Work Element 24: Operate/Maintain Facility - Published
WE Name:
24. Operate/Maintain Facility (Operate Facility)
Work Category:
Habitat - Habitat/Passage O&M
WE Agreement Type:
Contracted
Status:
Expired
Definition:
Fish passage work that includes monitoring river conditions and operating passage facilities. Activities include inspecting and identifying passage facility's operation and passage concerns, and maintaining screens, gauges, and fish ways.
WSE Description Template:
Effective Dates:
FY2005 to FY2005
Note on Expiration:
Work Phase:
Sort Sequence:
4.04
Focal Species Required:
No
RM&E Metadata Required:
No
Finite or Recurring:
Finite
Is BPA Internal:
No
Is Contracted:
Yes
Is Cost Share:
No
Is Construction:
No

Deliverable Status:
Required
Default Deliverable Desc:
Potential Deliverables:
  • Functioning fish passage facilities
  • Functioning fish screens
  • Functioning gauges


Milestone Title
Type
Deliverable?
Description

Monitor passage conditions
Suggested
No
Monitor passage facilities
Suggested
No
Inspect passage conditions
Suggested
No
Inspect passage facilities
Suggested
No
Maintain passage facilities
Suggested
No
Monitor fish screen
Suggested
No
Inspect fish screen
Suggested
No
Maintain fish screen
Suggested
No
Removal of silt and/or gravel
Suggested
No


Location Requirement Type:
No Location

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically not required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically not required for this work element.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #24 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Sarah Branum (Inactive) 6
Jonathan McCloud 4
Kenneth Kirkman (Inactive) 2
Joe Deherrera (Inactive) 2
Virgil Watts III 2
Average Work Element Budget: $41,673
Average Duration: 11 months