Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74314 REL 22: 2003-017-00 EXP QRF WINTER HABITAT - WDFW
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
74314 REL 22
Contract Title:
2003-017-00 EXP QRF WINTER HABITAT - WDFW
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
Off-site mitigation for the juvenile and adult mortality associated with the operation of the Federal Columbia River Power System (FCRPS) includes the restoration of tributary habitat. The primary assumption of this approach is that improvements in tributary habitat will result in greater survival/production of juvenile emigrants and survival of adult migrants.  Problematically, the relationship between freshwater productivity and tributary habitat conditions has been elusive. The integrated Status and Effectiveness Monitoring Project (ISEMP; BPA Project Number 20013-017-00) developed and validated a Quantile Random Forest (QRF) model that estimates the total capacity of Chinook Salmon (Oncorhynchus tshawytscha) summer parr (e.g., total number of Chinook parr that can be supported by available habitat) using habitat metrics generated by the Columbia Habitat Monitoring Program (CHaMP; BPA Project Number 2011-006-00). These estimates can be generated at the site-scale, tributary-scale, or watershed-scale in watersheds sampled by CHaMP. Moreover, using model-assisted regression informed by globally-available attributes, these estimates can be generated throughout the interior Columbia River Basin (CRB), with the possible exception of the Clearwater River Subbasin, which is not well represented by CHaMP data. Using CHaMP data and funding provided by the Bureau of Reclamation "Upper-Salmon Integrated Rehabilitation Assessment" and collaboration with the Oregon Department of Fish and Wildlife (ODFW) and Washington Department of Fish and Wildlife (WDFW), redd capacity QRF models were developed for Chinook salmon and steelhead/rainbow trout (O. mykiss); likewise summer capacity models were extended to steelhead summer parr capacity estimates.

This contract supports data collection and analysis to generate QRF winter capacity estimates for Chinook salmon and steelhead. Combined with existing redd and summer QRF capacity estimates, a simple deterministic model of survival from across these life-stages will enable tributary habitat restoration efforts to more explicitly target habitat deficiencies, and provide guidance on the amount/types/locations of tributary habitat restoration actions necessary to most efficiently achieve de-listing and recovery goals in a standardized and quantitative fashion throughout the interior Columbia River Basin.

This contract funds the Washington Department of Fish and Wildlife to conduct snorkel surveys at up to 50 sites previously surveyed by CHaMP within any/all of the following watersheds: Asotin, Entiat, Methow, and Wenatchee. The density of juvenile Chinook Salmon and rainbow trout/steelhead will be estimated using the "Protocol for Snorkel Surveys of Fish Densities v1.0 (https://www.monitoringresources.org/). Densities will be expanded to estimate total juvenile abundance at each CHaMP site using depletion or mark-recapture methods described in the protocol "ISEMP Field Manual of Scientific Protocols for Capture, handling, and Tagging of Wild Salmonid" (https://www.monitoringresources.org/).

Survey data from this effort, similar efforts conducted by the ODFW in the Grande Ronde River watershed, and Quantitative Consultants, Inc. in the Lemhi River and Secesh River watersheds will be combined to develop a Chinook salmon and steelhead/rainbow trout winter habitat capacity QRF model utilizing the "ISEMP Data Analyst Protocol" (https://www.monitoringresources.org).
Account Type(s):
Expense
Contract Start Date:
11/01/2017
Contract End Date:
06/30/2018
Current Contract Value:
$147,167
Expenditures:
$147,167

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mike Ackerman Biomark, LLC. No Technical Contact mike.ackerman@merck.com (208) 469-0896
Christopher Beasley Quantitative Consultants Inc Yes Technical Contact chris@qcinc.org (360) 620-2883
Jeremy Cram Washington Department of Fish and Wildlife (WDFW) Yes Contract Manager jeremy.cram@dfw.wa.gov (509) 664-3148
Luca De Stefanis Bonneville Power Administration No Env. Compliance Lead ltdestefanis@bpa.gov (503) 230-5263
Richard Golden Jr Bonneville Power Administration Yes COR rlgolden@bpa.gov (503) 230-5119
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Kristen Jule Bonneville Power Administration Yes F&W Approver krjule@bpa.gov (503) 230-3588
Rachel Kulak Bonneville Power Administration Yes Contracting Officer rakulak@bpa.gov (503) 230-5091
Andrew Murdoch Washington Department of Fish and Wildlife (WDFW) Yes Supervisor andrew.murdoch@dfw.wa.gov (509) 664-3148x15
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
James Ruzycki Oregon Department of Fish and Wildlife No Administrative Contact james.r.ruzycki@odfw.oregon.gov (541) 962-3731
Ted Sedell Oregon Department of Fish and Wildlife No Technical Contact edwin.r.sedell@odfw.oregon.gov (541) 962-3954
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Ben Truscott Washington Department of Fish and Wildlife (WDFW) Yes Technical Contact ben.truscott@dfw.wa.gov (509) 664-3148
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
EC requirements met B: 165. Environmental Compliance 11/10/2017 11/10/2017
Effective implementation management and timely contract administration C: 119. Manage and Administer Contract 06/30/2018 06/30/2018
Joint training D: 189. Joint-training. 12/01/2017 12/01/2017
Produce accessible, error-checked datasets E: 157. Conduct nighttime winter snorkel surveys. 06/30/2018 06/30/2018
Develop/validate winter Chinook Salmon and Steelhead QRF Model F: 162. Develop/validate winter Chinook Salmon and Steelhead QRF Model 06/30/2018 06/30/2018
Review final winter Quantile Random Forest model report. G: 122. Review final winter Quantile Random Forest model report. 06/30/2018 06/30/2018
Transfer BiOp reporting data to QCI I: 202. BiOp RPA Report for CY 2017 01/31/2018 01/31/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 12/01/2017
B 165 Environmental Compliance 11/01/2017
C 119 Manage and Administer Contract 11/01/2017
D 189 Joint-training. 12/01/2017
E 157 Conduct nighttime winter snorkel surveys. 11/01/2017
F 162 Develop/validate winter Chinook Salmon and Steelhead QRF Model 12/01/2017
G 122 Review final winter Quantile Random Forest model report. 12/01/2017
H 132 Submit Progress Report data to QCI for the period (11/01/2017) to (06/30/2018) 11/01/2017
I 202 BiOp RPA Report for CY 2017