| | | | | | | | | | | | |
---|
A | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | A | SR | Mar-Jun 2008 (3/1/2008 - 6/30/2008) | 07/01/2008 | 07/15/2008 | Concluded | David Byrnes (Inactive) | 07/13/2007 10:33 AM |
A | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | B | SR | Jul-Sep 2008 (7/1/2008 - 9/30/2008) | 10/01/2008 | 10/15/2008 | Concluded | David Byrnes (Inactive) | 07/13/2007 10:33 AM |
A | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | C | SR | Oct-Dec 2008 (10/1/2008 - 12/31/2008) | 01/01/2009 | 01/15/2009 | Concluded | David Byrnes (Inactive) | 07/13/2007 10:33 AM |
A | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | D | SR | Final Jan-Feb 2009 (1/1/2009 - 2/28/2009) | 02/14/2009 | 02/28/2009 | Concluded | David Byrnes (Inactive) | 07/13/2007 10:33 AM |
B | 165 | Produce Environmental Compliance Documentation | Environmental Compliance | This project is concerned with coordinating the fieldwork of other agencies participating in the ISEMP and with outreach to disseminate information about the ISEMP. It does not require NOAA, USFWS, or WDFW permits as there is no "take" of fish. As such Environmental Compliance permits are not appropriate in this case. | A | | Environmental Documentation | 03/01/2008 | 03/01/2008 | Concluded | Pamela Nelle | 12/03/2007 2:38 PM |
B | 165 | Produce Environmental Compliance Documentation | Environmental Compliance | This project is concerned with coordinating the fieldwork of other agencies participating in the ISEMP and with outreach to disseminate information about the ISEMP. It does not require NOAA, USFWS, or WDFW permits as there is no "take" of fish. As such Environmental Compliance permits are not appropriate in this case. | B | DELIV | Environmental Compliance | | 03/01/2008 | Concluded | Pamela Nelle | 12/03/2007 2:38 PM |
C | 157 | Collect/Generate/Validate Field and Lab Data | Water Quality Data collection in the Wenatchee watershed | Utilizing continuously deployed Hydrolabs at five (5) sites on the Wenatchee River, collect water quality / nutrient data using previously established collection methods. Data will be submitted to participating agencies. | A | EC | Environmental compliance requirements complete | 03/01/2008 | 03/30/2008 | Concluded | Pamela Nelle | 12/03/2007 2:42 PM |
C | 157 | Collect/Generate/Validate Field and Lab Data | Water Quality Data collection in the Wenatchee watershed | Utilizing continuously deployed Hydrolabs at five (5) sites on the Wenatchee River, collect water quality / nutrient data using previously established collection methods. Data will be submitted to participating agencies. | B | | Submit collection methods | 04/01/2008 | 04/28/2008 | Concluded | Pamela Nelle | 12/03/2007 2:42 PM |
C | 157 | Collect/Generate/Validate Field and Lab Data | Water Quality Data collection in the Wenatchee watershed | Utilizing continuously deployed Hydrolabs at five (5) sites on the Wenatchee River, collect water quality / nutrient data using previously established collection methods. Data will be submitted to participating agencies. | C | | Collect nutrient data | 04/01/2008 | 02/28/2009 | Concluded | Pamela Nelle | 12/03/2007 2:42 PM |
C | 157 | Collect/Generate/Validate Field and Lab Data | Water Quality Data collection in the Wenatchee watershed | Utilizing continuously deployed Hydrolabs at five (5) sites on the Wenatchee River, collect water quality / nutrient data using previously established collection methods. Data will be submitted to participating agencies. | D | | Collect water quality data | 04/01/2008 | 02/28/2009 | Concluded | Pamela Nelle | 12/03/2007 2:42 PM |
C | 157 | Collect/Generate/Validate Field and Lab Data | Water Quality Data collection in the Wenatchee watershed | Utilizing continuously deployed Hydrolabs at five (5) sites on the Wenatchee River, collect water quality / nutrient data using previously established collection methods. Data will be submitted to participating agencies. | E | DELIV | Submit Collected Water Quality Data | | 02/28/2009 | Concluded | Pamela Nelle | 01/02/2008 10:22 AM |
D | 161 | Disseminate Raw/Summary Data and Results | RM&E Data Management | Consolidate raw water quality data, quality control, and submit to NOAA-Fisheries. | A | | Submit quality controlled water quality data to NOAA- Fisheries | 12/01/2008 | 02/28/2009 | Concluded | Pamela Nelle | 12/03/2007 2:43 PM |
D | 161 | Disseminate Raw/Summary Data and Results | RM&E Data Management | Consolidate raw water quality data, quality control, and submit to NOAA-Fisheries. | B | DELIV | Submit quality controlled water quality data to NOAA-Fisheries | | 02/28/2009 | Concluded | Pamela Nelle | 12/03/2007 2:44 PM |
E | 157 | Collect/Generate/Validate Field and Lab Data | Steelhead Spawning survey outreach | Outreach and education to specific landowners about survey and request access permission to conduct Steelhead spawning surveys on private land. | A | EC | Environmental compliance requirements complete | 03/01/2008 | 03/01/2008 | Concluded | Pamela Nelle | 12/03/2007 2:51 PM |
E | 157 | Collect/Generate/Validate Field and Lab Data | Steelhead Spawning survey outreach | Outreach and education to specific landowners about survey and request access permission to conduct Steelhead spawning surveys on private land. | B | | Obtain list of survey sites from U.S. Forest Service | 04/01/2008 | 05/31/2008 | Concluded | Pamela Nelle | 12/03/2007 2:51 PM |
E | 157 | Collect/Generate/Validate Field and Lab Data | Steelhead Spawning survey outreach | Outreach and education to specific landowners about survey and request access permission to conduct Steelhead spawning surveys on private land. | C | | Contact identified landowners | 04/02/2008 | 06/15/2008 | Concluded | Pamela Nelle | 12/03/2007 2:51 PM |
E | 157 | Collect/Generate/Validate Field and Lab Data | Steelhead Spawning survey outreach | Outreach and education to specific landowners about survey and request access permission to conduct Steelhead spawning surveys on private land. | D | | Follow up with landowners as needed | 04/02/2008 | 06/15/2008 | Concluded | Pamela Nelle | 12/03/2007 2:51 PM |
| | | | | | | | | | | | |