This page shows which work elements use this metric.
Work Element | Work Element Association Status | Description | FY Start | FY End | Guidance ID | Guidance | Required / Optional | Is Activated By Default | Included in PI | Supports PCSRF/PNSHP (Katz) | PNSHP Metric Code | PNSHP Metric |
---|---|---|---|---|---|---|---|---|---|---|---|---|
30. Realign, Connect, and/or Create Channel | Active | This work element is intended for adding sinuosity, meanders, side channels, and/or off-channel habitats (e.g., sloughs or oxbows). Actions include reconnection of historical channels, excavation of new channels, or actions that significantly alter channel planform, profile, and cross-section. Channel modifications should create diverse habitats (pools, riffles, glides and runs) while retaining characteristic features and forms over time. These actions should increase stream channel and/or side channel length and acreage. This WE may be the main emphasis of an aquatic habitat restoration project, or part of a larger habitat project. Design review should be at 80% completion before contracting to help assure implementation and expenditure of contracted funds. When this WE is used, the contract must also include 175. Produce Design . If work is solely to add structures/features within the existing channel, then use 29. Increase Aquatic and/or Floodplain Complexity . If structures are being added to resolve a fish passage barrier, use 184. Install Fish Passage Structure . If work is to create, restore, or enhance wetland function then use 181. Create, Restore, and/or Enhance Wetland |
2011 | 419 | TBD | Required | Yes | Yes | No |