Funding Package - Submit draft to COTR |
A: 119. Manage and Administer Project |
|
10/31/2012 |
10/24/2012 |
Provide EC documentation |
B: 165. Provide EC documentation |
|
09/30/2012 |
09/30/2012 |
Realigning or creating new channel segment in Bohannon Creek |
C: 30. Bohannon: Realign and/or Create new channel in Bohannon Creek |
|
12/31/2012 |
12/14/2012 |
Increased habitat complexity in Bohannon Creek |
D: 29. Bohannon: add structures to increase habitat complexity |
|
12/31/2012 |
12/14/2012 |
Revegetate all disturbed areas both riparian and upland. |
E: 47. Bohannon: Replant disturbed area and new channels with native Riparian vegetation |
|
12/31/2012 |
|
Diversion consolidation and removal. |
F: 84. Bohannon: Diversion removal and consolidation and construction of new diversion |
|
12/31/2012 |
12/31/2012 |
Bohannon Creek fish passage structure |
G: 184. Bohannon: Fish Passage at new Bohannon Creek Diversion |
|
12/31/2012 |
12/31/2012 |
New side channel on Lemhi River |
H: 30. Lemhi River sc: create new side channel |
|
12/31/2012 |
|
Increased habitat complexity in the Lemhi River side channel |
I: 29. Lemhi River sc: add structures to increase habitat complexity |
|
12/31/2012 |
|
completed riparian fence |
J: 40. Lemhi River sc: Install fence along new side channel |
|
12/31/2012 |
|
Revegetate all disturbed areas both riparian and upland |
K: 47. Lemhi River sc: revegetate disturbed areas with native vegetation |
|
12/31/2012 |
|
Number of acres treated |
L: 197. Lemhi river sc: control invasive plant species |
|
12/31/2012 |
|
The completion of the specified channel work. |
M: 30. LSC channel: reconstruct channelized reach of Lower Little springs Creek |
|
12/31/2012 |
09/01/2012 |
Increased habitat complexity in the new Lower Little Springs Creek channel |
N: 29. LSC Channel: add structures to increase habitat complexity |
|
12/31/2012 |
10/01/2012 |
Revegetate all disturbed areas both riparian and upland |
O: 47. LSC Channel: revegetate disturbed areas with native vegetation |
|
12/31/2012 |
11/30/2012 |
Number of acres treated |
P: 197. LSC Channel: control invasive plant species |
|
12/31/2012 |
12/31/2012 |
completed fence along new channel |
Q: 40. LSC Channel: Move existing fence, install additional fence |
|
12/31/2012 |
10/05/2012 |
Fulfill all administrative tasks with quality products and in a timely manner. |
R: 119. Canyon Creek: Manage and Administer Project |
|
12/31/2012 |
12/31/2012 |
Culvert removal and bridge installation |
S: 184. Canyon Creek: Remove culvert and install bridge |
|
12/15/2012 |
12/07/2012 |
Install pivot sprinkler irrigation system |
T: 150. L-50: Install pivot sprinkler irrigation sysyem |
|
12/31/2012 |
12/11/2012 |
Install pipeline from L-46a pump station to supply irrigation water to center pivot |
U: 149. L-50: Install irrigation pipeline |
|
12/31/2012 |
12/11/2012 |
Hawley Creek Private: Obtain pre-engineered modular steel bridge. |
V: 184. Hawley Creek Private: Remove culvert and install bridge |
|
12/31/2012 |
12/20/2012 |
Hawley Creek BLM: Obtain pre-engineered modular steel bridge |
W: 184. Hawley Creek BLM: Remove culvert and install bridge |
|
12/31/2012 |
12/19/2012 |
Fourth of July Creek Private: Obtain pre-engineered modular steel bridge. |
X: 184. Fourth of July Creek Private: Remove culvert and install bridge |
|
12/31/2012 |
11/09/2012 |
Fourth of July Creek County: Obtain pre-engineered modular steel bridge. |
Y: 184. Fourth of July Creek County: Remove culvert and install bridge |
|
12/31/2012 |
10/24/2012 |
Agency Creek: Obtain pre-engineered modular steel bridge. |
Z: 184. Agency Creek County Road: Remove culvert and install bridge |
|
12/31/2012 |
11/20/2012 |
Install 6,425 feet of pipeline |
AA: 149. Big 8 Lee Creek: Install Pipeline |
|
12/31/2012 |
12/31/2012 |
Install a 5 tower pivot sprinkler irrigation system |
AB: 150. Big 8 Lee Creek: Install Sprinkler System |
|
12/31/2012 |
12/31/2012 |
Consolidate diversions |
AC: 84. Big 8 Lee Creek - Remove Diversions |
|
12/31/2012 |
12/31/2012 |
Big 8-Lee Creek: Revegetate as needed |
AD: 47. Big 8 Lee Creek: Plant Vegetation |
|
12/31/2012 |
|
Attach Progress Report in Pisces |
AE: 132. Submit Progress Report for the period (8/15/12) to (12/31/12) |
|
12/24/2012 |
|