A | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | A | SR | Nov-Dec 2017 (11/1/2017 - 12/31/2017) | 01/01/2018 | 01/15/2018 | Concluded | Richard Golden Jr (Inactive) | 10/03/2017 8:36 AM |
A | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | B | SR | Jan-Mar 2018 (1/1/2018 - 3/31/2018) | 04/01/2018 | 04/15/2018 | Concluded | Richard Golden Jr (Inactive) | 10/03/2017 8:36 AM |
A | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | C | SR | Final Apr-Jun 2018 (4/1/2018 - 6/30/2018) | 06/16/2018 | 06/30/2018 | Concluded | Richard Golden Jr (Inactive) | 10/05/2017 10:56 AM |
B | 165 | Produce Environmental Compliance Documentation | Environmental Compliance | Assemble, gather, acquire, or prepare documents in support of obtaining environmental compliance from BPA (such as filling out a NEPA Checklist, providing maps, obtaining permits, conducting public involvement activities, completing an archaeological survey, etc.). Ensure a compliance letter has been received, or is still valid, prior to commencing any affected work. | A | LAMP | Determine if contract work could adversely affect Pacific lamprey | 11/01/2017 | 11/07/2017 | Concluded | Richard Golden Jr (Inactive) | 10/04/2017 8:17 AM |
B | 165 | Produce Environmental Compliance Documentation | Environmental Compliance | Assemble, gather, acquire, or prepare documents in support of obtaining environmental compliance from BPA (such as filling out a NEPA Checklist, providing maps, obtaining permits, conducting public involvement activities, completing an archaeological survey, etc.). Ensure a compliance letter has been received, or is still valid, prior to commencing any affected work. | B | ESA | Report lamprey observation and catch data to USFWS by Feb. 15 | 01/01/2018 | 02/15/2018 | Concluded | Richard Golden Jr (Inactive) | 10/04/2017 8:17 AM |
B | 165 | Produce Environmental Compliance Documentation | Environmental Compliance | Assemble, gather, acquire, or prepare documents in support of obtaining environmental compliance from BPA (such as filling out a NEPA Checklist, providing maps, obtaining permits, conducting public involvement activities, completing an archaeological survey, etc.). Ensure a compliance letter has been received, or is still valid, prior to commencing any affected work. | C | ANS | Inspect water craft, waders, boots, etc. to be used in or near water for aquatic invasive species | 11/01/2017 | 06/30/2018 | Concluded | Richard Golden Jr (Inactive) | 10/04/2017 8:17 AM |
B | 165 | Produce Environmental Compliance Documentation | Environmental Compliance | Assemble, gather, acquire, or prepare documents in support of obtaining environmental compliance from BPA (such as filling out a NEPA Checklist, providing maps, obtaining permits, conducting public involvement activities, completing an archaeological survey, etc.). Ensure a compliance letter has been received, or is still valid, prior to commencing any affected work. | D | NOXIOUS | Inspect and, if necessary, wash vehicles and equipment infested with terrestrial invasive species | 11/01/2017 | 06/30/2018 | Concluded | Richard Golden Jr (Inactive) | 10/04/2017 8:17 AM |
B | 165 | Produce Environmental Compliance Documentation | Environmental Compliance | Assemble, gather, acquire, or prepare documents in support of obtaining environmental compliance from BPA (such as filling out a NEPA Checklist, providing maps, obtaining permits, conducting public involvement activities, completing an archaeological survey, etc.). Ensure a compliance letter has been received, or is still valid, prior to commencing any affected work. | E | PERMS | Obtain/Renew applicable local, state, federal and tribal environmental permits | 11/01/2017 | 06/30/2018 | Concluded | Richard Golden Jr (Inactive) | 10/04/2017 8:17 AM |
B | 165 | Produce Environmental Compliance Documentation | Environmental Compliance | Assemble, gather, acquire, or prepare documents in support of obtaining environmental compliance from BPA (such as filling out a NEPA Checklist, providing maps, obtaining permits, conducting public involvement activities, completing an archaeological survey, etc.). Ensure a compliance letter has been received, or is still valid, prior to commencing any affected work. | F | DELIV | EC requirements met | | 11/10/2017 | Concluded | Richard Golden Jr (Inactive) | 10/05/2017 10:57 AM |
C | 119 | Manage and Administer Projects | Manage and Administer Contract | Provide effective implementation and administration: a) evaluate current workload and monitor implementation progress; b) develop work plan consistent with expected budget availability and potential tasks or projects; and c) integrate and manage the planning, permitting, environmental compliance, and coordinated implementation of contract actions. | A | ConAdmin | WE Budget Tab: Error-check and update actual spending (reflect contract close-out value) | | | Canceled | Richard Golden Jr (Inactive) | 10/03/2017 8:54 AM |
C | 119 | Manage and Administer Projects | Manage and Administer Contract | Provide effective implementation and administration: a) evaluate current workload and monitor implementation progress; b) develop work plan consistent with expected budget availability and potential tasks or projects; and c) integrate and manage the planning, permitting, environmental compliance, and coordinated implementation of contract actions. | B | CostSh01 | Facilitate inputting Cost Share information into Pisces at the Project level | 06/01/2018 | 06/30/2018 | Concluded | Richard Golden Jr (Inactive) | 10/10/2017 11:55 AM |
