Work Element 98: Other - Published
WE Name:
98. Other (Other)
Work Category:
Other
WE Agreement Type:
BPA Internal, Contracted
Status:
Active
Owner:
Definition:
In rare instances, a contractor may be performing a type of work that is fundamentally different than anything described by existing work elements. In such a case, the contractor should consult with his or her BPA project manager to determine if using the "Other" work element is appropriate.

Do NOT use "Other" to account for costs that will help you achieve other planned work. For example, equipment rental that will help with data collection should be included in 157. Collect/Generate/Validate Field and Lab Data, and purchasing large wood for future habitat work, even if it's in a subsequent contract, should be captured under 29. Increase Aquatic and/or Floodplain Complexity. This allows BPA to more accurately track spending on different types of work.
WSE Description Template:
Effective Dates:
FY2005 to <no end date>
Work Phase:
multiple
Sort Sequence:
9.01
Focal Species Required:
Yes
RM&E Metadata Required:
No
Finite or Recurring:
Finite
Is BPA Internal:
Yes
Is Contracted:
Yes
Is Cost Share:
No
Is Construction:
Yes

  • Do not use 98. Other for income producing activities; please use 194. Income-Producing Activities instead.
  • Do not use 98. Other to describe transferring fish for the purpose of re-establishing a population in different tributaries; please use 28. Trap and Haul instead.
  • 98. Other should not be used instead of an implementation work element to describe preparation or purchase of materials. For example, if you are purchasing large wood for an instream project that will be completed in a subsequent contract, you must use the implementation work element (in this case, 29. Increase Aquatic and/or Floodplain Complexity) and use metric values of zero to avoid double-counting. This allows BPA to more accurately track spending on different types of work.

Deliverable Status:
Required
Default Deliverable Desc:
Potential Deliverables:

None


  • Rule 1 (Environmental Compliance): Any ESA, cultural resources, NEPA, permitting, or other environmental compliance work should be split out under 165. Produce Environmental Compliance Documentation. Because 98. Other could include all sorts of activities, it always requires review by environmental compliance staff.

    Example:

    WE: 98. Other
    WE Title: Maintain gene bank inventory
    WE Description: Secure maintenance of the spring/summer Chinook salmon, steelhead, and other species' gamete samples.

    WE: 165. Produce Environmental Compliance Documentation
    WE Title: Obtain ESA compliance for gamete maintenance.

  • Rule 2 (Location of Work): If you are performing "other" work in various locations, you may lump these under a single work element. However, you may wish to break the work into separate work elements if it provides clarity or better supports project management. This does not require multiple work elements for 165. Produce Environmental Compliance Documentation.

    Examples:

    Option 1 (lumping):

    WE: 98. Other
    WE Title: Headstart program at Zoos
    WE Description: Oregon Zoo and Woodland Park Zoo will care for hatchling western pond turtles from fall through July of the following year when they are released back to the wild.

    Option 2 (splitting):

    WE: 98. Other
    WE Title: Headstart program at Oregon Zoo
    WE Description: Oregon Zoo will care for hatchling western pond turtles from fall through July of the following year when they are released back to the wild.

    WE: 98. Other
    WE Title: Headstart program at Woodland Park Zoo
    WE Description: Woodland Park Zoo will care for hatchling western pond turtles from fall through July of the following year when they are released back to the wild.

  • Rule 3 (Talk to your BPA COR): There are very few instances where 98. Other is the correct choice. Before using it, talk to your COTR about other possible options. This will help ensure BPA captures metric and budget data needed to enhance transparency in the Fish and Wildlife Program.


Milestone Title
Type
Deliverable?
Description

Environmental compliance requirements complete -New
Required
No
On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
Obtain written prior approval for use of WE “Other”
Required
No
Obtain written prior approval for use of this WE from BPA management; WE use is restricted by BPA policy.


Location Requirement Type:
Location Work Site in CBFish
Number of Locations:
1 - 100
Location Guidance:
Identify point at location where action will take place. You may enter more than one point for this work element. If a location already exists in Pisces, click the "Link" button to synchronize locations.

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically required for this work element which often includes a cultural/historic resource survey by a qualified archaeologist.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #98 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Tracy Hauser 25
Virgil Watts III 24
Brian McIlraith 21
Andrew Traylor 18
David Byrnes (Inactive) 17
Average Work Element Budget: $85,832
Average Duration: 10 months