Province | Subbasin | % |
---|---|---|
Ocean | - | 100.00% |
Previous: | Next: |
---|---|
n/a |
|
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Confirm BPA EC lead has requisite permits | A: 165. Ensure BPA EC lead has permits | 09/01/2011 | 09/01/2011 | |
Funding Package - Submit draft to COTR | B: 119. Contract Administration | 06/01/2012 | 09/29/2011 | |
Complete Cruise Report Sections | C: 157. Collect Calibrated Hydroacoustic Data and Seabird Data | 09/28/2012 | 09/07/2012 | |
Archive, process, and analyze acoustic and seabird data | D: 162. Process and Analyze Hydroacoustic Data and Seabird Data | 09/30/2012 | 09/07/2012 | |
Present Information at Conference | E: 161. Share information at Pacific Seabird Conference | 02/11/2012 | 02/11/2012 | |
Ocean projects' synthesis report | F: 141. Produce joint project synthesis report | 12/16/2011 | 12/16/2011 | |
Ocean projects' synthesis report | I: 141. Produce joint project synthesis report | 12/16/2011 | 12/16/2011 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (Oncorhynchus tshawytscha) - All Populations |
|
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened) |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Coho (O. kisutch) - Unspecified Population |
|
Sockeye (Oncorhynchus nerka) - All Populations |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Ensure BPA EC lead has permits | 09/01/2011 | ||||||
B | 119 | Contract Administration | 09/01/2011 | ||||||
C | 157 | Collect Calibrated Hydroacoustic Data and Seabird Data | 09/01/2011 | ||||||
D | 162 | Process and Analyze Hydroacoustic Data and Seabird Data | 09/01/2011 | ||||||
E | 161 | Share information at Pacific Seabird Conference | 09/01/2011 | ||||||
F | 141 | Produce joint project synthesis report | 09/01/2011 | ||||||
G | 185 | Periodic Status Reports for BPA | 09/01/2011 | ||||||
H | 132 | Contribute to Annual Plume Project Report for 9/1/11--9/30/12 | 09/01/2011 | ||||||
I | 141 | Produce joint project synthesis report | 09/01/2011 |