Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 89673: 2007-397-00 EXP JOHN DAY TRIB/PASS & FLOW
Project Number:
Title:
John Day Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
89673
Contract Title:
2007-397-00 EXP JOHN DAY TRIB/PASS & FLOW
Contract Continuation:
Previous: Next:
86993: 2007-397-00 EXP JOHN DAY TRIB/PASS & FLOW
  • 91763: 2007-397-00 EXP JOHN DAY TRIB/PASS & FLOW
Contract Status:
Issued
Contract Description:
The John Day is the nation’s second longest free-flowing river in the contiguous United States and the longest containing entirely un-supplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance.

The goal of this project is to address limiting factors by implementing restoration actions that protect and restore passage, flow, and habitat for anadromous fish and listed species in the John Day River Basin. This includes the use of the John Day Basin Watershed Restoration Strategy to assist the Confederated Tribes of Warm Springs (CTWS), John Day Watershed Restoration Program with the ability to focus on implementing suites of restoration actions that will more effectively address priority-limiting factors.

The CTWS John Day River Watershed Restoration Strategy (2014) prioritized geographic areas with the greatest restoration potential for focal fish species, these areas were identified based on a synthesis of analytical results from the Ecosystem Diagnostic and Treatment model, Qualitative Habitat Assessments, and Technical Team review. Watersheds are delineated with a Restoration Potential Benefit (RPB) score along the range of low potential (0) to high potential (9). Within the Strategy, the target and focused restoration actions were identified for each Subbasin to have the most impact in addressing limiting factors.

The John Day River basin is within the CTWS ceded lands and supporting restoration efforts such as this project is an important part of maintaining cultural foods and fish populations. The mission of the CTWS Branch of Natural Resources Fisheries Department is to provide fisheries populations at harvestable levels for tribal members using information gained from research, management, production, and habitat programs while exercising co-management authority across ceded lands and usual and accustomed stations. In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office formed partnerships with local agencies and stakeholders to implement restoration actions.

In addition to Tribal Strategy, CTWS worked as part of the John Day Basin Partnership to collaboratively analyze the most current biological and physical habitat data to prioritize areas and actions for habitat restoration at the watershed level. The Partnership's Prioritization utilized the Atlas Framework to determined tier I, II, and III priority areas and prioritized hundreds of restoration projects that could be implemented within these areas. The goals are to assist partners to implement projects that will address the highest priority limiting habitat factors to benefit the limiting life stages for focal species within the basin.

Work implemented under this contract will cover restoration and conservation efforts in:

1. Structured Implementation and Monitoring (SIM) Framework - this is a joint effort between CTWS and ODFW to focus restoration and monitoring that will guide our efforts in the future. 2019 - 2022 will cover prioritized implementation in the Middle Fork Subbasin.
2. The John Day Basin Partnership – CTWS is one of 28 organizations signed onto a Memorandum of Understanding. The Partnership was awarded funding through OWEB’s Focused Investment Partnership (FIP) program in 2019 for 6 years of funding focused on native fish habitat. The Partnership uses the Atlas framework for prioritization of both native fish habitat and uplands restoration. CTWS works with the Partnership on projects covered under the FIP and located in priorities identified by the CTWS Watershed Restoration Strategy. The Atlas prioritization adds another level of focus and prioritization to the CTWS John Day River Watershed Restoration Strategy.
3. The Fox Creek watershed - work in this watershed was prioritized to improve juvenile steelhead rearing habitat several years ago. A geomorphic and habitat conditions assessment was completed in 2010. Work will continue in this area for several years, pending a collaborative effort between BPA and CTWS to justify continued restoration actions within the watershed.
4. The Resource Conservation and Partnership Project (RCPP) - CTWS was awarded an RCPP project for irrigation efficiency practices and conservation easements in the upper John Day and upper Middle Fork sub basins. This award spans 2018-2022 and will cover irrigation efficiency projects matched with BPA funding for irrigation diversion improvements and instream habitat projects.

