Project 2007-064-00 - Slate Creek Watershed Restoration
Project Number:
2007-064-00
Agency, Institution or Organization:
Nez Perce Tribe Dept. Fisheries Resource Management Watershed Division
Short Description:
Restore and protect the Slate Creek Watershed for the benefit of both resident and anadromous fish using an overall watershed approach. Restoration and protection efforts will be done cooperatively with the Nez Perce National Forest.
Status:
Finalized
Province:
Mountain Snake
Subbasin:
Salmon
Contact Name:
Jennifer Boie
Contact Organization:
Nez Perce Tribe
Contact Email:
jenniferb@nezperce.org
Contact Address:
P.O. Box 365
Contact City, State, Zip:
Lapwai ID 83540
Contact Role(s):
Project Lead
Information Transfer:
Results from restoration and watershed improvement activities will be published in monitoring and evaluation reports. New findings, restoration techniques, and any other new technologies incorporated into design and implementation will be published in project specific reports. Results of restoration work will be shared between Forest Service Districts, other Forests, within the Nez Perce Tribe, and other various agencies.

Description Latitude Longitude
These lat. and lon. are an overall approximation of the entire watershed. The Slate Creek Watershed encompasses approximately 83, 034 acres. Please see narrative for more detailed description. 45.586 -116.076

Name Primary Secondary
Trout
Cutthroat Trout
Trout
Chinook
Steelhead
All Resident Fish

Short Objective Detailed Objective Strategy Subbasin Plan
Environmental Problem 10, Aquatic Objective 10A Starting in important habitats, reduce instream sedimentation to levels meeting applicable water quality standards (e.g., TMDLs) and measures, with an established upward trend in the number of st... 10A3, 10A5, 10A6, 10A8, 10A9, 61A5 Salmon
Environmental Problem 12, Aquatic Objective 12A Rehabilitate connectivity where it will benefit native fish populations, with emphasis on bull trout. Improve access to habitat currently blocked by manmade barriers.... 12A1, 12A2, 28A2, 8D5 Salmon
Environmental Problem 49, Aquatic Objective 49C Reduce floodplain/channel encroachment (e.g., roads, development, etc.). 8B4, 8C1, 8C2, 8C3, 9A13, 49C1 Salmon
Environmental Problem 51,Terrestrial Objective 51B Restore 50% of degraded (functional at risk or non-functional) riparian areas to proper functioning condition by 2019.... 51B1, 51B2, 51B4, 51B6, 51B8, 8A1, 8A2, 8D1, 9A13, 45A2, 45A3, 51A4, 51A5 Salmon
Environmental Problem 56,Terrestrial Objective 56A Prevent the introduction of exotic invasive plant species into native habitats (see section 6.2: Terrestrial Prioritizations) to conserve quality, quantity, and diversity of native plant communit... 56A2, 56A3, 56A5, 56A8 Salmon
Environmental Problem 56,Terrestrial Objective 56B Reduce the extent and density of established exotic invasive plant species. 56B1, 56B3, 56B4, 56B5, 56B6 Salmon
Environmental Problem 59,Terrestrial Objective 59A Reduce the impact of the transportation system and motorized access on wildlife and fish populations and habitats.... 59A1, 59A2, 59A4, 61A5, 8B4, 10A3 Salmon
Socioeconomic Prob. 64,Socioeconomic Objective 64A In the lower portion of the Salmon subbasin, minimize negative impacts on and maximize benefits to local communities while maximizing benefits to fish and wildlife and users of those resources.... 64A2, 64A3, 64A4, 64A5 Salmon
Socioeconomic Prob. 65,Socioeconomic Objective 65A Protect and foster both Indian and non-Indian cultural uses of natural resources in the Salmon subbasin.... 65A1 Salmon
Socioeconomic Prob. 66,Socioeconomic Objective 66A In the lower portion of the Salmon subbasin, develop a group to guide implementation of this plan and to coordinate recommendations with co-managers for funding, implementation, and other manage... 66A2, 66A3, 66A7, 66A8, 66A9 Salmon

