2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION - PROJ DESIGN
Contract Start Date:
7/1/2016
Contract End Date:
6/30/2017
Title:
E: 29 - Install and maintain Beaver Dam Analogs (BDAs)
Description:
Fieldwork. Install beaver dam support (BDS) structures in Bridge Ck and other watersheds in the interior Columbia River basin as specified by EC, annual work plan and ISEMP Bridge Ck. IMW experimental design.

This WE is integrated with, but does not duplicate any work specified by, contract 71203 WE M (Eco Logical Research Inc). This WE will provide field technicians through existing NOAA contracting vehicles to assist with ISEMP Beaver Dam Analog restoration actions.

Other locations where BDA based work will be supported with design and construction actions are: Bear Creek (Bridge Creek, Lower John Day, with Watershed Council), Pine Creek (Lower John Day, with CTWSR), Camp Creek (Middle Fork John Day, with USFS), South Fork Crooked River (with Watershed Council and OSU). Other project opportunities may develop, and will be coordinated with COTR and BPA RME team as they arise.
WE Agreement Type:
Contracted
Deliverable Specification:
Install FY16 component of Beaver Dam Analog structures consisting of repairing previous years' component of Beaver Dam Support structures as described in the BCRMP Biological Opinion.

Support the design and implementation of Beaver Dam Analog based restoration in watersheds of the Columbia River Basin.
WSE Effective Budget:
$2,000
% of Total WSE Effective Budget:
1.14%
WSE Start:
07/01/2016
WSE End:
06/30/2017
WSE Completion:
06/30/2017
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $7,986 $2,000

5 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 7/1/2016 7/31/2016 Concluded Joseph Connor (Inactive) 4/23/2016 4:46:22 PM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).
B Suggested Discuss HIP3 ESA coverage with BPA EC lead; obtain HIP3 risk determination 7/1/2016 7/31/2016 Concluded Joseph Connor (Inactive) 4/23/2016 4:46:22 PM
Description: The EC Lead will determine if work under this work element may be able to have full ESA-coverage (NMFS & USFWS) under the 2013 Habitat Improvement Program Biological Opinion (HIP3). The HIP3 has expanded coverage for projects that may pose a moderate to high risk of impacting an ESA-listed species or critical habitat that would normally require a Biological Assessment. For work that qualifies, projects will undergo a review by the BPA-internal Restoration Review Team (RRT). Before conceptual design commences, contact the EC lead for HIP3 consideration, instruction, and information needs and requirements for coverage eligibility. The HIP3 activity categories and risk criteria are located in the “Note” section of the work element background page here:https://www.cbfish.org/WorkElement.mvc/Summary/165 .
C Implement Beaver Dam Analog based stream restoration actions 7/1/2016 6/30/2017 Concluded Chris Jordan 4/29/2016 1:55:50 PM
Description: Implement Beaver Dam Analog based stream restoration actions in coordination with field crews from Eco Logical Research - 2016 contract 71203. Other locations where BDA based work will be supported with design and construction actions are: Bear Creek (Bridge Creek, Lower John Day, with Watershed Council), Pine Creek (Lower John Day, with CTWSR), Camp Creek (Middle Fork John Day, with USFS), South Fork Crooked River (with Watershed Council and OSU). Other project opportunities may develop, and will be coordinated with COTR and BPA RME team as they arise.
D Design Beaver Dam Analog based stream restoration actions 7/1/2016 6/30/2017 Concluded Chris Jordan 4/29/2016 1:55:50 PM
Description: Participate in field visits and coordination meetings with collaborators to design Beaver Dam Analog (BDA) based stream restoration actions in watersheds of the interior Columbia River basin to support recovery of ESA listed stocks of anadromous salmonids. Other locations where BDA based work will be supported with design and construction actions are: Bear Creek (Bridge Creek, Lower John Day, with Watershed Council), Pine Creek (Lower John Day, with CTWSR), Camp Creek (Middle Fork John Day, with USFS), South Fork Crooked River (with Watershed Council and OSU). Other project opportunities may develop, and will be coordinated with COTR and BPA RME team as they arise.
E DELIV In-water work -- Beaver Dam Analogs 6/30/2017 Concluded Chris Jordan 4/29/2016 1:56:09 PM
Description: Install FY16 component of Beaver Dam Analog structures consisting of repairing previous years' component of Beaver Dam Support structures as described in the BCRMP Biological Opinion. Support the design and implementation of Beaver Dam Analog based restoration in watersheds of the Columbia River Basin.

Work Site ID Latitude Longitude State County Province Subbasin
29218 44.591313 -120.198938 Oregon Wheeler Columbia Plateau John Day

Primary Focal Species:
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened); Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered); Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened); Steelhead (O. mykiss) - Snake River DPS (Threatened); Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
Secondary Focal Species:
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU

This work element does not require RM&E metadata