Provide EC documentation |
A: 165. Provide EC documentation |
|
12/31/2015 |
12/31/2015 |
Draft documents for LMBM support |
B: 174. CCI: Lemhi River Basin Model Development Support: Produce Plan |
|
12/31/2015 |
12/31/2015 |
Provide technical review |
C: 122. CCI: Lemhi River Basin Model Development Support: Provide Technical Review |
|
12/31/2015 |
03/31/2015 |
Provide support to IDWR |
D: 174. CH2M Hill: USB Ground Water-Surface Water Interactions Study P 2 Support: Produce Plan |
|
12/31/2015 |
12/31/2015 |
Provide support to IDWR |
E: 122. CH2M Hill: USB Ground Water-Surface Water Interactions Study P 2 Support: Provide Technical Review |
|
12/31/2015 |
12/31/2015 |
Final engineering designs for Agency Creek county road culvert removal |
F: 175. LSWCD: Agency Creek County Road Culvert Removal Engineering Services |
|
12/30/2015 |
11/27/2015 |
Purchase and install a prefabricated modular bridge |
G: 184. LSWCD: Pratt Creek Culvert Replacement |
|
12/30/2015 |
10/30/2015 |
Purchase a pre-engineered modular steel bridge for Lower Bohannon Creek. |
H: 184. LSWCD: Lower Bohannon Creek Private Culvert Replacement Project |
|
11/30/2015 |
10/19/2015 |
Purchase a pre-engineered modular steel bridge for Eighteenmile Creek. |
I: 184. LSWCD: Eighteenmile Creek Railroad Grade Culvert to Bridge Replacement Project |
|
11/30/2015 |
09/11/2015 |
Purchase a hydroseeder for use in revegetation |
J: 47. LSWCD: Upper Hawley Creek Water Rights Point of Use Transfer |
|
12/31/2015 |
04/21/2015 |
Relocate the POD downstream and install a pump and sprinkler irrigation system |
K: 203. LSWCD: Hawley-Eighteenmile Creeks Intercept Irrigation |
|
11/30/2015 |
11/30/2015 |
Treat project sites for noxious weeds. |
L: 199. LSWCD: Noxious weed treatments |
|
11/30/2015 |
11/10/2015 |
Purchase a pump and electrical wire for SCC-03 |
M: 203. LSWCD: Carmen Creek SCC3 Flow Enhancement Project |
|
05/31/2015 |
06/05/2015 |
Develop a project plan for the Big Timber Project |
N: 114. LRLT: Big Timber Planning and Development |
|
12/31/2015 |
12/30/2015 |
Lemhi River Project Identification and Development |
O: 114. IDFG: Identify and develop new projects |
|
12/31/2015 |
12/31/2015 |
Final Design for Bohannon Creek Diversion #3 |
P: 175. IDFG: Bohannon Creek #3 diversion |
|
12/31/2015 |
|
Preliminary design of the new Highway 29 crossing over Eighteenmile Creek/Hawley Creek |
Q: 175. IDFG: Highway 29 Culvert Replacement |
|
12/31/2015 |
12/31/2015 |
Design of the Lower Lemhi Stokes Project |
R: 175. IDFG: Stokes Lower Lemhi River Project |
|
12/31/2015 |
12/01/2015 |
Hayden Creek Side Channel Design |
S: 175. IDFG: Hayden Creek Side Channel |
|
12/31/2015 |
|
Upper Bohannon Creek Bridge Final Design |
T: 175. IDFG: Bohannon Creek Upper Culvert Replacement |
|
12/31/2015 |
07/31/2015 |
Bohannon Creek Bridge Installed |
U: 184. IDFG: Upper Bohannon Creek Culvert Replacement |
|
12/15/2015 |
11/30/2015 |
Lower Lemhi River Restoration Project, Reach 1 Final Design |
V: 175. IDFG: Lower Lemhi, Eagle Valley Ranch |
|
12/31/2015 |
08/31/2015 |
Revegetate all disturbed areas both riparian and upland as needed |
W: 47. IDFG: Amonson Upper Lemhi sc: revegetate disturbed areas with native vegetation |
|
12/31/2015 |
07/03/2015 |
Revegetate all disturbed areas both riparian and upland as needed |
X: 47. IDFG: Snyder project - revegetate disturbed areas with native vegetation |
|
12/31/2015 |
08/18/2015 |
Revegetate all disturbed areas both riparian and upland as needed |
Y: 47. IDFG: Little Springs Creek project - revegetate disturbed areas with native vegetation |
|
12/31/2015 |
08/19/2015 |
Final engineering designs |
Z: 175. Design & Engineering for Muleshoe & L16/L17 Projects |
|
12/31/2015 |
07/17/2015 |
Develop a project plan for the Muleshoe and L16/L17 projects |
AA: 174. TU: Project planning for Muleshoe & L16/L17 Projects |
|
12/31/2015 |
07/17/2015 |
All administrative tasks fulfilled with timely quality products |
AB: 119. Manage and Administer Project |
|
12/31/2015 |
12/31/2015 |
Attach progress report in Pisces. |
AC: 132. Submit Progress Report for the period (1/1/14) to (12/31/14) |
|
04/22/2015 |
04/22/2015 |
Lower Lemhi Restoration Subreach 2 Jack Fence |
AE: 40. IDFG: Lower Lemhi Restoration - SubR-2: Install Jack Fence |
|
11/30/2015 |
11/30/2015 |
Completed channel construction |
AF: 30. IDFG: Lower Lemhi Restoration - SubR-2 Construct side channel |
|
10/31/2015 |
10/31/2015 |
Increased instream complexity and bank stability |
AG: 29. IDFG: Lower Lemhi Restoration - SubR-2 install log jams, rootwads, and individual logs |
|
10/31/2015 |
10/31/2015 |
Construction Management Complete |
AH: 100. IDFG: Lower Lemhi Restoration - Construction oversight/management subreach 2 |
|
11/30/2015 |
11/30/2015 |
Preliminary Designs for Subreaches 1 and 3 |
AI: 175. IDFG: Lower Lemhi Restoration - assist with preliminary designs for subreaches 1 and 3 |
|
12/31/2015 |
|
Field work conducted |
AJ: 174. LRLT: Tyler Bank and Riparian Evaluation Study |
|
12/31/2015 |
11/06/2015 |
Purchase pipeline and pivot |
AK: 203. Lemhi SWCD: Hawley Creek Access & Flow Enhancement (LHaC-01) Pipeline & Sprinkler Purchase |
|
12/31/2015 |
12/31/2015 |
Purchase pipeline and pivot |
AL: 203. Lemhi SWCD: Canyon Creek Access & Flow Enhancement (CC-03) Pipeline & Sprinkler Purchase |
|
12/31/2015 |
12/31/2015 |
Purchase pipeline |
AM: 203. Lemhi SWCD: Hawley Creek Access & Flow Enhancement (LHaC-02) Pipeline Purchase |
|
12/31/2015 |
12/31/2015 |
Purchase sprinkler system |
AN: 203. Lemhi SWCD: Pratt Creek Access & Flow Enhancement (Mulkey) Sprinkler System Purchase |
|
12/31/2015 |
12/31/2015 |
Purchase a pre-engineered modular steel bridge for the Agency Creek county road. |
AO: 184. Lemhi SWCD: Agency Creek Culvert Replacement Access Project: County Road Bridge Purchase |
|
12/31/2015 |
12/31/2015 |
Data analysis - in progress |
AP: 162. RMRS: Lemhi Hydrologic Modeling Using LiDAR Data |
|
12/31/2015 |
12/31/2015 |