Province | Subbasin | % |
---|---|---|
Columbia Plateau | Umatilla | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Julie Burke | Umatilla Confederated Tribes (CTUIR) | Yes | Administrative Contact | julieburke@ctuir.org | (541) 429-7292 |
Richard Christian | Umatilla Confederated Tribes (CTUIR) | Yes | Contract Manager | richardchristian@ctuir.org | (541) 429-7283 |
Katey Grange | Bonneville Power Administration | Yes | Env. Compliance Lead | kcgrange@bpa.gov | (503) 230-4047 |
Brenda Heister | Bonneville Power Administration | Yes | Contracting Officer | bsheister@bpa.gov | (503) 230-3531 |
Gary James | Umatilla Confederated Tribes (CTUIR) | No | Supervisor | garyjames@ctuir.org | (541) 429-7285 |
Michael Lambert | Umatilla Confederated Tribes (CTUIR) | Yes | Contract Manager | mikelambert@ctuir.org | (541) 429-7240 |
Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
Scott O'Daniel | Umatilla Confederated Tribes (CTUIR) | Yes | Technical Contact | scottodaniel@ctuir.org | (541) 429-7452 |
Tracey Yerxa | Bonneville Power Administration | Yes | COR | tyerxa@bpa.gov | (503) 230-4738 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Upload SOW, budget, property inventory for upcoming contract period to Pisces. | B: 119. Manage and Administer Project | 10/01/2014 | 10/01/2014 | |
Receipt of environmental compliance clearance on project work elements from BPA | C: 165. Produce Environmental Compliance Documentation | 01/31/2015 | 12/31/2014 | |
Attach Meacham Creek Floodplain Restoration and In-Stream Enhancement Project Completion Report | D: 141. Meacham Creek Phase I-II Project RM 6-8.5 Completion Report | 12/31/2014 | 12/31/2014 | |
Complete and Attach Birch Creek Geomorphic Assessment and Action Plan to Pisces. | E: 115. Birch Creek Assessment and Action Plan | 01/31/2015 | 12/31/2014 | |
List of final projects | F: 114. CTUIR Umatilla Subbasin Restoration Coordination | 01/31/2015 | 12/31/2014 | |
Provide technical input and summaries to enhance or protect natural resources in the subbasin. | G: 122. Review and provide technical input on issues and topics that affect the areas natural resource | 01/31/2015 | 12/31/2014 | |
Coordinate watershed association activities | H: 191. Umatilla River Watershed coordination duties | 01/31/2015 | 12/31/2014 | |
Complete outreach and education activities | I: 99. Public Outreach and Education | 01/31/2015 | 12/31/2014 | |
Maintain proper operation of instream habitat structures | J: 186. Inspect and maintain function of instream improvement structures | 01/31/2015 | 12/31/2014 | |
Maintenance of land or structures associated with conservation easements | K: 186. Maintenance of habitat features associated with project conservation easements | 01/31/2015 | 12/31/2014 | |
Maximize survival of native vegetation in enhancement project areas. | L: 198. Enhance native vegetation by noxious weed control within Umatilla River Subbasin project areas | 01/31/2015 | 12/31/2014 | |
Complete scheduled tree and shrub plantings in project areas | M: 47. Supplement riparian areas of existing and new projects with additional vegetation | 12/15/2014 | 12/15/2014 | |
Complete scheduled tree and shrub plantings in project areas | N: 47. Meacham Creek Floodplain Restoration and In-stream Enhancement, RM's 6-8.5 Phase II Planting Plan | 12/31/2014 | 12/31/2013 | |
Water efficient irrigation pump and pipeline system installed; intermittent step to dam removal | O: 84. Garton Irrigation Efficiency: Garton Barrier and Channel Modification Project | 06/30/2014 | 06/30/2014 | |
Incorporate project effectiveness and regional data into project activities and annual BPA rep | P: 115. Field Data Collection | 01/31/2015 | 12/31/2014 | |
A summary report with data analysis and findings will be incorporated into the annual report. | Q: 157. Geomorphic-Hyporheic Flow Study on Meacham Creek | 01/31/2015 | 12/31/2014 | |
Written summary report describing the 2013 findings compared to previous work. | R: 157. Macroinvertebrate study for evaluating Meacham Creek restoration effectiveness | 01/31/2015 | 12/31/2014 | |
Samples analyzed at lab and data uploaded to CTUIR water quality data base | S: 157. Meacham Creek Water Quality ISCO Sampling and Lab Analysis | 01/31/2015 | 12/31/2014 | |
USGS posted real-time accurate instantaneous stream flow data | T: 157. Meacham Flow/Hydrology Monitoring (USGS) | 01/31/2015 | 12/31/2014 | |
Upload project effectiveness photo point photos to CTUIR data depository. | U: 157. Project Effectiveness Photo Point Monitoring | 01/31/2015 | 12/31/2014 | |
Attach Progress Report in Pisces | V: 132. Produce Annual Progress Report for the FY12 period (Feb2012-Dec2012), transition to CY reporting | 09/30/2014 | 09/08/2014 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/01/2014 | ||||||
B | 119 | Manage and Administer Project | 02/01/2014 | ||||||
C | 165 | Produce Environmental Compliance Documentation | 02/01/2014 | ||||||
D | 141 | Meacham Creek Phase I-II Project RM 6-8.5 Completion Report | 02/01/2014 | ||||||
E | 115 | Birch Creek Assessment and Action Plan | 02/01/2014 | ||||||
F | 114 | CTUIR Umatilla Subbasin Restoration Coordination | 02/01/2014 | ||||||
G | 122 | Review and provide technical input on issues and topics that affect the areas natural resource | 02/01/2014 | ||||||
H | 191 | Umatilla River Watershed coordination duties | 02/01/2014 | ||||||
I | 99 | Public Outreach and Education | 02/01/2014 | ||||||
J | 186 | Inspect and maintain function of instream improvement structures | 12/13/2013 | ||||||
K | 186 | Maintenance of habitat features associated with project conservation easements | 12/13/2013 | ||||||
L | 198 | Enhance native vegetation by noxious weed control within Umatilla River Subbasin project areas | 02/01/2014 | ||||||
M | 47 | Supplement riparian areas of existing and new projects with additional vegetation | 12/13/2013 | ||||||
N | 47 | Meacham Creek Floodplain Restoration and In-stream Enhancement, RM's 6-8.5 Phase II Planting Plan | 02/01/2014 | ||||||
O | 84 | Garton Irrigation Efficiency: Garton Barrier and Channel Modification Project | 02/01/2014 | ||||||
P | 115 | Field Data Collection | 12/13/2013 | ||||||
Q | 157 | Geomorphic-Hyporheic Flow Study on Meacham Creek | 12/13/2013 | ||||||
R | 157 | Macroinvertebrate study for evaluating Meacham Creek restoration effectiveness | 12/13/2013 | ||||||
S | 157 | Meacham Creek Water Quality ISCO Sampling and Lab Analysis | 12/13/2013 | ||||||
T | 157 | Meacham Flow/Hydrology Monitoring (USGS) | 12/13/2013 | ||||||
U | 157 | Project Effectiveness Photo Point Monitoring | 12/13/2013 | ||||||
V | 132 | Produce Annual Progress Report for the FY12 period (Feb2012-Dec2012), transition to CY reporting | 02/01/2014 | ||||||
W | 132 | Begin drafting Progress Report for Jan 2013 to Dec 2014 | 02/01/2014 |