Specific projects covered in this contract include:
1. NFJD – Fox Creek Reach 9 – Produce design.
2. NFJD – Fox Creek Reach 18 – Irrigation Project. Replace 3 unscreened diversions with 1 pump station and pivot. Related instream/riparian project completed in 2019. (continued from last contract)
3. NFJD – Fox Valley Juniper Treatment – Remove vegetation.
4. NFJD – Cottonwood Creek Cole-Engle Passage – Remove passage barrier.
5. MFJD – Caribou Creek Reconnection – Produce design.
6. MFJD – Davis Creek Habitat – Produce design.
7. MFJD – Oxbow Phase 6 and 7 – Produce design.
8. MFJD – Middle Fork Planting and Fencing. Work covers the collection of seed, propagation, and planting of native riparian plants, as well as protection from browse.
9. UJD – Upper John Day and Jeff Davis Creek Restoration – Produce design.
10. UJD – Upper John Day Juniper Treatment – Remove vegetation.
11. SFJD – Murderers Creek Riparian Plantings – Plant vegetation.
12. Effectiveness Monitoring covers large scale projects implemented through the CTWS Program, such as Fox Creek, the Middle Fork, and the Upper John Day. The purpose is to monitor the overall effectiveness of achieving project objectives, and relate those objectives back to the overarching goal of benefitting ESA listed steelhead and non listed Chinook salmon.
Account Type(s):
Expense
Contract Start Date:
02/01/2022
Contract End Date:
01/31/2023
Current Contract Value:
$2,060,895
Expenditures:
$0

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Manage Administer Projects 01/31/2023 12/31/2022
Completed Environmental Compliance Documentation B: 165. Produce Environmental Compliance Documentation 01/31/2023 12/31/2022
Complete Cultural Resource Surveys C: 165. Contract Cultural Resource Inventories 01/31/2023 11/01/2022
Outreach and Education D: 99. John Day Basin Office Education and Outreach 01/31/2023 08/01/2022
Watershed Coordination in the John Day Basin E: 191. CTWS Watershed Coordination in the John Day Basin 01/31/2023 12/31/2022
Project Concepts Developed F: 114. Identify and Select Projects in the John Day Basin 01/31/2023 12/31/2022
Design Review G: 175. RCPP Project Design 01/31/2023
Produce Design H: 175. NFJD - Fox Creek Reach 18 - Irrigation System Design (Carried forward from prior contract) 01/31/2023
Produce designs I: 175. NFJD - Fox Creek Reach 9 - Habitat Designs (Carried forward from prior contract) 01/31/2023
Complete juniper removal J: 199. NFJD - Fox Creek Valley Juniper Treatment 12/31/2022
Complete Project Monitoring and Maintenance K: 186. NFJD - Fox Creek Adaptive Management 01/31/2023 12/31/2022
Instream Diversion Complete L: 208. NFJD - Cottonwood Creek Cole-Engle Diversion Passage (Carried forward from prior contract) 10/31/2022 09/30/2022
Produce 60% designs M: 175. MFJD - Caribou Creek Reconnection - Produce Restoration Design (Carried forward from prior contract) 01/31/2023
Oxbow Ruby to Beaver Designs Produced N: 175. MFJD - Oxbow Phase 6 (Ruby to Beaver) Designs (Carried forward from prior contract) 01/31/2023
Oxbow Bluff Reach Designs Produced O: 175. MFJD - Oxbow Phase 7 (Coyote Bluffs) Designs (Carried forward from prior contract) 01/31/2023
Propagate and plant riparian plantings for the Middle Fork John Day River P: 47. MFJD - Middle Fork John Day Plant Propagation/Planting 01/31/2023 12/01/2022
Construction Management Complete Q: 100. MFJD - Vinegar to Vincent Construction Management 01/31/2023 12/31/2022
Davis Creek Habitat Restoration Design R: 175. MFJD - Davis Creek Habitat Restoration - Design (Carried forward from prior contract) 01/31/2023
Fence installation S: 40. MFJD - Subcontract oversight for Non-BPA Funded Fence Installation 01/31/2023 12/31/2022
Complete 60% Designs T: 175. UJD - Upper John Day and Jeff Davis Restoration Design 01/01/2023
Identify Project areas U: 174. UJD - Upper John Day Juniper Treatment - Design 01/31/2023 01/31/2023
Complete Juniper Removal V: 199. UJD - Upper John Day Juniper Treatment 01/01/2023
Complete riparian planting effort W: 47. SFJD - Murderers Creek Riparian Plantings 01/31/2023
Past planting sites maintained X: 198. Riparian Plant Maintenance 01/31/2023 12/31/2022
Produce accessible, error-checked datasets Y: 157. John Day Basin USGS Gauging Station Operations and Maintenance 01/31/2023 12/31/2022
Habitat and Passage Structures Monitored Z: 186. Implementation Effectiveness Monitoring 01/31/2023 12/31/2022
Produce accessible, error-checked datasets AA: 157. John Day Basin Project Effectiveness Temperature Monitoring 01/31/2023 12/31/2022
Produce accessible, error-checked datasets AB: 157. Fox Creek Effectiveness Monitoring 01/31/2023 12/31/2022
Produce accessible, error-checked datasets AC: 157. Upper and Middle Fork John Day Effectiveness Monitoring 01/31/2023 12/31/2022
Produce Annual Data Summaries and Reports AD: 162. Analysis and Interpretation of Field Data Collected From Fisheries and Non-Fisheries Surveys 01/31/2023 01/31/2023
Produce Fisheries data management plan and maintain project tracker AE: 160. Project and Fisheries Data Management 01/31/2023 12/31/2022
Completed Annual Report AF: 132. Submit Progress Report for the period February 2020 to January 2021 07/31/2022 06/30/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 199 Remove Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 174 Produce Plan
  • 6 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
  • 1 instance of WE 100 Construction Management
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 114 Identify and Select Projects
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 199 Remove Vegetation
  • 1 instance of WE 198 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 174 Produce Plan
  • 8 instances of WE 175 Produce Design
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
  • 1 instance of WE 100 Construction Management
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement
Lamprey, Pacific (Entosphenus tridentata)
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 114 Identify and Select Projects

