Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
View Work Elements Available in FY:

Summary

<<
<
>
>>
Metric 1669: # of tidegate partial passage barriers removed in the estuarine zone - Published
Metric Type ID:
1669
Metric Name:
# of tidegate partial passage barriers removed in the estuarine zone
Metric Unit Type:
number
Is Numeric:
Yes
Precision:
1.0

Metric Guidance ID Description  Used on Work Elements
306 The number of tidegate partial barriers to fish passage removed at a specified worksite in the estuarine zone.
-Tidegate: A structure providing an opening through which water may flow freely when the tide sets in one direction, but which closes automatically and prevents the water from flowing in the other direction.
-Partial barrier: A barrier to fish migration, preventing passage to specific life history stages. These barriers may be temporal in nature or limit passage due to obstructions, e.g., high flow, low flow, temperature, physical barriers, etc. or other variables that may allow some fish past, but not others.
-Estuarine: Habitat that is part of a semi-enclosed coastal body of water that is subject to the ebb and flow of tides, with one or more rivers or streams flowing into it, and with a free connection to the nearshore marine zone. This includes habitat impacted by the highest high and lowest low tides of a year. Estuaries are environments whose pH, salinity, and water levels are subject to the ebb and flow of tides, and the physical and chemical properties of the river that feeds the estuary and the ocean from which it derives its salinity. This habitat includes floodplain/riparian habitat subject to inundation from the tides.
85

1 Work Element Associated With Metric 1669: # of tidegate partial passage barriers removed in the estuarine zone

Work Element Work Element Association Status Description FY Start FY End Guidance ID Guidance Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
85. Remove/Breach Fish Passage Barrier Active Work that facilitates fish passage over a human-made barrier by breaching or removal without replacement. This includes dams, weirs, fish ladders, tidegates, culverts, bridges, and road crossings. If the dam is part of a diversion, use 208. Irrigation Infrastructure Construction or Replacement. If installing a fish passage structure at the same location, use 184. Install Fish Passage Structure, and have removal of the passage barrier as a milestone under that work element. 2011 306 The number of tidegate partial barriers to fish passage removed at a specified worksite in the estuarine zone.
-Tidegate: A structure providing an opening through which water may flow freely when the tide sets in one direction, but which closes automatically and prevents the water from flowing in the other direction.
-Partial barrier: A barrier to fish migration, preventing passage to specific life history stages. These barriers may be temporal in nature or limit passage due to obstructions, e.g., high flow, low flow, temperature, physical barriers, etc. or other variables that may allow some fish past, but not others.
-Estuarine: Habitat that is part of a semi-enclosed coastal body of water that is subject to the ebb and flow of tides, with one or more rivers or streams flowing into it, and with a free connection to the nearshore marine zone. This includes habitat impacted by the highest high and lowest low tides of a year. Estuaries are environments whose pH, salinity, and water levels are subject to the ebb and flow of tides, and the physical and chemical properties of the river that feeds the estuary and the ocean from which it derives its salinity. This habitat includes floodplain/riparian habitat subject to inundation from the tides.
Required Yes Yes Yes C.9.e.2 Tidegates altered/removed to allow fish passage
Rationale:

Supports PCSRF/PNSHP (Katz):

Yes

PNSHP Metric Association Work Element
C.0 Salmonid Habitat Restoration and Acquisition
    C.9 Estuarine/Nearshore Project
        C.9.e.1 Tidegate alteration/removal
            C.9.e.2 Tidegates altered/removed to allow fish passage
85. Remove/Breach Fish Passage Barrier