C | 119 | Manage and Administer Projects | Manage and Administer Contract | Provide effective implementation and administration: a) evaluate current workload and monitor implementation progress; b) develop work plan consistent with expected budget availability and potential tasks or projects; and c) integrate and manage the planning, permitting, environmental compliance, and coordinated implementation of contract actions. | C | SFTY | Comply with all applicable federal, state, tribal and local safety requirements, including reporting | 11/01/2017 | 06/30/2018 | Concluded | Richard Golden Jr (Inactive) | 10/03/2017 8:54 AM |
C | 119 | Manage and Administer Projects | Manage and Administer Contract | Provide effective implementation and administration: a) evaluate current workload and monitor implementation progress; b) develop work plan consistent with expected budget availability and potential tasks or projects; and c) integrate and manage the planning, permitting, environmental compliance, and coordinated implementation of contract actions. | D | DELIV | Effective implementation management and timely contract administration | | 06/30/2018 | Concluded | Richard Golden Jr (Inactive) | 10/04/2017 8:31 AM |
D | 189 | Coordination-Columbia Basinwide | Joint-training. | This Work Element funds WDFW to participate in joint training with ODFW and QCI to standardize snorkeling and efficiency survey efforts and bi-weekly conference calls to coordinate sampling efforts. Joint training will occur at a location most conducive to early-season winter survey efforts (e.g., the Asotin, Entiat, Wenatchee, Methow, Grande Ronde, Lemhi, or Secesh river) to be determined based on timing of winter water temperature (generally less than 9c) and/or cost-effectiveness of lodging, Joint-training will be necessary to ensure that methods are identical across WDFW, ODFW, and QCI snorkeling screws, and to develop estimates of crew to crew variation in density estimates at common sites. | A | DELIV | Joint training | | 12/01/2017 | Concluded | Richard Golden Jr (Inactive) | 10/04/2017 8:31 AM |
E | 157 | Collect/Generate/Validate Field and Lab Data | Conduct nighttime winter snorkel surveys. | This Work Element funds the Washington Department of Fish and Wildlife to conduct snorkel surveys at up to 50 sites previously surveyed by CHaMP within any/all of the following watersheds: Asotin, Entiat, Methow, and Wenatchee. The density of juvenile Chinook Salmon and rainbow trout/steelhead will be estimated using the "Protocol for Snorkel Surveys of Fish Densities v1.0 (https://www.monitoringresources.org/). Densities will be expanded to estimate total juvenile abundance at each CHaMP site using depletion or mark-recapture methods described in the protocol "ISEMP Field Manual of Scientific Protocols for Capture, handling, and Tagging of Wild Salmonid" (https://www.monitoringresources.org/). | A | EC | Environmental compliance requirements complete | 11/01/2017 | 11/10/2017 | Concluded | Richard Golden Jr (Inactive) | 10/03/2017 8:36 AM |
E | 157 | Collect/Generate/Validate Field and Lab Data | Conduct nighttime winter snorkel surveys. | This Work Element funds the Washington Department of Fish and Wildlife to conduct snorkel surveys at up to 50 sites previously surveyed by CHaMP within any/all of the following watersheds: Asotin, Entiat, Methow, and Wenatchee. The density of juvenile Chinook Salmon and rainbow trout/steelhead will be estimated using the "Protocol for Snorkel Surveys of Fish Densities v1.0 (https://www.monitoringresources.org/). Densities will be expanded to estimate total juvenile abundance at each CHaMP site using depletion or mark-recapture methods described in the protocol "ISEMP Field Manual of Scientific Protocols for Capture, handling, and Tagging of Wild Salmonid" (https://www.monitoringresources.org/). | B | Suggested | Process field samples/specimens | 11/01/2017 | 06/30/2018 | Concluded | Richard Golden Jr (Inactive) | 10/02/2017 12:49 PM |
E | 157 | Collect/Generate/Validate Field and Lab Data | Conduct nighttime winter snorkel surveys. | This Work Element funds the Washington Department of Fish and Wildlife to conduct snorkel surveys at up to 50 sites previously surveyed by CHaMP within any/all of the following watersheds: Asotin, Entiat, Methow, and Wenatchee. The density of juvenile Chinook Salmon and rainbow trout/steelhead will be estimated using the "Protocol for Snorkel Surveys of Fish Densities v1.0 (https://www.monitoringresources.org/). Densities will be expanded to estimate total juvenile abundance at each CHaMP site using depletion or mark-recapture methods described in the protocol "ISEMP Field Manual of Scientific Protocols for Capture, handling, and Tagging of Wild Salmonid" (https://www.monitoringresources.org/). | C | PUBPROTOCOL | Review, revise, and Publish protocol, study design, and methods in monitoringmethods.org | 11/01/2017 | 06/30/2018 | Concluded | Richard Golden Jr (Inactive) | 10/02/2017 12:49 PM |
| | | | | | | | | | | | |