Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 44614: 1996-035-01 EXP YAKAMA RESERVATION WATERSHEDS PROJECT
Project Number:
Title:
Yakama Reservation Watershed Project
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
44614
Contract Title:
1996-035-01 EXP YAKAMA RESERVATION WATERSHEDS PROJECT
Contract Continuation:
Previous: Next:
40083: 199603501 EXP YAKAMA RESERVATION WATERSHEDS PROJECT
  • 52386: 1996-035-01 EXP YAKAMA RESERVATION WATERSHED PROJECT
Contract Status:
Closed
Contract Description:
The YRWP works to restore natural function to the Satus, Toppenish and Ahtanum Watersheds. Our restoration and monitoring efforts take a comprehensive approach to the restoration of habitat for fisheries resources including steelhead and bull trout.
Account Type(s):
Expense
Contract Start Date:
10/01/2009
Contract End Date:
03/31/2011
Current Contract Value:
$1,720,233
Expenditures:
$1,720,233

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shannon Adams Yakama Confederated Tribes Yes Contract Manager adas@yakamafish-nsn.gov (509) 945-0754
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Kelly Clayton Yakama Confederated Tribes Yes Technical Contact clak@yakamafish-nsn.gov (509) 945-7195
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Tana Hoptowit Yakama Confederated Tribes Yes Interested Party hopt@yakamafish-nsn.gov (509) 865-5121x6318
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jay Marcotte Bonneville Power Administration Yes COR jgmarcotte@bpa.gov (503) 230-3943
Lisa Marko MacLellan Bonneville Power Administration No Interested Party lmmarko@bpa.gov (503) 230-4047
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Steve Parker Yakama Confederated Tribes No Supervisor pars@yakamafish-nsn.gov (509) 865-6262x6342
Tim Resseguie Yakama Confederated Tribes Yes Technical Contact rest@yakamafish-nsn.gov (509) 945-7409
Brandon Rogers Yakama Confederated Tribes Yes Interested Party rogb@yakamafish-nsn.gov (509) 949-4109
Paul Ward Yakama Confederated Tribes No Supervisor warp@yakamafish-nsn.gov (509) 949-4129


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
projects managed B: 119. Manage Restoration Projects 02/28/2011 09/28/2010
List of Selected Projects (and contingency projects) to be implemented in 2008 C: 114. Select habitat improvement actions for 2011 02/28/2011 08/15/2010
Project databases that are maintained and up to date. D: 160. Update Project Database 02/28/2011 09/28/2010
Disseminated data E: 161. Create informal summary reports and maps 02/28/2011 09/28/2010
5 outreach sessions completed F: 99. Conduct field and classroom education at local schools 02/28/2011 09/28/2010
Technical review and input provided to various policy and planning efforts G: 122. Input to various Tribal planning and policy efforts 02/28/2011 09/28/2010
Completed environmental documentation H: 165. Environmental Compliance 01/01/2010 01/01/2010
Completed FY 09 Annual Report submitted to BPA I: 132. Produce Project Annual Report for FY 09 11/28/2009 11/28/2009
Leasing Range Units to protect riparian areas J: 92. Lease Range Units in the Logy Creek Watershed 02/28/2011 02/28/2011
3 rotary screw traps deployed and recovered K: 70. Deploy and Recover 5ft Rotary Screw Traps 06/08/2010 06/08/2010
3 miles of completed snorkel surveys L: 157. Snorkel Survey NF Simcoe Creek 02/28/2011 09/28/2010
3 miles of completed snorkel surveys M: 157. Snorkel Survey Mid Toppenish Creek 01/31/2011 09/28/2010
3 miles of completed snorkel surveys N: 157. Snorkel Survey Ahtanum Creek Diversions 01/31/2011 09/28/2010
3 miles of completed snorkel surveys O: 157. Snorkel Survey Ahtanum Creek Forks index site 01/31/2011 09/28/2010
3 miles of completed snorkel surveys P: 157. Snorkel Survey Dry and Logy Creek index sites 01/31/2011 09/28/2010
Wapato Irrigation Project diversions managed for minimum instream flow. Q: 186. Manage Operation of Upper and Lower WIP canals on Ahtanum Creek 02/28/2011 09/28/2010
Winter stock water diversion managed at Olney lateral R: 186. Assist with Summer Operation of Olney Lateral 02/28/2011 09/28/2010
Functioning fences, wells and stock tanks S: 186. Maintain livestock wells/stock tanks/livestock fences/improved springs 11/30/2010 09/28/2010