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage Administer Projects 02/01/2022
B 165 Produce Environmental Compliance Documentation 02/01/2022
C 165 Contract Cultural Resource Inventories 02/01/2022
D 99 John Day Basin Office Education and Outreach
E 191 CTWS Watershed Coordination in the John Day Basin
F 114 Identify and Select Projects in the John Day Basin
G 175 RCPP Project Design 02/01/2022
H 175 NFJD - Fox Creek Reach 18 - Irrigation System Design (Carried forward from prior contract) 02/01/2022
I 175 NFJD - Fox Creek Reach 9 - Habitat Designs (Carried forward from prior contract) 02/01/2022
J 199 NFJD - Fox Creek Valley Juniper Treatment 09/01/2022
K 186 NFJD - Fox Creek Adaptive Management 02/01/2022
L 208 NFJD - Cottonwood Creek Cole-Engle Diversion Passage (Carried forward from prior contract) 07/06/2022
M 175 MFJD - Caribou Creek Reconnection - Produce Restoration Design (Carried forward from prior contract) 02/01/2022
N 175 MFJD - Oxbow Phase 6 (Ruby to Beaver) Designs (Carried forward from prior contract) 02/01/2022
O 175 MFJD - Oxbow Phase 7 (Coyote Bluffs) Designs (Carried forward from prior contract) 02/01/2022
P 47 MFJD - Middle Fork John Day Plant Propagation/Planting 05/24/2022
Q 100 MFJD - Vinegar to Vincent Construction Management
R 175 MFJD - Davis Creek Habitat Restoration - Design (Carried forward from prior contract) 02/01/2022
S 40 MFJD - Subcontract oversight for Non-BPA Funded Fence Installation
T 175 UJD - Upper John Day and Jeff Davis Restoration Design 02/01/2022
U 174 UJD - Upper John Day Juniper Treatment - Design 02/01/2022
V 199 UJD - Upper John Day Juniper Treatment 05/24/2022
W 47 SFJD - Murderers Creek Riparian Plantings
X 198 Riparian Plant Maintenance 06/06/2024
Y 157 John Day Basin USGS Gauging Station Operations and Maintenance 01/02/2023
Z 186 Implementation Effectiveness Monitoring 02/02/2022
AA 157 John Day Basin Project Effectiveness Temperature Monitoring
AB 157 Fox Creek Effectiveness Monitoring
AC 157 Upper and Middle Fork John Day Effectiveness Monitoring
AD 162 Analysis and Interpretation of Field Data Collected From Fisheries and Non-Fisheries Surveys
AE 160 Project and Fisheries Data Management
AF 132 Submit Progress Report for the period February 2020 to January 2021
AG 185 Periodic Status Reports for BPA