Distribution of Steelhead Redds |
3/9/2015 |
6/30/2015 |
Concluded |
Jen Graham |
1/28/2015 2:01:10 PM |
|
Description: Conduct end of distribution surveys in Mill Creek. |
L |
|
SC: Determine Upper Distribution of Steelhead Redds |
3/9/2015 |
6/30/2015 |
Concluded |
Jen Graham |
1/28/2015 2:01:10 PM |
|
Description: Conduct end of distribution surveys in SC. |
M |
|
WSR: Determine Upper Distribution of Steelhead Redds |
3/9/2015 |
6/30/2015 |
Concluded |
Jen Graham |
1/28/2015 2:01:11 PM |
|
Description: Conduct end of distribution surveys in WSR. |
N |
|
Database Entry & Verification |
3/17/2014 |
6/30/2015 |
Concluded |
Jen Graham |
1/28/2015 2:01:11 PM |
|
Description: All collected data will be entered into an electronic spreadsheet and/or database and verified for completeness and accuracy. |
O |
PUBPROTOCOL |
Review, Revise, and Publish Protocol, Study Design, and Methods in Monitoringmethods.org |
3/1/2014 |
6/30/2015 |
Concluded |
Jen Graham |
1/28/2015 2:01:12 PM |
|
Description: The Protocol (including temporal and spatial design) and Methods for this work element are stored at monitoringmethods.org and need to be finalized (i.e., "Published" through monitoringmethods.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously published Protocols/Methods to ensure that they are consistent with how work will be done in any subsequent contract. |
P |
DELIV |
Steelhead: Determine Upper Distribution of Redds in Reservation Streams |
|
6/30/2015 |
Concluded |
Jen Graham |
1/28/2015 2:01:13 PM |
|
Description: Determine upper distribution of steelhead/O. mykiss redds in SC, the WSR, Beaver Creek, Badger Creek, Mill Creek, and Boulder Creek, and ensure those points are entered into the CTWSRO GIS database.
For establishing the end of spawning distribution, surveys will be conducted upstream of the uppermost redd survey index reach (where redds have been identified in recent years) in SC and the WSR watersheds (which includes the WSR, Beaver Creek, Badger Creek, Mill Creek, and Boulder Creek). This will be completed by including additional ground surveys along stream banks during redd counts for summer steelhead (mid-March and June). Less is known about spawning distribution in tributaries, so surveys are likely to require more effort, especially since access is more limited. As surveyors reach stream headwaters and are near upper limits of spawning distribution, foot survey efforts will continue for about 1 km above the last redd observed (Gallagher et al. 2007). |