Work Element 19: Replace/Maintain Instream Structure - Published
WE Name:
19. Replace/Maintain Instream Structure (Maint Instream Struc)
Work Category:
Habitat - Habitat/Passage O&M
WE Agreement Type:
Contracted
Status:
Expired
Definition:
Any activity aimed at replacing or maintaining the use of past installed structures. Maintenance includes adjusting structures moved during high flows or other events, and modifying existing structures to ensure that they continue to provide benefit.
WSE Description Template:
Effective Dates:
FY2005 to FY2005
Note on Expiration:
Work Phase:
Sort Sequence:
4.02
Focal Species Required:
No
RM&E Metadata Required:
No
Finite or Recurring:
Finite
Is BPA Internal:
No
Is Contracted:
Yes
Is Cost Share:
No
Is Construction:
No

Deliverable Status:
Required
Default Deliverable Desc:
Potential Deliverables:
  • Replaced and/or maintained:
  • large woody debris
  • boulders
  • J-hooks
  • barbs
  • cross veins
  • toe rocks
  • rootwad revetments
  • weirs


Milestone Title
Type
Deliverable?
Description

Inspection, replacement and/or maintenance of large woody debris
Suggested
No
Inspection, replacement and/or maintenance of boulders
Suggested
No
Inspection, replacement and/or maintenance of J-hooks
Suggested
No
Inspection, replacement and/or maintenance of barbs
Suggested
No
Inspection, replacement and/or maintenance of cross veins
Suggested
No
Inspection, replacement and/or maintenance of toe rocks
Suggested
No
Inspection, replacement and/or maintenance of rootwad revetments
Suggested
No
Inspection, replacement and/or maintenance of weirs
Suggested
No


Location Requirement Type:
No Location

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically not required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically not required for this work element.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #19 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Jan Brady (Inactive) 5
Joe Deherrera (Inactive) 3
Virgil Watts III 3
Jamie Cleveland (Inactive) 3
Jay Marcotte (Inactive) 3
Average Work Element Budget: $15,133
Average Duration: 8 months