Province | Subbasin | % |
---|---|---|
Columbia Plateau | Walla Walla | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Dec-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Jonathan Goodman | Bonneville Power Administration | Yes | Env. Compliance Lead | jdgoodman@bpa.gov | (503) 230-4764 |
Wendy Harris | Walla Walla Basin Watershed Council | Yes | Contract Manager | wendy.harris@wwbwc.org | (541) 938-2170 |
Douglas Knapp | Bonneville Power Administration | No | Technical Contact | ddknapp@bpa.gov | (503) 230-3285 |
Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
Amber MacLachlan | Bonneville Power Administration | Yes | Contracting Officer | almcmahon@bpa.gov | (503) 230-3983 |
Brian Wolcott | Walla Walla Basin Watershed Council | No | Supervisor | brian.wolcott@wwbwc.org | (541) 938-2170 |
Tracey Yerxa | Bonneville Power Administration | Yes | COR | tyerxa@bpa.gov | (503) 230-4738 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All administrative tasks fulfilled with timely quality products | A: 119. Admin oversight for Exp Activities | 10/31/2016 | 10/31/2016 | |
Environmental Compliance complete | B: 165. Environmental Compliance Documentation for all Exp actions | 10/31/2016 | 10/31/2016 | |
Surface Water Data collected for recharge projects and water monitoring | C: 157. Collect Surface Water Data for Recharge project and Water monitoring | 10/31/2016 | 10/31/2016 | |
Groundwater Data collected for recharge projects and water monitoring | D: 157. Collect Groundwater Data for Recharge project and Water monitoring | 10/31/2016 | 10/31/2016 | |
Produce accessible, error-checked datasets | E: 157. Collect Water Temperature Data for Recharge project and Water monitoring | 10/31/2016 | 10/31/2016 | |
Updated WWBWC Database | F: 160. Maintain Surface Water Database for Recharge project and Water monitoring | 10/31/2016 | 10/31/2016 | |
Maintain Groundwater Database | G: 160. Maintain Groundwater Database for Recharge project and Water monitoring | 10/31/2016 | 10/31/2016 | |
Maintain water temperature database | H: 160. Maintain Water Temperature Database for Recharge project and Water monitoring | 10/31/2016 | 10/31/2016 | |
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management | I: 162. Analyze Surface Water Data for Recharge Project | 10/31/2016 | 10/31/2016 | |
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management | J: 162. Analyze Groundwater Data for Recharge Project | 10/31/2016 | 10/31/2016 | |
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management | K: 162. Analyze Water Temperature Data for Recharge Project | 10/31/2016 | 10/31/2016 | |
Education and Outreach | L: 99. Irrigation Efficiency and Aquifer Recharge project | 10/31/2016 | 10/31/2016 | |
Flow meters installed | N: 148. Fruitvale Water Users Association Water Management Flow Meters - Phase 4 | 10/31/2016 | 10/31/2016 | |
Walla Walla River Diversion Telemetry Installed | O: 148. Walla Walla River Diversion Flow Telemetry | 10/31/2016 | 10/31/2016 | |
White Ditch Phase 1 Seepage Assessment Data Collected | P: 115. White Ditch Phase 1 Seepage Analysis | 10/31/2016 | 10/31/2016 | |
County Road Aquifer Recharge Designs | Q: 175. County Road Aquifer Recharge Design | 10/31/2016 | 10/31/2016 | |
Gallagher Aquifer Recharge Designs | R: 175. Gallagher Aquifer Recharge Design | 10/31/2016 | 10/31/2016 | |
Triangle Station Aquifer Recharge Designs | S: 175. Triangle Station Aquifer Recharge Design | 10/31/2016 | 10/31/2016 | |
Triangle Road Aquifer Recharge Designs | T: 175. Triangle Road Aquifer Recharge Design | 10/31/2016 | 10/31/2016 | |
Locust Road Sprinkler System Installed | U: 203. Locust Road Sprinkler Project | 10/31/2016 | 10/31/2016 | |
Construct recharge site | V: 205. Locust Road Dual Purpose Bulge | 10/31/2016 | 10/31/2016 | |
White Ditch Phase 1 Section 3 piped | W: 203. White Ditch Piping Project Phase 1, Section 3 | 10/31/2016 | 10/31/2016 | |
WWRID Water Right Legal Notices Complete | X: 154. In-stream Water Right Transactions for LWW | 10/31/2016 | 10/07/2016 | |
Youth and Adult Presentations | Y: 99. Youth and adult presentations | 08/31/2016 | 08/31/2016 | |
Pre-Acquisition Activities Completed | AA: 172. Johnson Cherry Orchard Acquisition | 10/31/2016 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Admin oversight for Exp Activities | 11/01/2015 | ||||||
B | 165 | Environmental Compliance Documentation for all Exp actions | 11/01/2015 | ||||||
C | 157 | Collect Surface Water Data for Recharge project and Water monitoring | 11/01/2015 | ||||||
D | 157 | Collect Groundwater Data for Recharge project and Water monitoring | 11/01/2015 | ||||||
E | 157 | Collect Water Temperature Data for Recharge project and Water monitoring | 11/01/2015 | ||||||
F | 160 | Maintain Surface Water Database for Recharge project and Water monitoring | 11/01/2015 | ||||||
G | 160 | Maintain Groundwater Database for Recharge project and Water monitoring | 11/01/2015 | ||||||
H | 160 | Maintain Water Temperature Database for Recharge project and Water monitoring | 11/01/2015 | ||||||
I | 162 | Analyze Surface Water Data for Recharge Project | 11/01/2015 | ||||||
J | 162 | Analyze Groundwater Data for Recharge Project | 11/01/2015 | ||||||
K | 162 | Analyze Water Temperature Data for Recharge Project | 11/01/2015 | ||||||
L | 99 | Irrigation Efficiency and Aquifer Recharge project | 11/01/2015 | ||||||
M | 132 | Annual Progress Report (11-1-14 to 10-31-15) | 11/01/2015 | ||||||
N | 148 | Fruitvale Water Users Association Water Management Flow Meters - Phase 4 | 03/21/2016 | ||||||
O | 148 | Walla Walla River Diversion Flow Telemetry | 11/01/2015 | ||||||
P | 115 | White Ditch Phase 1 Seepage Analysis | 11/01/2015 | ||||||
Q | 175 | County Road Aquifer Recharge Design | 11/01/2015 | ||||||
R | 175 | Gallagher Aquifer Recharge Design | 11/01/2015 | ||||||
S | 175 | Triangle Station Aquifer Recharge Design | 11/01/2015 | ||||||
T | 175 | Triangle Road Aquifer Recharge Design | 11/01/2015 | ||||||
U | 203 | Locust Road Sprinkler Project | 03/21/2016 | ||||||
V | 205 | Locust Road Dual Purpose Bulge | 03/21/2016 | ||||||
W | 203 | White Ditch Piping Project Phase 1, Section 3 | 11/01/2015 | ||||||
X | 154 | In-stream Water Right Transactions for LWW | 11/01/2015 | ||||||
Y | 99 | Youth and adult presentations | 11/01/2015 | ||||||
Z | 185 | Periodic Status Reports for BPA | 11/01/2015 | ||||||
AA | 172 | Johnson Cherry Orchard Acquisition | 11/01/2015 |