Line Item Notes FY07 Cost FY08 Cost FY09 Cost
Personnel 2 FTE includes: Project Lead, Support Staff, and Technical Staff $97,998 $103,877 $110,110
Fringe Benefits NPT employee fringe 30% $29,399 $31,163 $33,033
Supplies Field Supplies, Office Supplies, Non-expendable property $27,724 $9,491 $8,639
Travel Travel to meetings/conferences and perdiem $4,411 $4,411 $4,411
Overhead NPT indirect rate 29.64 % $50,422 $47,288 $49,434
Other Consultants and Contracts- subcontracted items $0 $120,000 $180,000
Other Training $2,169 $2,169 $2,169
Other 2 GSA Vehicles $8,645 $8,645 $8,645
Other Office Space Rental $3,000 $3,000 $3,000

Provision Funding Source Type FY07 Value FY08 Value FY09 Value
NEPA Analysis & Decision (Little Slate portion of watershed) Nez Perce National Forest In-Kind $175,000 $0 $0
Project design, contract preparation, contract administration, monitoring, etc Nez Perce National Forest In-Kind $10,000 $10,000 $10,000
Portion of contract award funding Nez Perce National Forest, PCSRF, Central ID RAC Cash $30,000 $30,000 $30,000

WE ID WE Name Title Budget Start Date End Date Objectives Metrics
165 Produce Environmental Compliance Documentation Provide NEPA Information to BPA $55,279 03/01/2007 02/28/2010 Environmental Problem 10, Aquatic Objective 10A Environmental Problem 12, Aquatic Objective 12A Environmental Problem 49, Aquatic Objective 49C Environmental Problem 51,Terrestrial Objective 51B Environmental Problem 56,Terrestrial Objective 56A Environmental Problem 56,Terrestrial Objective 56B Environmental Problem 59,Terrestrial Objective 59A
99 Outreach and Education Slate Creek Watershed Education and Outreach $46,163 03/01/2007 02/28/2010 Environmental Problem 10, Aquatic Objective 10A Environmental Problem 12, Aquatic Objective 12A Environmental Problem 49, Aquatic Objective 49C Environmental Problem 51,Terrestrial Objective 51B Environmental Problem 56,Terrestrial Objective 56A Environmental Problem 56,Terrestrial Objective 56B Environmental Problem 59,Terrestrial Objective 59A Socioeconomic Prob. 64,Socioeconomic Objective 64A Socioeconomic Prob. 65,Socioeconomic Objective 65A Socioeconomic Prob. 66,Socioeconomic Objective 66A * # of general public reached: 50 * # of students reached: 100 * # of teachers reached: 5
115 Produce Inventory or Assessment Survey Stream Crossings in Little Slate drainage $77,356 06/01/2007 08/31/2007 Environmental Problem 12, Aquatic Objective 12A
118 Coordination General Project Coordination $77,065 03/01/2007 02/28/2010
119 Manage and Administer Projects Management, Coordination and Communication $97,381 03/01/2007 02/28/2010
174 Produce Plan Report findings on Little Slate Stream Crossings Survey and Prioritize Culverts for Replacement $62,368 10/01/2007 02/28/2008 Environmental Problem 12, Aquatic Objective 12A
175 Produce Design and/or Specifications Culvert Design $21,482 04/01/2008 08/31/2008 Environmental Problem 10, Aquatic Objective 10A Environmental Problem 12, Aquatic Objective 12A
33 Decommission Road Decommission 20 miles of road within Little Slate Creek $156,754 03/01/2008 11/30/2009 Environmental Problem 10, Aquatic Objective 10A Environmental Problem 49, Aquatic Objective 49C Environmental Problem 51,Terrestrial Objective 51B Environmental Problem 56,Terrestrial Objective 56A Environmental Problem 56,Terrestrial Objective 56B Environmental Problem 59,Terrestrial Objective 59A Socioeconomic Prob. 64,Socioeconomic Objective 64A * # of road miles decommissioned : 20
