Province | Subbasin | % |
---|---|---|
Columbia Cascade | Okanogan | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance Requirements | A: 165. Environmental Compliance Requirements | 11/05/2012 | 11/15/2012 | |
Funding Package - Submit draft to COTR | B: 119. Develop SOW, Budget for 2013 | 03/01/2013 | 03/11/2013 | |
Coordinate annual activities with landowners, local govts., irrigation district, WDFW and UCR | C: 191. Coordinate annual activities with landowners, local govts., OID, WDFW and UCRSRB | 06/28/2013 | 06/28/2013 | |
Coordination with National Marine Fisheries Service and Bureau of Reclamation | D: 161. Coordination with National Marine Fisheries Service and Bureau of Reclamation | 05/31/2013 | 05/31/2013 | |
Evaluation of fish passage conditions during controlled releases. | E: 115. Evaluate fish passage conditions during controlled releases. | 06/15/2013 | 06/15/2013 | |
Low flow channel evaluation and potential modification | F: 30. Low flow channel evaluation for potential modification | 06/28/2013 | 06/28/2013 | |
Construction oversight provided to construction contractor | H: 100. Provide construction oversight for reconstruction of low flow channel / bank stabilization project | 11/26/2012 | 12/20/2012 | |
Conduct bathymetrical survey | I: 115. Bathymetry survey of Conconully Reservoir | 01/14/2013 | 11/16/2012 | |
Attach Progress Report in Pisces | K: 132. Submit Progress(Annual) Report for the period (8/1/2011) to (7/31/2012) | 06/28/2013 | 06/28/2013 | |
Complete a low flow channel downstream of the OID diversion dam | L: 186. Re-construct a low flow channel in the lower reach of the Salmon Creek | 12/31/2012 | 12/20/2012 |
Primary Focal Species | Work Statement Elements |
---|---|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Environmental Compliance Requirements | 08/01/2012 | ||||||
B | 119 | Develop SOW, Budget for 2013 | 08/01/2012 | ||||||
C | 191 | Coordinate annual activities with landowners, local govts., OID, WDFW and UCRSRB | 08/01/2012 | ||||||
D | 161 | Coordination with National Marine Fisheries Service and Bureau of Reclamation | 08/01/2012 | ||||||
E | 115 | Evaluate fish passage conditions during controlled releases. | 08/01/2012 | ||||||
F | 30 | Low flow channel evaluation for potential modification | |||||||
G | 29 | Implement design to stabilize stream bank and create off-channel rearing habitat | |||||||
H | 100 | Provide construction oversight for reconstruction of low flow channel / bank stabilization project | 08/01/2012 | ||||||
I | 115 | Bathymetry survey of Conconully Reservoir | 08/01/2012 | ||||||
J | 185 | Periodic Status Reports for BPA | 08/01/2012 | ||||||
K | 132 | Submit Progress(Annual) Report for the period (8/1/2011) to (7/31/2012) | 08/01/2012 | ||||||
L | 186 | Re-construct a low flow channel in the lower reach of the Salmon Creek |