Metric 1554: # of acres of estuarine wetland affected by treatment - Published
Metric Type ID:
1554
Metric Name:
# of acres of estuarine wetland affected by treatment
Metric Unit Type:
number
Is Numeric:
Yes
Precision:
0.01

Metric Guidance ID Description  Used on Work Elements
191 Includes off-channels after realignment. Wetland is defined as meeting the federal standard for wetland delineation under the Clean Water Act. This metric only applies to work in a pre-existing wetland or work which reconnects historic wetland. 30

1 Work Element Associated With Metric 1554: # of acres of estuarine wetland affected by treatment

Work Element Work Element Association Status Description FY Start FY End Guidance ID Guidance Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
30. Realign, Connect, and/or Create Channel Expired This work element is intended for adding sinuosity, meanders, side channels, and/or off-channel habitats (e.g., sloughs or oxbows). Actions include reconnection of historical channels, excavation of new channels, or actions that significantly alter channel planform, profile, and cross-section. Channel modifications should create diverse habitats (pools, riffles, glides and runs) while retaining characteristic features and forms over time. These actions should increase stream channel and/or side channel length and acreage. This WE may be the main emphasis of an aquatic habitat restoration project, or part of a larger habitat project.

Design review should be at 80% completion before contracting to help assure implementation and expenditure of contracted funds.

When this WE is used, the contract must also include 175. Produce Design . If work is solely to add structures/features within the existing channel, then use 29. Increase Aquatic and/or Floodplain Complexity . If structures are being added to resolve a fish passage barrier, use 184. Install Fish Passage Structure . If work is to create, restore, or enhance wetland function then use 181. Create, Restore, and/or Enhance Wetland
2010 2010 191 Includes off-channels after realignment. Wetland is defined as meeting the federal standard for wetland delineation under the Clean Water Act. This metric only applies to work in a pre-existing wetland or work which reconnects historic wetland. Required Yes No Yes C.9.c.3 Acres of estuary treated
Rationale:

Supports PCSRF/PNSHP (Katz):

Yes

PNSHP Metric Association Work Element
C.0 Salmonid Habitat Restoration and Acquisition
    C.9 Estuarine/Nearshore Project
        C.9.c.1 Channel modification
            C.9.c.3 Acres of estuary treated
30. Realign, Connect, and/or Create Channel