Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
View Work Elements Available in FY:

Summary

<<
<
>
>>
Work Element 2: BPA Environmental Compliance - Published
WE Name:
2. BPA Environmental Compliance (BPA NEPA - Internal)
Work Category:
BPA Internal Operations
WE Agreement Type:
BPA Internal
Status:
Expired
Definition:
This is a BPA Internal-use only Work Element. Covers any work completed or managed by BPA's Environmental Compliance Group. For work performed by a contractor, use 165. Produce Environmental Compliance Documentation.
WSE Description Template:
Effective Dates:
FY2005 to FY2006
Note on Expiration:
Work Phase:
planning/design
Sort Sequence:
1.01
Focal Species Required:
No
RM&E Metadata Required:
No
Finite or Recurring:
Finite
Is BPA Internal:
Yes
Is Contracted:
No
Is Cost Share:
No
Is Construction:
No

Deliverable Status:
Required
Default Deliverable Desc:
NEPA Clearance
Potential Deliverables:

None


<p style="color:grey">None</p>
Location Requirement Type:
No Location

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically not required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically not required for this work element.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #2 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Jan Brady (Inactive) 5
David Kaplowe 3
Virgil Watts III 3
Peter Lofy 3
John Baugher (Inactive) 2
Average Work Element Budget: $1,805
Average Duration: 12 months