Effective implementation management and timely contract administration |
B: 119. Perform project management and administrative duties |
|
12/31/2023 |
12/31/2023 |
USFS Environmental Compliance on Yakama Nation Fisheries Projects |
D: 165. FY23 USFS NEPA 2017-164 |
|
12/31/2023 |
12/31/2023 |
Permit Level and Final Designs and Report for the Newby Narrows Project Area |
E: 175. Newby Narrows Phase 2 Design 2015-153 |
|
12/31/2023 |
|
Permit level Construction Plan for the Old Yeller Project Area of the Chewuch River |
F: 175. Chewuch Old Yeller (USFS) Designs 2019-208 |
|
12/31/2023 |
|
Conceptual Designs and Report for the Wolf Creek USFS Project |
G: 175. Wolf Creek USFS Conceptual Design 2021-213 |
|
12/31/2023 |
|
Confidential Water Rights Evaluation |
H: 154. Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 |
|
12/31/2023 |
|
Alternative Water Delivery Feasibility Assessment and Designs |
I: 175. Methow Basin EWD Instream Flow Project - Eng. Feasibility Assessment 2015-152 |
|
12/31/2023 |
|
Nason Creek N1 DOT Permit and Construction Level Designs |
J: 175. Nason Creek N1 DOT Design 2018-198 |
|
12/31/2023 |
|
Permit Level and Construction Level Restoration Plans for the Chiwawa River Outlet Project Area |
K: 175. Chiwawa Outlet Design 2019-205 |
|
12/31/2023 |
12/31/2023 |
Conceptual and Permit Level Designs and Reports for the Lower Chiwawa USFS Project |
L: 175. Lower Chiwawa USFS Design 2021-214 |
|
12/31/2023 |
12/31/2023 |
Lower Wenatchee Reach 3 Permitting and Final Construction Plans |
M: 175. Lower Wenatchee River Reach 3 Design 2017-186 |
|
12/31/2023 |
|
Permit and Final Designs for the Mad River (USFS) Project Area |
N: 175. Mad River USFS Design 2017-172 |
|
12/31/2023 |
12/31/2023 |
Conceptual Designs and Report for the Mad River Outlet Project Area |
O: 175. Mad River Outlet Design 2021-215 |
|
12/01/2023 |
|
Confidential Water Rights Evaluation |
P: 154. Entiat Basin MRO Instream Flow Project - Water Rights Consulting 2022-217 |
|
12/01/2023 |
|
Alternative Water Delivery Feasibility Assessment |
Q: 175. Entiat Basin MRO Instream Flow Project - Eng. Feasibility Assessment 2022-217 |
|
12/01/2023 |
|
Conceptual Designs and Report for the Stillwaters Fox Creek and Signal Peak Project Areas |
R: 175. Entiat Stillwaters/Fox Design 2019-210 |
|
12/31/2023 |
|
Construction Management Complete |
S: 100. Scaffold Camp Oversight 2015-146 |
|
12/31/2023 |
12/31/2023 |
Side Channel Restoration and Large Wood Habitat added into 0.4 miles of the Twisp River. |
T: 30. Scaffold Camp Construction 2015-146 |
|
12/31/2023 |
12/31/2023 |
Construction Management Complete |
U: 100. Entiat Silver Falls Restoration Oversight 2019-210 |
|
12/31/2023 |
12/31/2023 |
Large wood habitat elements added into 1 mile of the Entiat River |
V: 29. Entiat Silver Falls Restoration Construction 2019-210 |
|
12/31/2023 |
12/31/2023 |
Construction Management Complete |
W: 100. Upper Nason Creek Oversight 2020-207 |
|
12/31/2023 |
12/31/2023 |
Large wood habitat elements added into 2 miles of Nason Creek |
X: 29. Upper Nason Creek Construction 2020-207 |
|
12/31/2023 |
12/31/2023 |