Data collected and ready to be entered into the Project's databases. T: 157. Collect Field Data 02/28/2011 09/28/2010
complete 1 mile of surveys U: 157. Timber, Fish and Wildlife (TFW) surveys 02/28/2011 09/28/2010
Completed sediment inventories and database V: 157. Conduct Sediment Inventories 02/28/2011 09/28/2010
Construction of approximately 5 grade control structures W: 29. MF Dry Creek Grade Control Structures 11/30/2010 09/30/2010
Remove Culvert from Middle Fork Dry Creek X: 29. MF Dry Creek Culvert Removal 11/30/2010 09/30/2010
2 wells converted to stock wells Y: 34. Convert existing wells to stock wells 02/28/2011 09/28/2010
Construct Grade Control in Lincoln Meadow Z: 29. Lincoln Meadow-- Construct Grade Control Structures 09/28/2010 09/28/2010
Construction of Ahtanum Creek Bank stabiliztion AA: 29. Ahtanum Creek Bank Stabilization Project 02/28/2011 09/01/2010
One set of engineered plans for removal of 3-4 culverts along Panther Creek. AB: 175. Engineered Plan for Panther Creek Culverts Project 02/01/2010 02/01/2010
Replace 3 passage barrier culverts with culverts capable of passage AC: 184. Panther Creek Culvert Replacement Project 12/31/2010 09/30/2010
Construct 1 passive type irrigation fish screen AD: 69. Smartlowit Fish Screen Installation 12/31/2010 12/31/2010
Construct one bank stabilization project on Ahtanum Creek AE: 29. CR 20206 Ahtanum Creek Bank Stabilization Project 09/30/2010 06/30/2010
Complete engineer plans to remove diversion structure AG: 175. CCR 21216 Durham Project 02/28/2011 02/28/2011
Complete engineered design plans for two on Reservation fish screens on Simcoe Creek AH: 175. CCR 21216 Design 2 on Reservation Fish Screens on Simcoe Creek 02/28/2011 02/28/2011
3 rotary screw traps deployed and recovered AI: 70. CCR 21216 Deploy and Recover 5ft Rotary Screw Traps 02/28/2011 03/31/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 70 Install Fish Monitoring Equipment
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 5 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 69 Install Fish Screen
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 4 instances of WE 175 Produce Design
  • 2 instances of WE 70 Install Fish Monitoring Equipment
  • 8 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 70 Install Fish Monitoring Equipment
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 119 Manage Restoration Projects 02/09/2007
C 114 Select habitat improvement actions for 2011 02/09/2007
D 160 Update Project Database 02/09/2007
E 161 Create informal summary reports and maps 02/09/2007
F 99 Conduct field and classroom education at local schools 02/09/2007
G 122 Input to various Tribal planning and policy efforts 02/09/2007
H 165 Environmental Compliance 02/09/2007
I 132 Produce Project Annual Report for FY 09 02/09/2007
J 92 Lease Range Units in the Logy Creek Watershed
K 70 Deploy and Recover 5ft Rotary Screw Traps
L 157 Snorkel Survey NF Simcoe Creek
M 157 Snorkel Survey Mid Toppenish Creek
N 157 Snorkel Survey Ahtanum Creek Diversions
O 157 Snorkel Survey Ahtanum Creek Forks index site
P 157 Snorkel Survey Dry and Logy Creek index sites
Q 186 Manage Operation of Upper and Lower WIP canals on Ahtanum Creek
R 186 Assist with Summer Operation of Olney Lateral
S 186 Maintain livestock wells/stock tanks/livestock fences/improved springs
T 157 Collect Field Data
U 157 Timber, Fish and Wildlife (TFW) surveys
V 157 Conduct Sediment Inventories
W 29 MF Dry Creek Grade Control Structures
X 29 MF Dry Creek Culvert Removal
Y 34 Convert existing wells to stock wells
Z 29 Lincoln Meadow-- Construct Grade Control Structures
AA 29 Ahtanum Creek Bank Stabilization Project 09/11/2009
AB 175 Engineered Plan for Panther Creek Culverts Project 02/09/2007
AC 184 Panther Creek Culvert Replacement Project
AD 69 Smartlowit Fish Screen Installation
AE 29 CR 20206 Ahtanum Creek Bank Stabilization Project 08/21/2009
AF 175 CR 20206 Ahtanum Creek LaSalle Project 10/01/2009
AG 175 CCR 21216 Durham Project 10/01/2009
AH 175 CCR 21216 Design 2 on Reservation Fish Screens on Simcoe Creek 10/01/2009
AI 70 CCR 21216 Deploy and Recover 5ft Rotary Screw Traps