Title | Link |
---|---|
NONE - No data repository or not electronically available | N/A |
This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $6,000 | $6,000 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 5/1/2014 | 11/6/2014 | Concluded | Bruce Kinkead | 12/5/2013 4:28:59 PM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA). | |||||||
B | PUBPROTOCOL | Review, revise, and Publish protocol, study design, and methods in monitoringmethods.org | 5/1/2014 | 4/30/2015 | Concluded | Bruce Kinkead | 12/5/2013 4:28:59 PM |
Description: The Protocol (including temporal and spatial design) and Methods for this work element are stored at monitoringmethods.org and need to be finalized (i.e., "Published" through monitoringmethods.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously published Protocols/Methods to ensure that they are consistent with how work will be done in any subsequent contract. | |||||||
C | Deploy continous stage markers at 2 tributary sites | 5/1/2014 | 4/30/2015 | Concluded | Bruce Kinkead | 12/5/2013 4:28:59 PM | |
Description: Stage readers will be deployed Febuary 1st to October 31st each year at 4 sites within Hangman Creek and tributaries; Nehchen Creek, Indian Creek, Sheep Cr, and Hangman within Buckless prop. | |||||||
D | Measure discharge and stage | 5/1/2014 | 4/30/2015 | Concluded | Bruce Kinkead | 12/5/2013 4:28:59 PM | |
Description: Discharge will be taken monthly at 12 primary sites, and periodically at 14 secondary sites depending on flow, ice conditions, and accessibility: Lower Indian, Indian Pow Wow, Lower Nehchen, Martin, Lower SF Hangman, Hangman at forest site, Hangman just above SF confluence, Lower Mission, Lower Sheep, Hangman @ stateline, Hangman @ Buckless prop., and Smith Creek. | |||||||
E | Measure D.O. pH, conductivity and temp. | 5/1/2014 | 4/30/2015 | Concluded | Bruce Kinkead | 12/5/2013 4:28:59 PM | |
Description: A multiparameter probe will be used to collect D.O. pH, conductivity, and temp at the same 12 primary sites and addtional 14 secondary sites and frequency that discharge is taken. | |||||||
F | Measure D.O. in Sheep Creek to obtain a vertical oxygen profile within pools created by beaver | 5/1/2014 | 4/30/2015 | Concluded | Bruce Kinkead | 12/5/2013 4:28:59 PM | |
Description: Using a multiparameter probe, measure dissolved oxygen and temperature within deep pools created by beaver dams to assess stratification and suitability for salmonids. | |||||||
G | Data entry | 5/1/2014 | 4/30/2015 | Concluded | Bruce Kinkead | 12/5/2013 4:28:59 PM | |
Description: Complete data entry as required for all sampling milestones listed above. | |||||||
H | DELIV | Water Quality Data Collected | 4/30/2015 | Concluded | Bruce Kinkead | 12/5/2013 4:28:59 PM | |
Description: 1) Hourly stage readings to 0.01 m at Indian Creek, Nehchen Creek, and Sheep Cr, and one mainstem Hangman location. There will be four sites on the mainstem of Hangman Creek, and at fish-bearing streams Sheep, Mission, Nehchen, Martin and Indian (2 sites), S.F. Hangman, and Smith, a no fish-bearing stream. There will also be sampling at an additional 15 sites in June and August in the forested areas of the same streams. Parameters sampled will include discharge, Dissolved Oxygen, Temp, and conductivity.Turbidity will be analyzed in-house. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributary Habitat | Tributary Habitat | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Status and Trend Monitoring | Status and Trend Monitoring | |||
1478. Secondary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Action Effectiveness Monitoring | Action Effectiveness Monitoring | |||
1495. Secondary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributary Habitat | Tributary Habitat |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
28752 | 47.097559 | -116.814592 | Idaho | Benewah | Intermountain | Spokane |
54431 | 47.202566 | -117.039759 | Idaho | Benewah | Intermountain | Spokane |
54456 | 47.145276 | -116.921373 | Idaho | Benewah | Intermountain | Spokane |
54467 | 47.08625 | -116.946957 | Idaho | Benewah | Intermountain | Spokane |
54485 | 47.099651 | -116.949393 | Idaho | Benewah | Intermountain | Spokane |
54507 | 47.120362 | -116.93051 | Idaho | Benewah | Intermountain | Spokane |
54518 | 47.09691 | -116.897616 | Idaho | Benewah | Intermountain | Spokane |
54539 | 47.122494 | -116.874165 | Idaho | Benewah | Intermountain | Spokane |
54570 | 47.132667 | -116.84389 | Idaho | Benewah | Intermountain | Spokane |
54590 | 47.158068 | -116.803778 | Idaho | Benewah | Intermountain | Spokane |
54614 | 47.106093 | -116.800047 | Idaho | Benewah | Intermountain | Spokane |
54633 | 47.113464 | -116.945956 | Idaho | Benewah | Intermountain | Spokane |
54657 | 47.128068 | -116.75826 | Idaho | Benewah | Intermountain | Spokane |
54678 | 47.131799 | -116.760697 | Idaho | Benewah | Intermountain | Spokane |
54700 | 47.129667 | -116.764123 | Idaho | Benewah | Intermountain | Spokane |
54719 | 47.116814 | -116.726783 | Idaho | Benewah | Intermountain | Spokane |
54739 | 47.116738 | -116.725793 | Idaho | Benewah | Intermountain | Spokane |
54751 | 47.105712 | -116.740831 | Idaho | Benewah | Intermountain | Spokane |
54770 | 47.083269 | -116.772967 | Idaho | Benewah | Intermountain | Spokane |
54789 | 47.074441 | -116.768745 | Idaho | Benewah | Intermountain | Spokane |
54809 | 47.066583 | -116.78542 | Idaho | Benewah | Intermountain | Spokane |
55087 | 47.12983 | -116.854267 | Idaho | Benewah | Intermountain | Spokane |
69190 | 47.093545 | -116.775207 | Idaho | Benewah | Intermountain | Spokane |
74197 | 47.168194 | -116.918231 | Idaho | Benewah | Intermountain | Spokane |
Title | Link |
---|---|
NONE - No data repository or not electronically available | N/A |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
Stream discharge monitoring in the Upper Hangman Creek Watershed v1.0 | Stephanie Hallock | Draft | Collect Water Quality & Quantity Data - Coeur D'Alene Tribe v1.0 |
Title | Category | Subcategory | Subcategory focus 1 | Subcategory focus 2 |
---|---|---|---|---|
Stage-Discharge relationship at a gaging site | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Stream discharge at a site | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
water elevation at a site over time | Hydrology/Water Quantity | Gauge (ID: 336) | NA | NA |