Metric 1546: # of miles of fence installed in an estuarine area - Published
Metric Type ID:
1546
Metric Name:
# of miles of fence installed in an estuarine area
Metric Unit Type:
number
Is Numeric:
Yes
Precision:
0.01

Metric Guidance ID Description  Used on Work Elements
183 The length of fence treated in miles in the estuary zone. The estuary zone includes habitat that is part of a semi-enclosed coastal body of water that is subject to the ebb and flow of tides, with one or more rivers or streams flowing into it, and with a free connection to the nearshore marine zone. Estuaries are environments whose pH, salinity, and water levels are subject to the ebb and flow of tides, and the physical and chemical properties of the river that feeds the estuary and the ocean from which it derives its salinity. This habitat zone includes tidal wetland habitat. 40

1 Work Element Associated With Metric 1546: # of miles of fence installed in an estuarine area

Work Element Work Element Association Status Description FY Start FY End Guidance ID Guidance Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
40. Install Fence Expired Work to install various types of fence and/or gates for habitat improvement. If applicable, include cattle guards or water gaps for livestock as part of the deliverable. For riparian fencing, BPA recommends project sponsors include 50+ foot riparian buffers, or wider, based on the stream type, site specific dynamics, and current research. This work is not generally intended to be used for upland fencing for pasture rotation purposes. Upland fencing for fish will be considered on a case by case basis. Upland fencing is authorized for parcels managed for wildlife if this is part of a management plan to exclude livestock. 40. Install Fence should not be used for non-habitat purposes such as securing equipment or property; instead, use a milestone under the work element for which the property or equipment is used. 40. Install Fence should not be used for protection of new plantings; instead, use a milestone under 47. Plant Vegetation or 198. Maintain Vegetation.

If work is to repair a fence or exclusion device, use 186. Operate and Maintain Habitat/Passage/Structure . If a lease or other land use agreement of greater than 15 years is completed as part of the fence installation, you must also use 92. Lease Land in addition to 40. Install Fence (i.e., if you have an agreement for less than 15 years, only use 40. Install Fence). For a renewal of a lease or land use agreement that extends the period of protection, you must use 92. Lease Land instead of 40. Install Fence.
2010 2010 183 The length of fence treated in miles in the estuary zone. The estuary zone includes habitat that is part of a semi-enclosed coastal body of water that is subject to the ebb and flow of tides, with one or more rivers or streams flowing into it, and with a free connection to the nearshore marine zone. Estuaries are environments whose pH, salinity, and water levels are subject to the ebb and flow of tides, and the physical and chemical properties of the river that feeds the estuary and the ocean from which it derives its salinity. This habitat zone includes tidal wetland habitat. Required Yes No Yes C.5.d.2 Miles of fence along stream
Rationale:

Supports PCSRF/PNSHP (Katz):

Yes

PNSHP Metric Association Work Element
C.0 Salmonid Habitat Restoration and Acquisition
    C.5 Riparian Habitat Project
        C.5.d.1 Fencing
            C.5.d.2 Miles of fence along stream