SOW Report
Contract 74017 REL 65: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RIVER WATERSHED
Project Number:
Title:
Lower South Fork Clearwater/Slate Creek Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
74017 REL 65
Contract Title:
2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RIVER WATERSHED
Contract Continuation:
Previous: Next:
74017 REL 43: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RIVER WATERSHED
  • 74017 REL 81: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RIVER WATERSHED
Contract Status:
Closed
Contract Description:
Contract History:

This project is implemented as part of the Nez Perce-Clearwater National Forests (NPCNF)/Nez Perce Tribe (NPT) restoration partnership.  This project represents a merger of two ongoing Bonneville Power Administration (BPA) and NPT restoration projects, Slate Creek Watershed Restoration (2007-064-00)  and Lower South Fork Clearwater Restoration (2010-003-00).  The restoration partnership has been ongoing in the basin since 1996 and this project unification greatly increases the geographic area covered, and enhances the administrative and financial efficiency in order to maximize the direct benefit to fish and wildlife.

The goal of the project is to restore the physical and biological characteristics of the watershed to provide quality habitat for anadromous and resident fish species that support the historical, cultural, and economic practices of the Nez Perce Tribe.  The South Fork Clearwater River/Slate Creek watersheds contain designated critical habitat for Snake River steelhead trout, bull trout, and has moderate habitat potential for Spring Chinook salmon.  Restoration follows a ridge top to ridge top approach with implementation focused on restoring riparian processes by addressing increased water temperatures, increased sedimentation, cattle grazing effects, aquatic habitat connectivity, and exotic, invasive plants.  Historically, the cost share for this project has been contributed by the NPCNF who provides at least a 20% match including cash and in-kind contributions for environmental compliance, contract preparation, administration, and technical oversight.  In recent years, the BLM, ITD, and Idaho County have been and will also be submitting cost share contributions during FY 20.

FY 20 implementation includes 1 culvert replacement (to improve fish passage and hydrologic capacity, reduce potential sediment delivery and provide connectivity),  1 barrier culvert replacement design (to replace a failed culvert in the future that serves as a fish barrier and sediment source with limited hydrologic capacity), fence maintenance (to protect riparian plants), and continued planning and coordination for next year's projects and out-year habitat improvements.  Pit tag arrays will be installed to monitor fish passage at a suspected velocity barrier site in the South Fork Clearwater River in preparation for a potential velocity barrier removal project in partnership with the USFS in out years.  NPT Watershed personnel will also continue an inventory of stream crossings throughout the Lower South Fork Clearwater River watershed in order to identify and prioritize fish passage barriers and associated risks to aquatic species.  
Account Type(s):
Expense
Contract Start Date:
02/01/2020
Contract End Date:
01/31/2021
Current Contract Value:
$701,076
Expenditures:
$701,076

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Marcie Carter Nez Perce Tribe Yes Supervisor marciec@nezperce.org (208) 621-3534
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Miranda Gordon Nez Perce Tribe Yes Contract Manager mirandag@nezperce.org (208) 621-3547
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Emmit Taylor, Jr. Nez Perce Tribe No Supervisor emmitt@nezperce.org (208) 621-3544
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance documentation submitted to BPA A: 165. Provide environmental compliance information to BPA for projects 01/31/2021 01/27/2021
Manage Projects and Administrative duties B: 119. Management, Coordination, and Communication 01/31/2021 01/27/2021
Culvert Replaced C: 184. Replace Whiskey Creek Culvert 11/30/2020 11/02/2020
Riparian Vegetation Planted F: 47. Plant Riparian Vegetation - Previous Restoration Projects 11/30/2020 10/28/2020
Exclosure Fence Maintained G: 186. Maintain Exclosure Fences - Mill Creek 07/31/2020 07/15/2020
Exclosure fence maintained H: 186. Maintain Exclosure Fences - McComas Meadows 07/31/2020 06/30/2020
Potential Passage Barrier Inventory I: 115. Assess and Inventory Potential Passage Barriers 01/30/2021 01/27/2021
Review proposed projects, including field data, photos, maps, and plans. J: 122. Review of Proposed Partner Actions 01/31/2021 01/27/2021
Upload 2020 Annual Report to Pisces L: 132. 2020 Annual Report - 2/1/2020 - 1/31/2021 01/31/2021 01/27/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 70 Install Fish Monitoring Equipment

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide environmental compliance information to BPA for projects
B 119 Management, Coordination, and Communication
C 184 Replace Whiskey Creek Culvert 12/09/2019
D 175 Sally Ann Culvert #3 Replacement Design 12/09/2019
E 70 Installation of pit tag arrays in the South Fork Clearwater River 07/07/2020
F 47 Plant Riparian Vegetation - Previous Restoration Projects 12/09/2019
G 186 Maintain Exclosure Fences - Mill Creek 07/07/2020
H 186 Maintain Exclosure Fences - McComas Meadows 07/07/2020
I 115 Assess and Inventory Potential Passage Barriers 12/09/2019
J 122 Review of Proposed Partner Actions
K 185 Periodic Status Reports for BPA
L 132 2020 Annual Report - 2/1/2020 - 1/31/2021
M 132 Finalize 2019 Annual Report - 2/1/2019 - 1/31/2020