47 Plant Vegetation Seed Decommissioned Road $75,063 03/01/2008 11/30/2009 Environmental Problem 10, Aquatic Objective 10A Environmental Problem 49, Aquatic Objective 49C Environmental Problem 51,Terrestrial Objective 51B Environmental Problem 56,Terrestrial Objective 56A Environmental Problem 56,Terrestrial Objective 56B Environmental Problem 59,Terrestrial Objective 59A Socioeconomic Prob. 64,Socioeconomic Objective 64A * # of acres of planted: 20 miles
53 Remove vegetation Reduce Noxious and Invasive Weeds along Decommissioned Roads $25,176 03/01/2008 02/28/2010 Environmental Problem 56,Terrestrial Objective 56A Environmental Problem 56,Terrestrial Objective 56B Socioeconomic Prob. 64,Socioeconomic Objective 64A * # of acres treated: 20 miles
55 Upland Erosion and Sedimentation Control Erosion Control on Decommissioned Road $35,063 03/01/2008 11/30/2009 Environmental Problem 10, Aquatic Objective 10A Environmental Problem 59,Terrestrial Objective 59A * # of acres treated: 20 miles
184 Install Fish Passage Structure Replace Culvert in Little Slate $75,869 07/01/2009 08/31/2009 Environmental Problem 10, Aquatic Objective 10A Environmental Problem 12, Aquatic Objective 12A * Does the structure remove or replace a fish passage barrier?: yes
157 Collect/Generate/Validate Field and Lab Data Culvert Replacement Data Collection $25,176 03/01/2008 02/28/2010 Environmental Problem 10, Aquatic Objective 10A Environmental Problem 12, Aquatic Objective 12A Primary R, M, and E Type: Project Implementation
157 Collect/Generate/Validate Field and Lab Data Decommissioned Road Data Collection $25,176 03/01/2008 02/28/2010 Environmental Problem 10, Aquatic Objective 10A Environmental Problem 49, Aquatic Objective 49C Environmental Problem 56,Terrestrial Objective 56A Environmental Problem 56,Terrestrial Objective 56B Environmental Problem 59,Terrestrial Objective 59A Primary R, M, and E Type: Project Implementation
160 Create/Manage/Maintain Database Maintain Slate Creek Project Database $62,658 03/01/2007 02/28/2010 Environmental Problem 10, Aquatic Objective 10A Environmental Problem 12, Aquatic Objective 12A Environmental Problem 56,Terrestrial Objective 56A Environmental Problem 56,Terrestrial Objective 56B Environmental Problem 59,Terrestrial Objective 59A
161 Disseminate Raw/Summary Data and Results Disseminate Project Results to Professional Audiences at Scientific and Professional Conferences $35,224 03/01/2007 02/28/2010

Date Reviewer Short Recommendation Comments FY07 FY08 FY09
06/02/2006 ISRP Response requested This is exactly the same proposal as 200710400 (White Bird Cr.) with only the name changed. A response is requested on: 1. Justification of benefits to fish. 2. Provisions of M&E to show benefits t... More N/A N/A N/A
08/31/2006 ISRP Fundable in part The original proposal was a generic, broad-brush habitat improvement project including barrier removal, road decommissioning, hydrologic restructuring, vegetation management and other practices, none ... More N/A N/A N/A
09/15/2006 NPCC $80,000.00 $80,000.00 $80,000.00
10/23/2006 NPCC Fund 2007 Revised Budget: FTE reduced, complete culvert survey in Little Slate remains unchanged, reduced road decommissioning and culvert replacement (contingent on supplemental funding). More $80,000.00 $80,000.00 $80,000.00